Permit Information
Permit NumberBLD99-02702
StatusFinaled
Name WENSEL CONSTRUCTION
Site Address 2235 UNIVERSITY DR
Project NameCAPITOL VILLAGE BLDG 3
Customer Number 
ePlanReviewNo
Description
CAPITOL VILLAGE BUILDING #3 * TO CONSTRUCT A NEW 2810 SQ. FT., ONE STORY FUTURE RETAIL SHELL BUILDING. BUILT OF MASONRY AND WOOD FRAME CONSTRUCTION. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THIS IS A SHELL PERMIT ONLY. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMENT PERMIT IS REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. SITE GRADING AND DRAINAGE WAS SUBMITTED UNDER BLD99-02219. FIRE RISERS PROVIDED IN EACH BUILDING FOR FUTURE TENANT IMPROVEMENT. DRH99-0123/CUP99-0064/PC#712-99/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/22/2003  
Fee Review-notes10/20/199910/20/199910/24/2000 DONE
plancheck fee was pd on bld99-02669 and then 3 permits were added. transf. plan check fee
Letter of compliance  8/31/2000 DONE
Letter of Compliance 18546 issued 8-31-00.
BLD-Final8/15/20008/15/20008/15/2000PPASS
DetailsJim Storey
Added by Inspector: 301 On 8/15/2000 ok pending all sign offs. l/c
FIRE-Final Inspection7/27/20007/27/20007/27/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 07/27/2000 at 07:35:12. Contact: ###-####.
Print Occupancy Form  7/20/2000 DONE
FIRE-Final Inspection7/18/20007/19/20007/19/2000ANR
DetailsRick Jackson
bob wheeler ###-#### fire fn Awaiting sprinkler requirements 7/20/00 8:46:21 AM
Code Occupancy Approval  7/19/2000 PASS
ALL CONDITIONS HAVE BEEN MET, FINAL SIGNED OFF.
Print Occupancy Form  7/18/2000 DONE
FIRE-Sprinkler Rough-in6/21/20006/21/20006/21/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/21/2000 at 08:22:58. Contact: ###-####. - hydro okay
FIRE-Supply Line Flush6/12/20006/12/20006/12/2000PPASS
DetailsRick Jackson
fire--dave 989- 1180===bld #3 Flush ok 6/13/00 2:37:45 PM
Received Certificate of Value  6/12/2000 DONE
RECEIVED REVISED CERT. OF VALUE. ROUTED TO FILES, RECORDS INSPECTOR , LINDA HARTWELL. PROJECT VALUE $141,000 ELECT. $4,300 PLUMB. $4,300 FIRE SPRINKLER $1,000 KMM
FIRE-Final Inspection5/31/20005/31/20005/31/2000AFAIL
DetailsRick Jackson
David Gates ###-####; not ready for final
FIRE-Supply Line Flush5/30/20005/30/20005/30/2000PNR
DetailsRick Jackson
###-#### DAve Water valve not accessible- United Water to repair. 5/31/00 9:25:43 AM
FIRE-Supply Line Flush5/22/20005/23/20005/23/2000AFAIL
DetailsRick Jackson
###-#### Contractor not on site. 5/23/00 2:11:27 PM
FIRE-Supply Line Hydro5/22/20005/23/20005/23/2000PFAIL
DetailsRick Jackson
###-#### Contractor not available 5/24/00 3:02:57 PM
BLD-Framing/Rough-in3/16/20003/17/20003/17/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/16/2000 at 15:29:10. Contact: ###-####.
BLD-Framing/Rough-in3/9/20003/10/20003/10/2000PPASS
DetailsJim Storey
###-#### Shear ok. 3/14/00 11:27:28 AM
FIRE-Supply Line Flush2/28/20002/28/20002/28/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/28/2000 at 09:17:50. Contact: ###-####. Underground ok to cover. 3/1/00 10:56:17 AM
BLD-Framing/Rough-in2/2/20002/3/20002/3/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/02/2000 at 16:21:35. Contact: ###-####.
BLD-Framing/Rough-in1/31/20001/31/20001/31/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/31/2000 at 09:44:35. Contact: ###-####. placed with s.i report 2/1/00 9:08:24 AM
BLD-Framing/Rough-in1/27/20001/27/20001/27/2000PPART
Details
Scheduled by a contractor via Hello! on 01/27/2000 at 10:39:10. Contact: ###-####. made ok to pour with sp insp pending 1/27/00 6:39:12 PM
BLD-Framing/Rough-in1/25/20001/26/20001/26/2000APART
Details
Scheduled by a contractor via Hello! on 01/25/2000 at 16:57:21. Contact: ###-####. pending sp insp approvals 1/26/00 10:50:05 AM
BLD-Foundation12/20/199912/22/199912/22/1999AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/20/1999 at 15:18:08. Contact: ###-####. Engineer to address 1906.1-1906.3.12
(F) Reprint permit  10/22/1999 DONE
Issue PAID IN FULL permit  10/21/1999 DONE
Inspection Record Card- Bld  10/20/1999 DONE
Print Occupancy Form  10/20/1999 DONE
Plan assigned to (JCM)9/8/19999/8/199910/18/1999 PASS
DetailsJohn Menard
10/18/1999 15:15:40 JCM - activity updated through activity BLDA022 from case BLD99-02702.
Plan Reviewer's activity  10/18/1999 PASS
REVISIONS REVIEWED AND APPROVED AS SUBMITTED.
PLANS/APPL TAKEN TO FRONT DESK  10/18/1999 PASS
Plan resubmittals requested  10/12/1999 PEND
FAXED ANDY ERSTAD A REQUEST FOR ADDITIONAL REVISIONS BASED ON THE LAST SUBMITTALS RECEIVED 10/8/99.
Routing Off Site - STRUCTURAL9/8/19999/8/199910/4/1999 PASS
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Plan resubmittals requested  10/4/1999 PEND
FAXED ANDY ERSTAD A COPY OF THE COMMENT LIST FROM THE CONSULTING ENGINEER REQUESTING REVISIONS.
Routing - FIRE9/27/19999/28/19999/28/1999 PASS
Plan Review Completed(1st rev)  9/28/1999 PEND
Routing - PLUMBING9/17/19999/8/19999/21/1999 PASS
per plans and 97 upc
Routing - PLANNING9/14/19999/8/19999/16/1999 PASS
Approved by SAR and TKW
Routing - PUBLIC WORKS9/8/19999/8/19999/14/1999 PASS
Received Certificate of Value  9/8/1999 DONE
PLANS WERE SUBMITTED UNDER ONE PERMIT. CONTACTED ANDY ERSTAD TO SEPARATE INTO FOUR PERMITS. ONE PERMITFOR BUILDING 1a, 1b, 1c, 1d, #2 & #4. PROJECT VALUE FOR BUILDING #3 IS $155,000 ELECT.$4,300 PLUMB. $4,300 MECH. $14,000 FIRE SPRINKLER $1,000 KMM
Pending Assignment by MYS9/8/1999 9/8/1999 DONE
DetailsMarlene Southard
Fee Review-notes9/8/19999/8/19999/8/1999 DONE
LINDA THIS PERMIT WAS PERMITTED TOGETHER WITH BUILDINGS 1a, 1b, 1c, 1d #2 & #4 WITH A PROJECT VALUE OF $927,000. THE PLAN CHECK FEE IS UNDER BLD99-02669. I CONTACTED ANDY TO HAVE HIM SEPARATE INTO FOUR PERMITS. BLD99-02702 PROJECT VALUE IS $155,000. THANKS KMM
Application received  9/8/1999  
Plans ACCEPTED BY PLAN TECH  9/8/1999 DONE
Plans ACCEPTED BY PLAN TECH  9/8/1999  
Plan routing begun/NEW & ADDTN  9/8/1999