Permit NumberBLD99-02751
StatusFinaled
Name BOB ERLAND
Site Address 3668 N HARBOR LN
Project Name 
Customer Number 
ePlanReviewNo
Description
NEW MEDICAL OFFICE BUILDING. * TO CONSTRUCT A NEW SINGLE STORY 3,716 SQ. FT., TYPE VN, MEDICAL OFFICE BUILDING IN LAKE HARBOR. DRH99-0188 PC#726-99.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval1/20/20051/20/20051/20/2005 DONE
finaled without PW approval, no inspections, engineer letter requested 12/17/02, M.Strasser. Drive-by shows complete, 1/20/05 R.Rokovitz
Case Summary (BLD)  2/18/2004  
Fee Review-notes6/17/20036/17/20036/17/2003 DONE
Additional values from subcontractors.
Permanent Occupancy 7/10/20007/10/2000 DONE
Details
FIRE-Final Inspection7/10/20007/10/20007/10/2000PPASS
DetailsJoe Tawney
###-#### REinsp. ok for perm. occ. 7/11/00 11:37:33 AM
BLD-Final7/10/20007/10/20007/10/2000PPASS
DetailsTony Young
bob-- ###-#### fn Final C of O ok 7/11/00 11:48:32 AM
Permanent occupancy  7/10/2000 DONE
Perm. Occ. Cert. #8284 issued 7-10-00 to Lake Harbor Internal Medicine.
BLD-Final7/7/20007/7/20007/7/2000PFAIL
DetailsTony Young
bob ###-#### Fire not finaled/ front & back landings being worked on. 7/10/00 9:48:08 AM
FIRE-Final Inspection7/3/20007/5/20007/5/2000AFAIL
DetailsJoe Tawney
bob ###-#### final fail c/n issued 7/5/00 1:21:33 PM
BLD-Final7/5/20007/5/20007/5/2000PFAIL
DetailsTony Young
reinspection bob ###-#### c/n other trades not signed off- landings front& back needs to meet A.D.A. 7/6/00 8:19:10 AM
BLD-Final6/30/20007/3/20007/3/2000AFAIL
DetailsTony Young
bob ###-#### fire & L's not signed off-other items 7/3/00 11:07:48 AM
BLD-Framing/Rough-in3/2/20003/3/20003/3/2000APASS
DetailsRuss Owen
###-#### Needs fire dampers in 1hr ceiling. 3/3/00 1:42:17 PM
BLD-Framing/Rough-in3/1/20003/2/20003/2/2000AFAIL
DetailsRuss Owen
nailing pattern on the sheet rock Bob ###-#### No plans onsite. Talked with sheetrocker about setting them out. 3/2/00 2:25:45 PM
BLD-Framing/Rough-in2/4/20002/7/20002/7/2000APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/04/2000 at 18:44:33. Contact: ###-####.
BLD-Framing/Rough-in2/4/20002/4/20002/4/2000PCANC
DetailsRuss Owen
bob ###-#### re-ins r/i Recall for Monday. 2/7/00 1:28:07 PM
BLD-Framing/Rough-in1/31/20001/31/20001/31/2000PFAIL
DetailsJim Sly
bob ###-#### c\n truss clips continous gyp. behind intersecting walls 1 hr wall attic access or door in draft stop. 2/1/00 8:54:24 AM
BLD-Foundation12/3/199912/3/199912/3/1999PPART
Details
Scheduled by a contractor via Hello! on 12/03/1999 at 09:10:01. Contact: ###-####. R-bar placed almost done pouring address not maked on jobsite.
BLD-Footing12/1/199912/2/199912/2/1999APASS
DetailsWes Worcester
Scheduled by a contractor via Hello! on 12/01/1999 at 16:11:12. Contact: ###-####. Ftg. Ok.
BLD-Footing12/1/199912/1/199912/1/1999PFAIL
DetailsWes Worcester
Scheduled by a contractor via Hello! on 12/01/1999 at 10:00:36. Contact: ###-####. Rebar not in place.
(F) Reprint permit  11/5/1999 DONE
Routing Off Site - A.C.H.D11/4/199911/4/199911/4/1999 DONE
impact fee certificate 00-09157 11-4-99
Issue PAID IN FULL permit  11/4/1999 DONE
Routing - PLAN CHECK10/29/1999 11/2/1999 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/2/1999 PASS
Inspection Record Card- Bld  11/2/1999 DONE
Print Occupancy Form  11/2/1999 DONE
Plan assigned to (MLO)9/14/1999 11/2/1999 PASS
DetailsMike Otto
Routing - FIRE10/28/199910/29/199910/29/1999 PASS
Plan resubmittals received  10/28/1999 PEND
RECEIVED STRUCTURAL PLAN REVIEW COMMENTS AND PLANS FROM BOB EARLAND, FORWARDED SAME TO MIKE OTTO. 10/28/99 DAR
Routing - FIRE10/20/199910/20/199910/25/1999 FAIL
Needed parking stalls and hydrant location. Site access (existing or modified) not provided.
Plan Review Completed(1st rev)  10/25/1999 FAIL
Plans sent back to plan check
Routing - PLAN CHECK10/7/1999 10/20/1999 FAIL
Plan resubmittals requested  10/20/1999 FAIL
CORRECTIONS MAILED TO ARCHITECT. MLO
Routing - PLUMBING10/4/1999 10/8/1999 PASS
Routing - PLANNING10/8/1999 10/8/1999 PASS
approved per DRH99-0188.
Plan resubmittals received  10/5/1999 DONE
RECEIVED TWO COPIES OF REVISED SHEETSA-2, A-3, AND A-5. TWO COPIES OF STRUCTURAL CALCS. ROUTED TO MIKE OTTO. KMM
Routing - PUBLIC WORKS9/28/19999/28/199910/4/1999 PASS
Case Summary (BLD)  9/28/1999 PEND
Plans ACCEPTED BY PLAN TECH  9/28/1999 PASS
RECEIVED STRUCT. CALCS. SITE PLAN, COMPLETED APPLICATION, AND 5 COPIES OF CIVIL GRADING AND DRAINAGE. KMM
Plan routing begun/NEW & ADDTN  9/28/1999  
Plan resubmittals received  9/27/1999 PASS
RECEIVED PLAN RESUBMITTALS FROM MIKE FAIRCHILD, FORWARDED SAME TO MIKE OTTO. 9/27/99 DAR
9-27-99 RECEIVED FIVE COPIES OF CIVIL GRADING AND DRAINAGE, COMPLETED APPLICATION, TWO COPIES OF SITE PLANS, AND STRUCT. CALCS. PUT WITH PLANS TO ROUTE. KMM
Fee Review-notes9/13/19999/13/19999/13/1999 DONE
Plan assigned to (MYS)9/13/19999/13/19999/13/1999 DONE
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  9/13/1999 FAIL
PLANS INCOMPLETE. REQUIRES 1. STRUCT. CALCS
2. SITE PLAN
3. COMPLETED APPLICATION
CONTACTED MIKE FAIRCHILD ABOUT THE ABOVE ITEMS. KMM
Application received  9/13/1999  
Recd Pcfee & Taken To Pln CK  9/13/1999 DONE
Pending Assignment by MYS9/13/1999    