DOC - Permit Finaled | 1/22/2001 | 1/22/2001 | 1/22/2001 | P | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 1/22/2001 3:22:47 PM
|
BLD-Final | 7/5/2000 | 7/5/2000 | 7/3/2000 | P | PASS |
Russ Owen
|
|
|
temp handrail/ guardrail at entry
|
BLD-Final | 7/3/2000 | 7/3/2000 | 7/3/2000 | P | CANC |
Jim Storey
|
|
|
reinspection ###-#### trans to russ o. 7/3/00 1:20:27 PM
|
BLD-Final | 6/30/2000 | 6/30/2000 | 6/30/2000 | P | FAIL |
Russ Owen
|
|
|
call bryan at ###-#### complete c/n, 7/3/00 9:14:34 AM
|
BLD-Final | 6/28/2000 | 6/28/2000 | 6/28/2000 | P | FAIL |
Russ Owen
|
|
|
Brian ###-#### please call before you go out so that he can meet you out there. c/n 6/29/00 10:02:46 AM
|
BLD-Framing/Rough-in | 1/31/2000 | 1/31/2000 | 1/31/2000 | P | PASS |
Russ Owen
|
|
|
###-#### frame made ok ok for rock 2/1/00 8:46:36 AM
|
BLD-Energy code compliance | 1/28/2000 | 1/28/2000 | 1/28/2000 | P | FAIL |
Russ Owen
|
|
|
Also need mech. reinsp. ###-####; Brian. c\n posted 1/31/00 1:10:43 PM
|
BLD-Framing/Rough-in | 1/20/2000 | 1/20/2000 | 1/20/2000 | P | PART |
Jim Storey
|
|
|
###-#### call, must be present C/N, ok to insulate, need mech. C/N recalled for protection plates. Russ has engineers letter of approval. 1/21/00 8:54:39 AM
|
BLD-Framing/Rough-in | 12/15/1999 | 12/16/1999 | 12/16/1999 | P | FAIL |
Russ Owen
|
|
|
1:30 AS PER RUSS PUT TIME DOWN SHEAR WALL DOUG ###-#### Meet with engineer on site to resolve shear nailing etc.
|
BLD-Framing/Rough-in | 12/13/1999 | 12/14/1999 | 12/14/1999 | A | FAIL |
Russ Owen
|
|
|
shear wall --doug ###-#### or jim ###-#### fr Rear and sides covered with-out approval, front exposed wall needs work, left notice to have the engineer approve.
|
BLD-Foundation | 9/27/1999 | 9/27/1999 | 9/27/1999 | P | PART |
Russ Owen
|
|
|
JED-- ###-#### -20153 EXT-- FOUND Wall pour subject to letter from engineer as built, No per engineers design, contractor to provide letter.
|
BLD-Footing | 9/23/1999 | 9/23/1999 | 9/23/1999 | P | PASS |
Russ Owen
|
|
|
JED ###-####-20153
|
Issue PAID IN FULL permit | | | 9/23/1999 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 9/16/1999 | 9/16/1999 | 9/17/1999 | | PASS |
Steve Munroe
|
|
|
9/17/1999 11:24:05 SAM - activity updated through activity BLDA022 from case BLD99-02757.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/17/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/17/1999 | | DONE |
|
|
|
|
Telephone call | | | 9/17/1999 | | DONE |
|
|
|
called permit ready left message
|
Plan assigned to (DJO) | 9/13/1999 | | 9/16/1999 | | DONE |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 9/13/1999 | | 9/14/1999 | | DONE |
|
|
|
|
Routing - PLANNING | 9/13/1999 | | 9/14/1999 | | DONE |
|
|
|
|
Application received | | | 9/13/1999 | | |
|
|
|
|
Pending Assignment by MYS | 9/13/1999 | | | | |
Marlene Southard
|
|
|
|
Early Start Permit | | | | | HOLD |
|
|
|
early start see cond
|
Routing - PLAN CHECK | 9/14/1999 | | | | PEND |
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|