Permit Information
Permit NumberBLD99-02762
StatusFinaled
Name MICRON TECH
Site Address 8000 FEDERAL WAY
Project NameMIC #2-TA1 1ST & 2ND
Customer Number02-992662
ePlanReviewNo
Description
MICRON BUILDING #2 TA1, PHASE 2 REMODEL FOR PHOTO (#02-99-2662) - TO DEMOLISH AND REMOVE THE MAJORITY OF INTERIOR WALLS, CEILINGS AND MECHANICAL EQUIPMENT AT THE SOUTH HALF OF THE FIRST AND SECOND FLOORS OF BUILDING TWO; AND TO RECONSTRUCT THOSE AREAS TO RELOCATE EXIT CORRIDOR 100A, THE MENS AND WOMENS RESTROOM AND STAIRS 100G, AND CREATE NEW PHOTO BAY 9 AREAS AT THE FIRST FLOOR; AND TO RELOCATE EXIT CORRIDOR #200, THE MENS AND WOMENS RESTROOMS AND STAIR #200H, AND TO CREATE NEW MECHANICAL AREA #201E. THIS PERMIT ALSO INCLUDES DEMOLISH AND REMOVAL OF PORTIONS OF THE EXISTING CONCRETE FOUNDATION AND TUNNEL AREAS AND RECONSTRUCTING THOSE AREAS. THIS PERMIT ALSO INCLUDES STRUCTURAL WORK TO DO A SEISMIC UPGRADE ON THIS PORTION OF THE BUILDING. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. PC#732-99/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan resubmittals received  7/10/2002 DONE
Fee Review-notes3/30/20003/30/200010/24/2000 DONE
Letter of compliance  10/9/2000 DONE
Letter of Compliance #19945 issued.
FIRE-Final Inspection9/20/20009/21/20009/21/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 09/20/2000 at 07:41:06. Contact: ###-####.
BLD-Final9/20/20009/21/20009/21/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/20/2000 at 07:41:40. Contact: ###-####.
FIRE-Final Inspection8/23/20008/28/20008/28/2000AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/23/2000 at 07:42:13. Contact: ###-####.
Print Occupancy Form  7/28/2000 DONE
BLD-Conference7/11/20007/12/20007/12/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/11/2000 at 12:11:39. Contact: ###-####.10 00 am appt. w/wyane. 7/11/00 12:44:41 PM
BLD-Conference7/11/20007/12/20007/12/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/11/2000 at 12:11:39. Contact: ###-####.10 00 am appt. w/wyane. 7/11/00 12:44:41 PM
BLD-Wall cover6/16/20006/16/20006/16/2000PPART
DetailsJim Storey
###-#### stair and restaroom area south first floor ok. 6/19/00 12:26:11 PM
FIRE-Final Inspection6/6/20006/6/20006/7/2000PFAIL
DetailsRick Jackson
wayne ###-#### Corridor door and smoke detectors....
BLD-Final6/5/20006/6/20006/6/2000PPART
DetailsJim Storey
###-#### Wayne temp occ. ok for coridor 100 only copey of all sign offs with occ. card on file in bld.25. 6/8/00 10:03:07 AM
BLD-Framing/Rough-in6/1/20006/1/20006/1/2000PFAIL
DetailsJim Storey
Plan resubmittals received  5/24/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM HDR VIA MICRON , TWO SETS OF SHEETS A2.1.1, A2.1.4, A2.14A AND A3.0. FORWARDED SAME TO JIM STOREY. 5/23/00
BLD-Framing/Rough-in4/25/20004/26/20004/26/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/25/2000 at 14:11:11. Contact: ###-####. southstair framing ok need resubmital for as built at this location. 4/26/00 11:57:57 AM
FIRE-Conference4/14/20004/17/20004/17/2000APART
DetailsRick Jackson
###-#### Sprinkler requirements for AHU room 4/17/00 1:48:06 PM
(F) Reprint permit  4/13/2000 DONE
Inspection Record Card- Bld  4/13/2000 DONE
Print Occupancy Form  4/13/2000 DONE
(F) Reprint permit  4/13/2000 DONE
Receive PAYMENT IN FULL  3/22/2000 DONE
BLD-Framing/Rough-in3/17/20003/17/20003/17/2000APART
DetailsJim Storey
Rated wall const. at center 2nd floor TAL ok.
Print Occupancy Form  3/17/2000 DONE
BLD-Framing/Rough-in2/18/20002/22/20002/22/2000APASS
DetailsJim Storey
wayne ###-#### fr Clean Rm. skin sheet metal ok for cover on walls. 2/28/00 2:02:15 PM
Plan resubmittals received  1/31/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM HDR ENGINEERINGSHEET A2.10 SUB FLOOR PLAN. 1/31/00 DAR
BLD-Framing/Rough-in1/19/20001/20/20001/20/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/19/2000 at 11:17:22. Contact: ###-####. Conf. on 2hr area at service trench wall grid North/South. 1/20/00 4:16:29 PM
Plan Reviewer's activity  1/12/2000 PASS
REVIEWED REVISED STRUCTURAL PLANS TO INCLUDE USE OF METAL PAN DECK AT THE SECOND FLOOR LEVEL. AT JIM STOREY'S REQUEST, I E-MAILED DAVE WHITE REQUESTING THAT SOMEONE COME IN TO PICK UP THE APPROVED PLANS. I ALSO GAVE THE REVISE PLAN SHEETS AND CALCULATIONS TO ARCHIVES TO BE IMAGED.
Plan resubmittals received  1/4/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM CH2M HILL, KENT SOELBERG, FORWARDED SAME TO JOHN MENARD. SHEETS SO.2,S2.1.2, S4.2,S5.1,S5.3,S5.4, S5.3 AND CACULATIONS. 1/5/99 DAR
Received partial PAYMENT  12/15/1999 DONE
Issue & PRINT FEE-DUE permit  12/15/1999 DONE
Routing - PLAN CHECK10/5/199910/5/199912/8/1999 PASS
Plan assigned to (JCM)9/17/19999/17/199912/8/1999 PASS
DetailsJohn Menard
12/8/1999 14:29:33 JCM - activity updated through activity BLDA022 from case BLD99-02762.
Routing Off Site - STRUCTURAL12/6/1999 12/8/1999 PASS
RECEIVED REVIEW RESPONSE BACK FROM OUTSIDE ENG. ROUTED TO JOHN M. KMM 12-9-99 RECEIVED PLANS BACK FROM OUTSIDE ENG. ROUTED TO JOHN M. KMM
PLANS/APPL TAKEN TO FRONT DESK  12/8/1999 PASS
Inspection Record Card- Bld  12/8/1999 DONE
Plan resubmittals received  12/3/1999 DONE
RECEIVED THREE COPIES OF REVISED SHEETS SO.2, S2.0.1, S2.1.1, S2.1.2, S2.1.3, S2.1.4, S3.1, S3.2, S4.1, S4.2, S5.1, S5.2, S5.3, S5.4 AND THREE COPIES OF CALCULATIONS. ROUTED TO JOHN M. KMM
Plan resubmittals received  11/22/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM HDR VIA MESSENGER, FORWARDED SAME TO JOHN MENARD. 11/22/99 DAR
Plan resubmittals received  10/28/1999 DONE
RECEIVED TWO COPIES OF REVISED SHEETS A.2.1.4A A3.0 AND A7.0. ONE COPY OF RESPONSE TO PRELIMINARY PLAN REVIEW. ROUTED TO JOHN M.. KMM
Plan resubmittals received  10/27/1999 PEND
Received plan resubmittals from HDR engineering, forwarded same to John Menard. 10/17/99 dar
Routing Off Site - STRUCTURAL9/17/19999/17/199910/6/1999 FAIL
MARA PICKED UP ISSUE COPY TO MAKE A COPY OF PLANS FOR OUTSIDE ENG. WHEN SHE RETURNS I WILL SEND COPY TO OUTSIDE ENG. AND RETURN ISSUE COPY TO PW FOR THEM TO SIGN OFF. KMM
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Plan resubmittals requested  10/6/1999 PEND
FAXED MARA FOLEY AT HDR A COPY OF THE COMMENT LIST FROM THE CONSULTING STRUCTURAL ENGINEER REQUESTING REVISIONS.
Routing - FIRE10/1/199910/4/199910/4/1999 PASS
Plan Review Completed(1st rev)  10/4/1999 PEND
Routing - PLAN CHECK9/17/19999/17/199910/1/1999 PEND
Plan resubmittals requested  10/1/1999 PEND
E-MAILED DAVE WHITE AND MAILED HDR A COPY OF THE COMMENT LIST REQUESTING REVISIONS.
Received Certificate of Value  9/17/1999 DONE
Plans ACCEPTED BY PLAN TECH  9/17/1999 DONE
Routing - PUBLIC WORKS9/15/19999/15/19999/17/1999 PASS
Plan resubmittals received  9/17/1999 DONE
RECEIVED TWO COPIES OF REVISED SHEETA3.0. MARA PUT ONE COPY IN WITH OUTSIDE ENG. SET BEFOR I SENT THAN SET OUT. KMM
Plan routing begun/NEW & ADDTN  9/15/1999  
Application received  9/14/1999