BLD-Final | 2/4/2000 | 2/4/2000 | 2/4/2000 | P | FAIL |
Alan Hauser
|
|
|
bob ###-#### re-insp fn Need letter from engineer. 2/7/00 8:53:42 AM
|
BLD-Final | 2/3/2000 | 2/3/2000 | 2/3/2000 | P | FAIL |
Tom Arcoraci
|
|
|
Rich heaton ###-#### See C/Notice 1st place winner for worst final insp. 2/4/00 11:30:10 AM
|
BLD-Framing/Rough-in | 12/14/1999 | 12/14/1999 | 12/14/1999 | P | PASS |
Tom Arcoraci
|
|
|
rich ###-#### re-insp fr
|
BLD-Framing/Rough-in | 12/13/1999 | 12/13/1999 | 12/13/1999 | P | FAIL |
Tom Arcoraci
|
|
|
RICH ###-#### See C/Notice.
|
BLD-Framing/Rough-in | 12/9/1999 | 12/10/1999 | 12/10/1999 | A | FAIL |
Jim Sly
|
|
|
rich ###-#### C/N need mech R/I appr. & misc. framing corr.
|
BLD-Framing/Rough-in | 11/30/1999 | 11/30/1999 | 11/30/1999 | P | FAIL |
Tom Arcoraci
|
|
|
rich ###-#### C/N issued HD's misplaced.
|
BLD-Foundation | 11/2/1999 | 11/2/1999 | 11/2/1999 | P | PASS |
Tom Arcoraci
|
|
|
FOUND INSP--- DAVE ###-####
|
BLD-Footing | 11/1/1999 | 11/1/1999 | 11/1/1999 | P | PART |
Tom Arcoraci
|
|
|
RICH ###-#### FT ok
|
BLD-Footing | 10/29/1999 | 10/29/1999 | 10/29/1999 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### Not ready will re-call
|
Issue PAID IN FULL permit | | | 10/29/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/26/1999 | | DONE |
|
|
|
|
Telephone call | | | 10/26/1999 | | DONE |
|
|
|
called permit ready Rich at ###-####
|
Plan assigned to (SAM) | 9/20/1999 | 9/20/1999 | 10/25/1999 | | PASS |
Steve Munroe
|
|
|
10/25/1999 16:29:57 SAM - activity updated through activity BLDA022 from case BLD99-02774.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/1999 | | DONE |
|
|
|
|
BLD-Footing | 10/1/1999 | 10/1/1999 | 10/1/1999 | P | FAIL |
Tom Arcoraci
|
|
|
RICH ###-####/FOOTING TO CLOSE TO TOP OF SLOPE
|
Plan assigned to (DJO) | 9/15/1999 | | 9/20/1999 | | DONE |
Dan Overy
|
|
|
|
Routing - PLANNING | 9/15/1999 | | 9/15/1999 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 9/15/1999 | | 9/15/1999 | | DONE |
|
|
|
per terry records need letter from soils eng. accepting footing sub grade before pouring footing
|
Application received | | | 9/15/1999 | | |
|
|
|
|
Pending Assignment by MYS | 9/15/1999 | | | | |
Marlene Southard
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Early Start Permit | | | | | HOLD |
|
|
|
early start footing and foundation, see cond
|
Routing - PLAN CHECK | 9/16/1999 | | | | PEND |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Plan Reviewer's activity | | | | | PEN |
|
|
|
Called and talk to Rich Heaton. I got his designers phone number from him. I called and left a message for Chris to call me, the number Rich gave me ###-####. 09/30/99 I haven't recieved a call from Chris so, I called Rich back and he will try his designer and have him call me.
|