Case Summary (BLD) | | | 6/9/2016 | | DONE |
|
|
|
|
Fee Review-notes | 9/17/1999 | 9/17/1999 | 5/9/2001 | | DONE |
|
|
|
|
Letter of compliance | | | 5/8/2001 | | DONE |
|
|
|
Letter of Compliance #21491 issued 5-8-01.
|
BLD-Final | 5/4/2001 | 5/4/2001 | 5/4/2001 | P | PASS |
Carl Dependahl
|
|
|
Final reinspect ok; 5/4/2001 3:16:41 PM
|
Code Occupancy Approval | | | 4/30/2001 | | PASS |
|
|
|
Meets compliance with DRH99-00099 - Pass.
|
Case Summary (BLD) | | | 4/26/2001 | | DONE |
|
|
|
|
BLD-Final | 11/30/2000 | 12/1/2000 | 12/1/2000 | P | PART |
Carl Dependahl
|
|
|
###-####; ok for t/o, keep c/n 12/1/2000 4:35:55 PM
|
BLD-Conference | 12/1/2000 | 12/1/2000 | 12/1/2000 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/1/2000 9:47:58 AM w/ rick j.
|
Code Occupancy Approval | | | 12/1/2000 | | FAIL |
|
|
|
Bonded for sod and plant screen at the mech (a/c) on the west side of bldg. (3rd st.). $3,300. - Signed Temporary
|
FIRE-Final Inspection | 11/30/2000 | 11/30/2000 | 11/30/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 11/30/2000 2:28:16 PM will have door hardware for structural inspector 11/30/2000 2:29:14 PM
|
FIRE-Final Inspection | 11/28/2000 | 11/29/2000 | 11/29/2000 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 14:47:31. Contact: ###-####.//// door hardware and closure at basement door 11/29/2000 2:57:34 PM
|
BLD-Conference | 11/29/2000 | 11/29/2000 | 11/29/2000 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/29/2000 11:38:38 AM w/305r re stair
|
BLD-Final | 11/27/2000 | 11/28/2000 | 11/28/2000 | A | FAIL |
Carl Dependahl
|
|
|
###-####, cn, rails, steps, glazing,need other finals 11/28/2000 12:27:28 PM
|
BLD-Final | 11/21/2000 | 11/27/2000 | 11/27/2000 | A | NR |
Carl Dependahl
|
|
|
###-####
|
FIRE-Final Inspection | 10/4/2000 | 10/4/2000 | 10/4/2000 | P | FAIL |
Rick Jackson
|
|
|
###-#### 10/4/2000 4:07:07 PM not a final inspection - contractor wanted info on fire extinguisher placement 10/4/2000 4:08:02 PM
|
BLD-Framing/Rough-in | 9/13/2000 | 9/14/2000 | 9/14/2000 | A | PASS |
|
|
|
JERRY- ###-#### FR ok to cover 9/14/2000 9:22:26 AM
|
BLD-Framing/Rough-in | 9/1/2000 | 9/5/2000 | 9/5/2000 | A | PART |
|
|
|
Jerry ###-#### met with jerry, timand chris on the next step, al fire bocking and draft stopping to be in place, ok to insulate, need all damper details prior to cover of the basement ceiling 9/5/2000 10:11:44 AM
|
BLD-Framing/Rough-in | 8/24/2000 | 8/29/2000 | 8/29/2000 | A | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 08/24/2000 at 12:08:01. Contact: ###-####. no answer on the contact ; no resp person on the jobsite 9/1/2000 4:41:25 PM
|
BLD-Conference | 4/12/2000 | 4/13/2000 | 4/13/2000 | A | PART |
|
|
|
###-#### Tim call 1/2 hr. prior ing to seal all changes and his systems are to his specs 04/13/2000
|
BLD-Foundation | 2/18/2000 | 2/18/2000 | 2/18/2000 | P | PASS |
Jim Storey
|
|
|
###-#### Walls ok. 2/22/00 10:13:13 AM
|
BLD-Footing | 2/15/2000 | 2/15/2000 | 2/15/2000 | P | PASS |
Jim Storey
|
|
|
###-#### Archieved soil report & engineering for wall/ft change ft. east ok. engineer bar in place ok. 2/16/00 10:06:14 AM
|
Plan resubmittals received | | 12/7/1999 | 12/7/1999 | | FAIL |
|
|
|
no information to explain changes in plan reflected on the submittals recieved. called the arch to pick up incomplete plans and submit properly
|
Plan resubmittals received | | | 12/7/1999 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM BRIGGS ENGINEERING, STRUCTURAL ENGINEERING SHEETS RECEIVED. PLANS FORWARDED TO PERRY PAINE. 12/7/99 DAR
|
BLD-Foundation | 12/1/1999 | 12/3/1999 | 12/3/1999 | A | FAIL |
|
|
|
FOUNDATION WALL CLAY ###-####-727585 Need eng. Approvals.
|
BLD-Footing | 11/23/1999 | 11/23/1999 | 11/23/1999 | P | PART |
|
|
|
clay ###-####-727585 For lower footing only.
|
Inspection Record Card- Bld | | | 11/12/1999 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/12/1999 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/12/1999 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/3/1999 | 11/3/1999 | 11/10/1999 | | PASS |
|
|
|
RECEIVED RESUBMITTALS FROM ARCHITECT AND ENGINEER. REVIEWED AND INSERTED INTO PLANS. MADE ADDITIONAL CLARIFICATIONS BY PHONE WITH ENGINEER, JOHN MORTIN, BRIGGS ENGINEERING AND REDLINED PLANS WITH HIS RESPONSE AND TO CLARIFY AREAS NOT COMPLETELY COVERED BY ARCHITECTS RESPONSE TO PLAN REVIEW COMMENTS. PREPARING TO ROUTE FOR ISSUANCE OF PERMIT.
|
Case Summary (BLD) | | | 11/10/1999 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/10/1999 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/10/1999 | | PASS |
|
|
|
routing for issuance of permit
|
Plan assigned to (DRS) | 9/28/1999 | | 11/10/1999 | | PASS |
Dan Stuart
|
|
|
11/10/1999 19:32:25 DRS - activity updated through activity BLDA022 from case BLD99-02816.
|
Plan resubmittals received | | | 11/9/1999 | | DONE |
|
|
|
RECEIVED ONE COPY OF LETTER FROM ARCH. TWO COPIES OF REVISED PLANS SHEETS, COVER, A-1, A2.0, A5.0, A7.0, A8.0 & A9.0 TWO COPIES OF REVISED STRUC. DRAWINGS SHEETS S1.0, S2.0, S3.0 & S4.0 ROUTED TO DAN ST. KMM
|
Routing - FIRE | 11/2/1999 | 11/2/1999 | 11/2/1999 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 11/2/1999 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 11/1/1999 | | FAIL |
|
|
|
Copies of plan review corrections mailed and faxed to John Cook, Architect for response.
|
Case Summary (BLD) | | | 11/1/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 10/8/1999 | | 11/1/1999 | | FAIL |
|
|
|
Preliminary plan review completed. Corrections & clarifications required. Faxed & mailed copy of review to John Cook for response. Forwarding plans for Fire code analysis
|
Routing - PLUMBING | 10/15/1999 | 10/15/1999 | 10/19/1999 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/14/1999 | 10/14/1999 | 10/15/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 10/7/1999 | | 10/8/1999 | | PASS |
|
|
|
DRH99-00099
|
Plan resubmittals received | | | 10/7/1999 | | PEND |
|
|
|
Plan resubmittals received from John Cook architect, forwarde same to Dan Stuart. 10/8/99 DAR
|
Routing - PLUMBING | 10/4/1999 | | 10/6/1999 | | FAIL |
|
|
|
water heater detail, provide a plan showing required floor drainage in basement for water heater T&P termination, include sump detail or backwater valve, provide a floor drain for restroom with urinal water closet, existing system must be inspected and approved,premis protection required, thermol expantion protection may be required, additional cross connection protection may be required.
|
Routing - PUBLIC WORKS | 9/28/1999 | | 10/4/1999 | | FAIL |
|
|
|
REQUIRES 3 COPIES OF DRAINAGE PLANS PER BRIAN MURPHY. 10/4/99 DAR
|
Pending Assignment by MYS | 9/17/1999 | | 9/28/1999 | | DONE |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 9/28/1999 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLANNING, PLUMBING, PLAN CHECK and FIRE.
|
Received Certificate of Value | | | 9/21/1999 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/21/1999 | | PEND |
|
|
|
REQUIRES STRUC. CALCS. CONTACTED JOHN OF BRIGGS. HE STATED CALCS SHOULD BE HERE BY 9-22-99 KMM
|
Application received | | | 9/17/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 10/19/1999 | 10/19/1999 | | | |
|
|
|
|