Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD99-02842
StatusFinaled
Name LARRY WEISGERBER
Site Address 5018 W DENTON ST
Project Name 
Customer Number378-7462
ePlanReviewNo
Description
To install and setup double wide enhanced manufactured home per approved plans and manufacturers requirements. Work to include 157 lineal foot of concrete footings and foundation around perimeter of home and a 968 sq. ft. detached four car garage. Tie down documents must be at job site at time of inspection. Inspections are required prior to occupancy. A seperate electrical, plumbing and/or mechanical permits will also be required. PC #761 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled2/7/20012/7/20012/7/2001PPASS
DetailsTom Arcoraci
Added by Inspector: 408 On 2/7/2001 3:54:30 PM
BLD-Final2/29/20002/29/20002/29/2000PPASS
DetailsCarl Dependahl
###-#### Ok] 3/1/00 11:11:11 AM
BLD-Conference2/8/20002/8/20002/8/2000PPASS
DetailsCarl Dependahl
keep c/n, ok to use 15# felt for wall cover below siding
BLD-Framing/Rough-in1/31/20002/1/20002/1/2000PFAIL
DetailsCarl Dependahl
Larry Weisgerber- ###-####. c\n truss bracing headers at brg wall etc 2/3/00 7:29:37 AM
BLD-Conference11/5/199911/5/199911/5/1999APASS
Details
Conf. on ten sep. walls.
BLD-Footing10/20/199910/21/199910/21/1999APASS
DetailsCarl Dependahl
KURT-- ###-#### FT INSP
BLD-Footing10/14/199910/15/199910/15/1999AFAIL
DetailsCarl Dependahl
KURT ###-#### FT INSP Recall when ready
BLD-Foundation10/7/199910/8/199910/8/1999PPASS
DetailsCarl Dependahl
before 4pm Steve ###-####
BLD-Footing10/6/199910/7/199910/7/1999APASS
DetailsCarl Dependahl
Steve ###-#### Setback and footings ok
BLD-Foundation10/6/199910/6/199910/6/1999PFAIL
DetailsCarl Dependahl
Steve ###-#### early am \forms not in place
Issue PAID IN FULL permit  9/27/1999 DONE
Inspection Record Card- Bld  9/27/1999 DONE
Telephone call  9/24/1999 DONE
Plan assigned to (DJO)9/23/19999/23/19999/23/1999 PASS
DetailsDan Overy
9/23/99 13:18:03 DJO - activity updated through activity BLDA022 from case BLD99-02842.
PLANS/APPL TAKEN TO FRONT DESK  9/23/1999 DONE
Print Pending Permit.LaserJet4  9/23/1999 DONE
Plan assigned to (DJO)9/22/1999 9/23/1999 PASS
DetailsDan Overy
9/23/99 13:18:03 DJO - activity updated through activity BLDA022 from case BLD99-02842.
Plans ACCEPTED BY PLAN CHECK  9/23/1999  
Routing - PUBLIC WORKS9/22/1999 9/22/1999 DONE
fees paid to bench sewer
Routing - PLANNING9/22/1999 9/22/1999 DONE
Application received  9/22/1999  
Pending Assignment by MYS9/22/1999    
DetailsMarlene Southard
Pending Assignment by DJO9/22/1999   PEND
DetailsDan Overy
Routing - PLAN CHECK9/22/1999   PEND