Permit Information
Permit NumberBLD99-02843
StatusFinaled
Name CHERRY LANE CONSTRUCTION
Site Address 2949 S LADERA PL
Project NameSIERRA VISTA TOWNHMS
Customer Number 
ePlanReviewNo
Description
SIERRA VISTA TOWNHOMES UNIT TYPE "C" * TO CONSTRUCT A NEW TWO STORY, 1,397 SQ.FT. THREE BEDROOM, TWO AND ONE-HALF BATHROOM, TOWNHOME ON ZERO LOT LINE, WITH AN ATTACHED 398 SQ.FT. TWO CAR GARAGE, AND A 100 SQ.FT. CONCRETE PATIO. THE FIRST FLOOR IS APPROXIMATELY 691 SQ.FT. IN AREA AND THE SECOND FLOOR IS APPROXIMATELY 706 SQ.FT. IN AREA. THIS UNIT TYPE HAS BEEN CHANGED FROM A TYPE '"D" TO TYPE "C" UNIT (11/4/99). MJP CU-76-92 DRH-98-0137
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/19/20006/20/20006/20/2000PPASS
DetailsJim Storey
Jeff ###-####
BLD-Final6/9/20006/9/20006/9/2000PFAIL
DetailsJim Storey
Jeff ###-####
BLD-Framing/Rough-in3/29/20003/29/20003/29/2000PPASS
DetailsJim Storey
fire wall
BLD-Framing/Rough-in3/29/20003/29/20003/29/2000PPASS
DetailsJim Storey
fire wall
BLD-Framing/Rough-in3/27/20003/27/20003/27/2000PFAIL
DetailsTom Arcoraci
###-#### Not ready 3/28/00 9:04:10 AM
BLD-Energy code compliance3/27/20003/27/20003/27/2000PFAIL
DetailsTom Arcoraci
Not ready 3/28/00 9:04:17 AM
BLD-Framing/Rough-in3/23/20003/23/20003/23/2000PPASS
DetailsJim Storey
jeff ###-####//shear wall
BLD-Framing/Rough-in2/9/20002/9/20002/9/2000PPART
DetailsJim Storey
###-#### fire wall 1st floor ok
BLD-Foundation1/26/20001/26/20001/26/2000PPASS
DetailsBob Archibald
dane ###-####
BLD-Footing1/25/20001/25/20001/25/2000APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/25/2000 at 06:21:57. Contact: ###-####.
Receive PAYMENT IN FULL  11/17/1999 DONE
Plan assigned to (M_P)11/3/199911/3/199911/5/1999 PASS
DetailsMike Phillips
11/5/1999 10:07:33 M_P - activity updated through activity BLDA022 from case BLD99-02843.
CHANGE STATUS TO (P)  11/5/1999  
Status changed to modify building unit type.
Print Pending Permit.LaserJet4  11/5/1999 DONE
CHANGED BUILDING TYPE.
Plan Reviewer's activity  11/5/1999 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/5/1999 DONE
Changed unit type.
Print Pending Permit.LaserJet4  11/5/1999 DONE
Case Summary (BLD)  11/5/1999 DONE
Inspection Record Card- Bld  11/5/1999 DONE
Routing - PUBLIC WORKS11/3/1999 11/4/1999 DONE
Rerouting for unit type change.
Routing - PLANNING11/3/1999 11/4/1999 DONE
Rerouting for unit type change.
Routing - PLANNING11/4/199911/4/199911/4/1999 DONE
CHANGED BLDG ON SAME LOT
Issue PAID IN FULL permit  10/7/1999 DONE
Inspection Record Card- Bld  9/29/1999 DONE
Inspection Record Card- Bld  9/29/1999 DONE
Telephone call  9/29/1999 DONE
TALKED TO KINGS TO VERIFY PLANS ARE READY
Routing - PUBLIC WORKS9/22/1999 9/27/1999 DONE
Routing - PLAN CHECK9/27/19999/27/19999/27/1999 DONE
Plan Reviewer's activity  9/27/1999 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/27/1999 DONE
Print Pending Permit.LaserJet4  9/27/1999 DONE
Case Summary (BLD)  9/27/1999 DONE
Plan assigned to (M_P)9/22/1999 9/27/1999 PASS
DetailsMike Phillips
9/27/1999 15:16:19 M_P - activity updated through activity BLDA022 from case BLD99-02843.
Routing - PLANNING9/22/1999 9/24/1999 DONE
needs fire sprinklers
Plan Reviewer's activity  9/22/1999 PEND
Prior approval of this unit.
Application received  9/22/1999