Permit Information
Permit NumberBLD99-02856
StatusFinaled
Name EMPIRE BUILDING (PHASE 2)
Site Address 205 N 10TH ST
Project NameEMPIRE BUILDING
Customer Number 
ePlanReviewNo
Description
(EMPIRE BUILDING - PHASE 2) This building is fire sprinklered under the provisions of the 1994 UCBC to allow it to be 2 stories and 26 feet too tall. To construct the infrastructure for building electrical, plumbing, mechanical, fire alarm, and fire sprinkler systems. Work shall comply with the 1999 NEC, 1997 UPC, 1997 UMC, NFPA 72-1996, and NFPA 13-1996. The structural upgrade (Phase 1) was permitted under permit BLD99-02572. PC-759-99 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/8/20011/8/20011/8/2001PPASS
See bld00-03048 for signatures ok per Carl Westfall
FIRE-Final Inspection1/8/20011/8/20011/8/2001 PASS
See bld99-03235 for sign off
Letter of compliance  1/8/2001 DONE
Letter of Compliance #21315 issued 1-8-01.
Print Occupancy Form  1/8/2001 DONE
FIRE-Hydro test above ground11/15/200011/16/200011/16/2000PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/15/2000 at 15:15:39. Contact: ###-####./////hydro okay only 11/16/2000 3:59:40 PM
Issue PAID IN FULL permit  1/6/2000 DONE
Routing - PLAN CHECK12/1/1999 12/3/1999 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/3/1999 PASS
Inspection Record Card- Bld  12/3/1999 DONE
Telephone call  12/3/1999 DONE
called Joe ###-####
Plan assigned to (CJW)9/23/1999 12/3/1999 PASS
DetailsCarl Westfall
12/3/99 14:10:21 CJW - activity updated through activity BLDA022 from case BLD99-02856.
Routing - PUBLIC WORKS11/23/1999 12/1/1999 DONE
Plan resubmittals received  11/24/1999 DONE
RECEIVED ONE COPY OF ADDENDUM NO. ONE AND ADDENDUM NO. TWO FROM AGA MICHAEL G. SIMMONDS. ROUTED TO CARL W. KMM
Routing - PLAN CHECK11/1/1999 11/23/1999 PASS
Plan Review Completed(1st rev)  11/1/1999 PEND
Routing - FIRE10/27/1999 11/1/1999 PASS
Plans failed, but resubmittals required before installation. This is for preliminary fire alarm review.
Routing - PLAN CHECK10/4/1999 10/29/1999 PASS
Plan Reviewer's activity  10/28/1999 PASS
UBC plan review started October 28, 1999 and finished October 29, 1999. The drawings were approved with conditions. See the conditions list.
Routing - PLUMBING9/29/1999 10/4/1999 PASS
per plans and 97 upc, rain water system to be min.4" at 1/4" per foot
Routing - PUBLIC WORKS9/23/1999 9/29/1999  
Requires futher examination of sewage discharge, per Brian Murphy. 9/29/99 DAR
Pending Assignment by MYS9/22/1999 9/23/1999 DONE
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  9/23/1999 PASS
Received Certificate of Value  9/23/1999 PASS
Fee Review-notes9/22/19999/22/19999/22/1999 DONE
Application received  9/22/1999  
Recd Pcfee & Taken To Pln CK  9/22/1999 DONE
Plan routing begun/TENANTS    DONE
This plan needs to route to PUBLIC WORKS, PLUMBING, FIRE (for preliminary look at the alarm system) and PLAN CHECK.