Permit NumberBLD99-02959
StatusFinaled
Name WASHINGTON FEDERAL SAVINGS
Site Address 10178 W FAIRVIEW AVE
Project NameNEW BUILDING
Customer Number 
ePlanReviewNo
Description
NANCY GEARHARD RETAIL BUILDING * TO CONSTRUCT A 5,175 SQ. FT. TYPE VN , SINGLE STORY MERCANTILE BUILDING. BOTH THE HEALTH FOOD STORE AND THE SHOE SHOP ARE UNDER THE SAME OWNERSHIP AND ARE CONSIDERED AS A SINGLE TENANT. IF BUSINESSES ARE SOLD TO SEPARATE OWNERS IN THE FUTURE A TENANT DEMISING WALL BETWEEN OCCUPANCIES WILL BE REQUIRED UNDER A SEPARATE PERMIT. PARKING LOT IS EXISTING, UNDER DRH97-00157 AND BLD97-01966. DRH99-0153 IS FOR THE BUILDING. PC#784-99 PLAN MODIFICATION HAS ADDED 3, 295 SQ. FT. OF SINGLE STORY RETAIL SHELL ONLY SPACE TO THE BUILDING. NO OCCUPANCY OF THE SHELL PORTION IS ALLOWED PER THIS PERMIT. SEPARATE PLANS AND PERMITS ARE REQUIRED FOR THE TENANT IMPROVEMENTS. ALL ADDITIONAL WORK FOR THE MODIFICATION IS PER APPROVED PLANS AND ATTACHMENTS. TOTAL BUILIDLNG SQUARE FOOTAGE IS NOW 8,470 SQ. FT.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/16/20036/16/20036/16/2003 DONE
Fee Review-notes6/16/20036/16/20036/16/2003 DONE
Fee Review-notes9/30/19999/30/19993/21/2001 DONE
Permanent Occupancy 8/14/20008/14/2000 DONE
Details
Permanent occupancy  8/14/2000 DONE
Perm. Occ. Cert. #8330 issued 8-14-0 to the Nancy Gearhard Retail Building.
BLD-Final8/10/20008/10/20008/10/2000PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/10/2000 at 09:54:45. Contact: ###-####. ok 8/11/2000 8:16:19 AM ok for perm occ after achd signs 8/11/2000 8:17:23 AM
FIRE-Final Inspection7/19/20007/20/20007/20/2000APASS
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 07/19/2000 at 12:47:57. Contact: ###-####. Reinsp. ok for cert. of compl. 7/20/00 1:20:49 PM
Code Occupancy Approval  7/20/2000 PASS
Meets compliance with DR/Phase 1 - Pass
FIRE-Final Inspection7/18/20007/18/20007/18/2000PFAIL
DetailsJoe Tawney
gregg ###-#### Final fial test AHV duct detectors 7/19/00 10:06:13 AM
BLD-Framing/Rough-in6/13/20006/14/20006/14/2000APASS
DetailsTom Arcoraci
ceiling grid greg ###-#### Grid ok 6/15/00 11:33:11 AM
BLD-Framing/Rough-in5/23/20005/24/20005/24/2000APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 05/23/2000 at 12:04:29. Contact: ###-####.
BLD-Framing/Rough-in5/19/20005/22/20005/22/2000AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/19/2000 at 08:12:26. Contact: ###-####. C/N: trusses, bots, etc. 5/23/00 2:36:14 PM
BLD-Footing4/19/20004/20/20004/20/2000PPART
DetailsAlan Hauser
###-#### Int. footing. 4/21/00 9:15:13 AM
BLD-Foundation4/10/20004/10/20004/10/2000PPASS
DetailsTom Arcoraci
###-#### stem wall
BLD-Footing4/6/20004/7/20004/7/2000APART
DetailsTom Arcoraci
###-####
Receive PAYMENT IN FULL PRINT  4/7/2000 DONE
Print Occupancy Form  4/6/2000 DONE
Inspection Record Card- Bld  4/6/2000 DONE
Routing - PLUMBING4/3/2000 4/5/2000 DONE
PLAN MODIFICATION
Plan assigned to (MLO)2/28/2000 4/5/2000 DONE
DetailsMike Otto
plan modification.
(F) Reprint permit  4/4/2000 DONE
Routing - FIRE3/27/20003/30/20003/30/2000 PASS
DetailsBill Alexander
plan modification. Require hydrant fire flow available before occupancy.
Plan Review Completed(1st rev)  3/30/2000 PASS
DetailsBill Alexander
Routing - PLAN CHECK3/24/2000 3/28/2000 PASS
plan modification.
Routing - PUBLIC WORKS3/13/2000 3/24/2000 PASS
Routing Off Site - STRUCTURAL2/28/2000 3/20/2000 PASS
PLAN MODIFICATION. CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
3/20/2000 RECEIVED PLANS AND STRUCTURAL REVIEW RESPONSE FROM OUTSIDE ENG. ROUTED TO MIKE OTTO. KMM
Temporary occupancy  3/17/2000 PART
Temp. Occ. Cert. #3991 issued 3-17-00 to the Nancy Gearhard Bldg.
Plan resubmittals received  3/17/2000 PEND
RECEIVED PLAN RESUBMITTALS FROM HABITEC ARCHITECTS TWO SETS OF SHEETS A2.1 AND A3.1 FORWARDED SAME TO MIKE OTTO. 3/17/00 DAR
Routing - PLUMBING3/8/2000 3/10/2000 FAIL
plan modification.
BLD-Final3/8/20003/8/20003/8/2000PPASS
DetailsTom Arcoraci
###-#### Ok for perm. 3/9/00 11:37:17 AM
Routing - PLANNING3/3/2000 3/8/2000 PASS
Approve per DRH00-25 plan modification.
BLD-Final3/7/20003/7/20003/7/2000PFAIL
DetailsTom Arcoraci
Greg ###-#### No CDH inspection. 3/8/00 10:38:43 AM
Routing - PUBLIC WORKS2/28/2000 3/3/2000 FAIL
PLAN MODIFICATION
REQUIRES DRAINAGE PLAN PER BRIAN MURPHY. 3/3/00 DAR
FIRE-Final Inspection2/29/20002/29/20002/29/2000PPASS
DetailsJoe Tawney
Greg ###-#### Reinsp. ok for perm. occ. 3/1/00 11:18:39 AM
Plan Modification Accepted  2/28/2000 DONE
Code Occupancy Approval  2/28/2000 FAIL
Bond in the amount of $1,050.00 posted for the remaining landscaping. Signed Temporary Occupancy.
Plans ACCEPTED BY PLAN TECH  2/28/2000 DONE
PLAN MODIFICATION. CONTACTED TOM A. ( INSPECTOR) TO LET HIM KNOW THAT I RECEIVED PLAN MODIFICATION. KMM
Received Certificate of Value  2/28/2000 DONE
PLAN MODIFICATION. KMM
Plan routing begun/NEW & ADDTN  2/28/2000 DONE
PLAN MODIFICATION. KMM
FIRE-Final Inspection2/25/20002/25/20002/25/2000PFAIL
DetailsJoe Tawney
###-#### Final fail c/N issued signage & curb striping. 2/28/00 2:16:32 PM
Code Occupancy Approval  2/23/2000 FAIL
Inspection reveals still need sod at the are on Fairview and on the west side of the building. They will need to post bond for temp. occ. - instructed to fax information for bonding.
FIRE-Final Inspection2/22/20002/22/20002/22/2000PFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 02/22/2000 at 08:29:00. Contact: ###-####. Final fail alot ready for inspection construction not completed. 2/23/00 11:38:24 AM
BLD-Framing/Rough-in2/14/20002/14/20002/14/2000PPASS
DetailsTom Arcoraci
###-#### Grid ok. 2/15/00 10:39:24 AM
BLD-Final1/13/20001/14/20001/14/2000AFAIL
DetailsTom Arcoraci
###-#### GREG Not a final framing ok. 1/14/00 3:03:07 PM
BLD-Framing/Rough-in12/31/19991/3/20001/3/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/31/1999 at 09:39:32. Contact: ###-####. Ok to side see C/notice.
BLD-Framing/Rough-in12/30/199912/30/199912/30/1999PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/30/1999 at 09:41:17. Contact: . Unable to inspect due to time.
(F) Reprint permit  11/29/1999 DONE
Routing Off Site - A.C.H.D11/24/199911/24/199911/24/1999 DONE
brought in ACHD impact cert dated 11-24-99
Issue PAID IN FULL permit  11/24/1999 DONE
Inspection Record Card- Bld  11/16/1999 DONE
Print Occupancy Form  11/16/1999 DONE
Plan assigned to (MLO)10/1/1999 11/15/1999 DONE
DetailsMike Otto
PLANS/APPL TAKEN TO FRONT DESK  11/15/1999 PASS
Routing Off Site - C.D.H11/10/199911/10/199911/10/1999 PASS
plans sent to plan check 11/12/1999
Telephone call  10/27/1999 PEND
CALLED WES STEELE ARCHITECT TO TAKE PLANS TO C.D.H. FOR REVIEW AND APPROVAL AND RETURN. MLO
Routing - PLAN CHECK10/25/1999 10/26/1999 PASS
Routing Off Site - STRUCTURAL10/22/1999 10/25/1999 PASS
SENT RESUBMITTALS VIA PDQ TO CONSULTANTING ENGINEER. 10/22/99/
Plan resubmittals received  10/25/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM WES STEELE OF HABITEC ARCHITECTS FORWARDED SAME TO MICHAEL OTTO. 10/25/99 DAR
Plan resubmittals requested  10/21/1999 PEND
engineer is requesting sheet S-1 and plan review requesting sheet with revised header if not on S-1. fax sent to architect. MLO
Plan resubmittals received  10/21/1999 PEND
Received plan resubmittals from Wes Steele, forwarded same to Mike Otto. 10/21/99
Plan resubmittals received  10/20/1999 DONE
RECEIVED ONE COPY OF RESPONSES TO COMMENTS THAT WERE SUBMITTED. ROUTED TO MIKE OTTO. KMM
Routing - FIRE10/15/199910/19/199910/19/1999 PASS
Plan Review Completed(1st rev)  10/19/1999 PEND
plans to plan check
Routing Off Site - STRUCTURAL10/4/1999 10/18/1999 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Plan resubmittals requested  10/18/1999 FAIL
Structrual corrections faxed to architect. MLO
Plan resubmittals requested  10/15/1999 FAIL
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
Routing - PLAN CHECK10/7/1999 10/14/1999 FAIL
Routing - PLUMBING10/12/199910/12/199910/13/1999 PASS
Plan resubmittals received  10/12/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM HABITEC ARCHITECTS, FORWARDED SAME TO MIKE OTTO. 10/12/99 DAR
Routing - PLANNING10/7/1999 10/8/1999 PASS
approved per DRH99-0153.
Routing - PUBLIC WORKS10/1/199910/1/199910/7/1999 PASS
Routing - PLUMBING10/7/1999 10/7/1999 FAIL
Pending Assignment by MYS9/30/1999 10/1/1999 DONE
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  10/1/1999 DONE
REQUIRES 1. THREE COPIES OF STRUCT. CALCS. 2 CERT. OF VALUE FOR FOUNDATION PERMIT. 3. FOURTH SET OF PLANS TO GO ON SITE FOR FOUNDATION INSPECTIONS. 5. REVISED CERT. OF VALUE FOR THE BUILDING MINUS THE FOUNDATION. CONTACTED WESS OF STEED CONSTRUCTION REGARDING THESE NEEDS. I GAVE GORDON A RECORD DECLARATION FORM TO FAX BACK TO US. KMM
10/1/99 PM, RECEIVED ABOVE MENTIONED ITEMS MINUS THE RECORD DECLARATION FORM. GRADING PERMIT BLD99-01966
Received Certificate of Value  10/1/1999 PASS
Plan routing begun/NEW & ADDTN  10/1/1999  
Application received  9/30/1999  
Case Summary (BLD)     
Inspector's copy Bld permit