Permit Information
Permit NumberBLD99-02973
StatusFinaled
Name ALBERTSONS
Site Address 6658 S FEDERAL WAY
Project NameALBERTSONS #184
Customer Number 
ePlanReviewNo
Description
(ALBERTSONS EXPRESS #184 - FUEL ISLAND CANOPY) TO CONSTRUCT A NEW 1872 SQ. FT. ,TYPE II-N GAS FUEL ISLAND CANOPY FOR THE ALBERTSONS EXPRESS STORE NUMBER 184. PERMIT SUBMITTED UNDER THE SAME SET OF PLANS AS THE CONVENIENCE STORE WHICH IS UNDER BLD99-02974 DRH98-0181 PC#786-99
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes12/16/199912/16/19997/24/2000 DONE
FIRE-Final Inspection6/14/20006/15/20006/15/2000APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/14/2000 at 12:35:50. Contact: ###-####.
BLD-Final6/14/20006/15/20006/15/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/14/2000 at 16:10:13. Contact: ###-####.
Letter of compliance  6/15/2000 DONE
Letter of Compliance #18515 issued 6-15-00.
Code Occupancy Approval  6/15/2000 PASS
ALL CONDITIONS OF DRH98-00181 HAVE BEEN MET SO FINAL SIGNED OFF.
BLD-Final6/8/20006/9/20006/9/2000PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/08/2000 at 16:33:26. Contact: ###-####.
BLD-Final6/8/20006/9/20006/9/2000PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/08/2000 at 16:33:26. Contact: ###-####.
BLD-Footing3/28/20003/29/20003/29/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/28/2000 at 14:44:57. Contact: ###-####.
BLD-Footing3/28/20003/29/20003/29/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/28/2000 at 14:44:57. Contact: ###-####.
Inspection Record Card- Bld  3/10/2000 DONE
Inspection Record Card- Bld  3/10/2000 DONE
Print Occupancy Form  3/10/2000 DONE
Inspection Record Card- Bld  3/10/2000 DONE
Print Occupancy Form  3/10/2000 DONE
Issue PAID IN FULL permit  3/10/2000 DONE
Routing Off Site - STRUCTURAL1/26/2000 2/14/2000 PEND
RESUBMITTALS SENT TO ENGINEERING CONSULTANT VIA PDQ., RESUBMITTALS FROM STAPLEY ENGINEERING. 1/26/00 DAR
Plan assigned to (MLO)10/4/199910/4/19992/11/2000 DONE
DetailsMike Otto
Routing - PLAN CHECK2/4/2000 2/11/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/11/2000 DONE
Routing Off Site - STRUCTURAL2/9/2000 2/10/2000 PASS
Plan resubmittals requested  2/9/2000 FAIL
STRUCTURAL CORRECTION ON RESUBMITTALS. ARCHITECT NOTIFIED.
Routing Off Site - STRUCTURAL2/3/2000 2/9/2000 FAIL
SENT RESUBS TO CONSULTANTING ENGINEER VIA PDQ. 2/3/00 DAR
Routing - PLANNING1/26/2000 2/4/2000 PASS
Approved per DRH99-00140.
Plan resubmittals received  2/3/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM PETERSEN STAGGS ARCHITECTS, FORWARDED SAME TO MIKE OTTO, REVISED FUEL CANOPY DRAWINGS,FUEL CANOPY CACULATIONS,WRITTEN LINE ITEM RESPONSES FOR REVISIONS.2/3/00 DAR
Plan resubmittals received  1/28/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM PETERSEN - STAGGS ARCHITECTS, TIMOTHY STAGGS, LETTER OF RESPONSE DTD 1-27-00, REVISED SHEETS 3.0A, 3.0B, 3.1A, 3.3C, ROYSTON CUT SHEET OF COUNTERS. 1/28/00 DAR
Routing Off Site - STRUCTURAL1/13/2000 1/24/2000 FAIL
SENT PLANS AND CALCS FOR CANOPY WHICH WERE NOT INCLUDED WITH SUBMITTAL FOR MAIN BUILDING ON ENGINEERS SET ONLY. MLO
Plan resubmittals requested  1/24/2000 FAIL
STRUCTURAL CORRECTIONS FOR CANOPY FAXED TO ARCHITECT. MLO
Plan resubmittals received  1/24/2000 DONE
RECEIVED 1/21/2000 AT 4:15 PM ONE LETTER IN RESPONSE TO PLAN REVIEW COMMENTS W/ ATTACHMENTS TO INCLUDE LIST OF DRAWINGS.
THREE SETS OF STRUCTURAL RESUBMITTAL DRAWINGS.
TWO SETS SUPPLEMENTAL STRUCTURAL CALCULATIONS.
TWO SETS BUILDING ( INCLUDING MECH., ELECT. CIVIL FUEL) RESUBMITTAL DRAWINGS.
TWO SETS CANOPY DRAWINGS SHOWING COLORS TO MATCH BLDG. ROUTED TO MIKE O. KMM
Additional plans submitted  1/13/2000 PEND
SENT OMITTED PLANS TO CONSULTING STRUCTURAL ENGINEER VIA PDQ 1/13/00 DAR
Routing Off Site - STRUCTURAL10/22/1999 11/9/1999 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Plan resubmittals requested  11/9/1999 FAIL
structural corrections faxed to architect. MLO
Routing - FIRE10/22/199910/26/199910/26/1999 PASS
Plan Review Completed(1st rev)  10/26/1999 PEND
PLANS SENT BACK TO PLAN REVIEW
Routing - PLAN CHECK10/11/1999 10/22/1999 PEND
REQUIRES STRUCTRUAL REVIEW BY OUTSIDE ENGINEERING. MLO
Routing - PLUMBING10/7/1999 10/11/1999 PASS
Routing - PUBLIC WORKS10/4/199910/4/199910/7/1999 PASS
Routing - PLANNING10/7/1999 10/7/1999 PEND
Revised plans indicating compliance with the Design Review conditions must be submitted to Planning Staff for review and approval (see letter in DRH99-0140 file).
Plans ACCEPTED BY PLAN TECH  10/4/1999 DONE
PLANS INCLUDE PERMITS FOR BLD99-02973 (FUEL ISLAND), AND BLD99-02974 (CONVENIENCE STORE #184) AT THIS TIME MR. STAGGS DID NOT WANT TO SUBMIT FOR A GRADING AND DRAINAGE PERMIT. KMM
Received Certificate of Value  10/4/1999  
Plan routing begun/NEW & ADDTN  10/4/1999  
Case Summary (BLD)  10/4/1999 DONE
Fee Review-notes10/1/199910/1/199910/1/1999 DONE
Application received  10/1/1999  
Pending Assignment by MYS10/1/1999 10/1/1999 DONE
DetailsMarlene Southard
Routing Off Site - C.D.H9/15/19999/15/19999/15/1999 PASS