BLD-Final | 6/29/2000 | 6/29/2000 | 6/29/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-#### bob reinspection L/c issued 7/3/00 8:41:25 AM
|
BLD-Final | 4/10/2000 | 4/10/2000 | 4/10/2000 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### call first\\doug
|
BLD-Final | 4/4/2000 | 4/7/2000 | 4/7/2000 | P | FAIL |
Tom Arcoraci
|
|
|
DOUG ###-#### FN Not ready 4/11/00 9:40:49 AM
|
Permit EXTENDED | | | 4/5/2000 | | DONE |
|
|
|
almost done with job
|
BLD-Framing/Rough-in | 1/21/2000 | 1/21/2000 | 1/21/2000 | P | PART |
Tom Arcoraci
|
|
|
###-#### Check F/P at final. 1/25/00 11:53:03 AM
|
BLD-Framing/Rough-in | 1/13/2000 | 1/14/2000 | 1/14/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/13/2000 at 13:23:41. Contact: ###-####. See C/N. 1/14/00 3:03:40 PM
|
BLD-Footing | 11/15/1999 | 11/15/1999 | 11/15/1999 | P | PART |
|
|
|
DOUG--###-#### FT INSP R-bar placed ok to pour.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/1999 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/7/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/7/1999 | | DONE |
|
|
|
|
Application received | | | 10/7/1999 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 10/7/1999 | | |
|
|
|
|
Plan assigned to (SAM) | 10/7/1999 | | 10/7/1999 | | PASS |
Steve Munroe
|
|
|
10/7/1999 13:35:23 SAM - activity updated through activity BLDA022 from case BLD99-03033.
|
Case Summary (BLD) | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|