Fee Review-notes | 6/16/2003 | 6/16/2003 | 6/16/2003 | | DONE |
|
|
|
|
Fee Review-notes | 10/13/1999 | 10/13/1999 | 7/24/2000 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/3/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8211 issued 5-3-00 to the El Pueblo Meat and Produce Market.
|
BLD-Final | 4/24/2000 | 4/25/2000 | 4/25/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/24/2000 at 13:35:44. Contact: ###-####. Ok for perm. 4/26/00 11:49:46 AM
|
Permanent Occupancy | | 4/25/2000 | 4/25/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | PASS |
Joe Tawney
|
|
|
###-#### Reinsp. ok for perm. occ. 4/26/00 12:05:46 PM
|
FIRE-Final Inspection | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 04/20/2000 at 13:21:41. Contact: ###-####. Reinsp. fail alarm system 4/21/00 1:53:58 PM
|
BLD-Final | 4/21/2000 | 4/21/2000 | 4/21/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### Need fire, no insp. 4/24/00 10:56:24 AM
|
BLD-Final | 4/19/2000 | 4/20/2000 | 4/20/2000 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### No fire insp. 4/20/00 1:34:22 PM
|
FIRE-Final Inspection | 4/18/2000 | 4/19/2000 | 4/19/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 04/18/2000 at 13:42:40. Contact: ###-####. Final fail C/N issued. 4/19/00 1:39:12 PM
|
FIRE-Final Inspection | 4/14/2000 | 4/17/2000 | 4/17/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### Final not ready for inspection. 4/18/00 10:43:08 AM
|
FIRE-Final Inspection | 4/12/2000 | 4/14/2000 | 4/14/2000 | A | FAIL |
Joe Tawney
|
|
|
Mike ###-####ready at 2 or 3 but will call to set up an appointment Final fail not ready for inspection/ 4/17/00 9:25:57 AM
|
Plan resubmittals received | | | 4/11/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM JOHN COOK FORWARDED SAME TO
CARL DEPENDAHL. 4/11/00 DAR
|
FIRE-Conference | 4/6/2000 | 4/7/2000 | 4/7/2000 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 04/06/2000 at 13:38:04. Contact: ###-####. Conf. with contractor on fire code issued 4/7/00 2:51:00 PM
|
BLD-Framing/Rough-in | 2/10/2000 | 2/10/2000 | 2/10/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### ok to cover walls add gyp @ int of shafts ok to continue.
|
BLD-Conference | 2/3/2000 | 2/3/2000 | 2/3/2000 | P | PASS |
Carl Dependahl
|
|
|
Shawn; ###-####. RE-shaft & insp. req's. 2/4/00 11:51:03 AM
|
BLD-Footing | 1/12/2000 | 1/12/2000 | 1/12/2000 | P | PASS |
Carl Dependahl
|
|
|
###-#### SHAWN. Int. ftgs for truss/hood support col's.
|
Issue PAID IN FULL permit | | | 12/17/1999 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 10/22/1999 | 10/22/1999 | 12/16/1999 | | PASS |
Dan Stuart
|
|
|
12/16/1999 06:45:08 DRS - activity updated through activity BLDA022 from case BLD99-03096.
|
Print Occupancy Form | | | 12/16/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/16/1999 | | DONE |
|
|
|
|
Telephone call | | | 12/16/1999 | | DONE |
|
|
|
called permit ready and fees due. Called tenant
|
Plan resubmittals received | | | 12/15/1999 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM JOHN COOK, ARCHITECT SHEETS A1.0 THROUGH A6.0 FORWARDED SAME TO DAN STUART. 12/15/99 DAR
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/1999 | | PASS |
|
|
|
Routing for issuance of permit.
|
Routing - PLAN CHECK | 11/26/1999 | | 12/15/1999 | | PASS |
|
|
|
12/15/99 - Received re-submittals & engineering requested. Inserted plans & revised scope of work. Approved as noted & attached plan review comments, architects response & engineering.
|
Meeting | | | 12/7/1999 | | |
|
|
|
Met with John Cook to discuss the plan review comments. John stated that owner did not have time to wait for structural engineer review of roof structure capability to carry new loads being provide by new mechanical equipment. I told John that the matter has to be addressed from a structural standpoint for new roof loads or transfer loads to walls and to footings but that the changes & modifications have to be addressed. John to respond to plan review and submit plans either deleting work from scope of permit & or submitting design data for the new work.
|
Routing - FIRE | 11/24/1999 | 11/26/1999 | 11/26/1999 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 11/26/1999 | | PEND |
|
|
|
|
Routing - PLANNING | 11/24/1999 | | 11/24/1999 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/28/1999 | 11/22/1999 | 11/23/1999 | | FAIL |
|
|
|
Plan review started on 11/22/99 and correction list faxed and mailed to architect on 11/23/99. Resubmittals are required. Plans being forwarded to Planning & Fire Code analyst for review while waiting for response / resubmittals.
|
Plan resubmittals requested | | | 11/23/1999 | | FAIL |
|
|
|
Faxed & mailed copy of corrections required to John Cook Architect. Plans routed to Planning & F.D. for their review.
|
Routing - PLUMBING | 10/25/1999 | | 10/29/1999 | | PASS |
|
|
|
vegi sink to be indirectly wasted, vent all traps and fixtures, no vent shall be less than 1/2 the size of the drain it serves, wet venting is limited to 1 and 2 fixture unit fixtures, 1 1/2 toilet vent and vtr are undersized, provide 1" water supply to urinal branch, premis protection and thermol expantion protection required, provide vent for interceptor per detail on A-6, mop sink to be relocated per A-2,
|
Routing - PUBLIC WORKS | 10/22/1999 | | 10/25/1999 | | PASS |
|
|
|
|
Pending Assignment by MYS | 10/13/1999 | | 10/22/1999 | | DONE |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 10/22/1999 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
|
Routing Off Site - C.D.H | 10/15/1999 | 10/15/1999 | 10/20/1999 | | PASS |
|
|
|
CONTACTED JOHN COOK AT ###-#### TO TAKE PLANS OUT TO CENTRAL DISTRICT HEALTH. KMM
10/20/99 JOHN COOK BROUGHT PLANS BACK APPROVED FROM CDH. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 10/20/1999 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/15/1999 | | FAIL |
|
|
|
PLANS WERE SUBMITTED BEFORE THEY WERE SEEN BY CDH. CONTACTED JOHN COOK. HE WILL BE IN TO TAKE TO CDH. KMM
|
Application received | | | 10/13/1999 | | |
|
|
|
|