Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD99-03116
StatusFinaled
Name JACK IN THE BOX
Site Address 6300 N EAGLE RD
Project NameJACK-IN-THE BOX
Customer Number 
ePlanReviewNo
Description
STINKER STATION/JACK-IN-THE BOX * T.I. FOR THE 2139 SQ. FT. JACK-IN-THE BOX RESTAURANT WHICH IS LOCATED IN THE 5443 S.F. SINGLE STORY CONVENIENCE STORE BUILDING. DRH99-0121 CUP99-0068 PC#816-99. CONVENIENCE STORE UNDER BLD99-03062, FUEL ISLAND CANOPY UNDER BLD99-03118, GRADING AND DRAINAGE BLD99-03097.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes1/31/20011/31/20011/18/2002 DONE
1-30-02 left mesg on Scott's voice mail moved money from bld99-03062
Permanent Occupancy 1/2/20021/2/2002 DONE
Details
Permanent occupancy  1/2/2002 DONE
Perm. Occ. Cert. #8976 issued 1-2-02 to the Stinker Station/Jack in the Box. This is for the restaurant portion only.
BLD-Final12/11/200112/12/200112/12/2001APASS
DetailsJim Sly
###-#### STRUCTURAL ONLY OK for Perm Occ. 12/12/2001 11:30:39 AM
BLD-Final11/14/200111/15/200111/15/2001APART
DetailsJim Sly
###-#### TOM OK for Temp Occ. C/N Obtain Perm Occ. status within 90 days. 11/15/2001 10:09:58 AM
Temporary occupancy  11/15/2001 PART
Temp. Occ. Cert. #4645 issued 11-15-01 to the Jack in the Box Restaurant.
FIRE-Final Inspection11/13/200111/13/200111/13/2001PPASS
DetailsTroy Cobbley
Fire/life safety OK 11/13/2001 2:33:05 PM
BLD-Final11/6/200111/7/200111/7/2001PCANC
DetailsJim Sly
Chuck, ###-#### : )
BLD-Framing/Rough-in10/25/200110/26/200110/26/2001APASS
DetailsJim Sly
###-#### TOM FOR A CEILING Ceiling (Jack) ....OK 10/26/2001 9:34:56 AM
BLD-Framing/Rough-in9/24/20019/24/20019/24/2001PPART
DetailsJim Sly
###-#### tom grease hood 1hr shafts appear OK. 9/24/2001 2:19:49 PM
Override - Parcel Holds  9/24/2001  
BLD-Framing/Rough-in9/17/20019/17/20019/17/2001PPART
DetailsJim Sly
fr- tom 602/7431 -hood insp 1st Insp 1hr shaft. 9/17/2001 4:42:25 PM
BLD-Conference9/13/20019/13/20019/13/2001PPART
DetailsJim Sly
###-#### Tom 1st check 1 hr shafts. 9/14/2001 8:05:12 AM
BLD-Framing/Rough-in9/10/20019/11/20019/11/2001PFAIL
DetailsJim Sly
###-#### C/N Truss bearing. 9/11/2001 3:55:44 PM
BLD-Aging Inspection8/29/20018/29/20018/29/2001 PART
DetailsJim Sly
WIP 8/29/2001 1:17:51 PM
BLD-Aging Inspection6/29/20016/29/20016/29/2001 PART
DetailsJim Sly
Working on project. 6/29/2001 7:48:22 AM
Override - Parcel Holds  3/30/2001  
Issue PAID IN FULL permit  3/30/2001 DONE
Plan assigned to (MLO)10/14/199910/14/19991/30/2001 PASS
DetailsMike Otto
1/30/2001 14:49:42 MLO - activity updated through activity BLDA022 from case BLD99-03116.
PLANS/APPL TAKEN TO FRONT DESK  1/30/2001 DONE
Inspection Record Card- Bld  1/30/2001 DONE
Print Occupancy Form  1/30/2001 DONE
Routing - PUBLIC WORKS10/11/2000 1/26/2001 PASS
Plan resubmittals received  1/25/2001 DONE
Received two copies of revised sheet ES1.0 from Rick Toews. Routed to Mike O. KMM
CHANGE STATUS TO (PND)  10/17/2000 DONE
Permit EXPIRED  10/11/2000 DONE
permits expired per Mike O.
Plan Reviewer's activity  10/6/2000 DONE
RECEIVED ONE COPY OF LETTER REQUESTING A TIME EXTENSION FOR THIS PROJECT'S BUILDING PERMIT. ROUTED TO MIKE O AND TIM H. KMM
Routing - PUBLIC WORKS6/9/2000 6/9/2000 FAIL
REQUIRES PROOF OF LEGAL LAND DIVISION. 6/9/00 DAR
Routing - PUBLIC WORKS6/2/2000 6/2/2000 FAIL
REQUIRES PROOF OF LEGAL LAND DIVISION PER BRIAN MURPHY. 6/2/00 DAR
Routing - PUBLIC WORKS3/10/2000 3/13/2000 FAIL
NEEDS SUBDIVISION APPROVAL. KMM
Routing - PLAN CHECK3/8/2000 3/10/2000 PASS
Plan resubmittals received  3/7/2000 DONE
received stamped and signed revised sheet a-1 of 1for kysor panel systems. routed to mike o. Dave R. routed to mike o. kmm
Plan resubmittals received  3/3/2000 FAIL
RECEIVED PLAN SHEET A1 OF 1 FOR COOLER FACTORY FRAME PLAN. HOWEVER THEY WERE NOT STAMPED OR SIGNED. CONTACTED RICK TOEWS OF THIS NEED. KMM
Routing Off Site - STRUCTURAL12/3/1999 12/7/1999 PASS
SENT STRUCTURAL RESUBMITTALS TO THE CONSULTING ENGINEER VIA PDQ.. 12/3/99 DAR
Plan resubmittals received  12/6/1999 DONE
RECEIVED PLAN RESUBMITTALS FROM BRS ARCHITECTS, RICK TOEWS, SHEETS S4 & A15. FORWARDED SAME TO MIKE OTTO. 12/6/99 DAR
Routing - PLAN CHECK12/6/1999 12/6/1999 FAIL
item number 23 on correction list of 11-23-99 not responded to. MLO
Plan resubmittals requested  12/6/1999 FAIL
architect contacted about item # 23 on correction list of 11-23-99. MLO
Plan resubmittals received  12/1/1999 DONE
RECEIVED STRUCTURAL COMMENTS FROM STAPLEY ENGINEERING AND PLAN RESUBMITTALS OF SHEETS S0.1, S3,S4,AND S12.FORWARDED SAME TO MIKE OTTO 12/1/99 DAR
Routing - PLAN CHECK11/22/1999 11/23/1999 FAIL
CORRECTIONS ON RESUBS.
Plan resubmittals requested  11/23/1999 FAIL
CORRECTIONS FOR RESUBS MAILED AND FAXED TO ARCHITECT. MLO
Plan resubmittals received  11/22/1999 DONE
RECEIVED TWO COPIES OF REVISED SHEETS T1, A1, A9, A15, ONE PLAN CHANGE BULLETIN. ROUTED TO MIKE O. KMM
Routing - FIRE11/17/199911/18/199911/18/1999 PASS
Routing Off Site - STRUCTURAL11/3/199911/3/199911/18/1999 FAIL
ROUTED VIA PDQ ONE SET OF PLANS TO CONSULTING STRUCTURAL ENGINEER. 11/3/99 DAR
Plan Review Completed(1st rev)  11/18/1999 PEND
plans sent back to plan check
Plan resubmittals requested  11/18/1999 FAIL
structural corrections faxed and mailed to architect
Routing - PLUMBING11/5/1999 11/16/1999 PASS
see bld99-03062
Routing - PLAN CHECK11/2/1999 11/4/1999 FAIL
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
Plan resubmittals received  11/2/1999 PEND
Received full plan resubmittals from BRS Architects, forwarded same to Mike Otto. 11/2/99 DAR
Plan resubmittals received  11/1/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM BRS ARCHITECTS, FORWARDED SAME TO MIKE OTTO. 1/11/99 DAR
Routing - PLANNING10/21/1999 11/1/1999 PASS
Conditional Use comments (SAR): must provide 20' landscape buffer along Chinder frontage

Design Review comments (MGS): approved per DRH99-0121 and per revised plans in file.
Routing - PLAN CHECK10/22/1999 10/22/1999 HOLD
RECEIVED LETTER FORM ARCHITECT TO HOLD REVIEW OF PROJECT - NEW PLANS ARE BEING PREPARED FOR RESUBMITTAL. 10-22-99 MLO
Routing - PUBLIC WORKS10/19/199910/19/199910/21/1999 FAIL
REQUIRES PROOF OF LEGAL LAND DIVISION, 10/21/99 DAR
Plan resubmittals received  10/20/1999 DONE
RECEIVED STAMPED AND SIGNED M-1 THRU M-5 H-1 THRU H-3 AND SP6 & SP7. PUT WITH PLANS. KMM
Plans ACCEPTED BY PLAN TECH  10/20/1999 PASS
RECEIVED TWO COPIES OF STAMPED AND SIGNED SHEETS M-1 THRU M-5 H-1 THRU H-3 WITH SP6 & SP7. PUT WITH PLANS. KMM
Plan resubmittals received  10/19/1999  
RECEIVED PLUMB. SHEETS
Plan routing begun/NEW & ADDTN  10/19/1999  
Routing Off Site - C.D.H10/12/199910/12/199910/18/1999 DONE
PLANS SIGNED OFF BY CDH. PLANS HAD TO GO TO CDH AFTER BLD# ASIGNED. SEE ACTION BLD99-03062 KMM
Application received  10/14/1999 PASS
Plans ACCEPTED BY PLAN TECH  10/14/1999 FAIL
SEE ACTIONS BLD99-03062
10/18/99 PLANS RECEIVED BACK FROM CDH. STILL REQUIRE
1. MECH. AND HOOD PLANS TO BE STAMPED AND SIGNED. KMM
Received Certificate of Value  10/14/1999  
Case Summary (BLD)  10/14/1999 DONE