Case Summary (BLD) | | | 8/30/2004 | | |
|
|
|
|
Case Summary (BLD) | | | 3/30/2004 | | |
|
|
|
|
Case Summary (BLD) | | | 7/16/2002 | | |
|
|
|
|
Fee Review-notes | 10/18/1999 | 10/18/1999 | 3/21/2001 | | DONE |
|
|
|
|
Letter of compliance | | | 10/2/2000 | | DONE |
|
|
|
Letter of Compliance #18569 issued 10-2-00.
|
BLD-Final | 9/26/2000 | 9/27/2000 | 9/27/2000 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/26/2000 at 14:45:56. Contact: ###-####.card to contractor, l/c only for shell 9/27/2000 1:08:19 PM
|
FIRE-Final Inspection | 9/25/2000 | 9/26/2000 | 9/26/2000 | P | PASS |
Joe Tawney
|
|
|
###-####. Reinsp OK for Certificate of completion 9/27/2000 8:08:47 AM
|
FIRE-Final Inspection | 9/13/2000 | 9/13/2000 | 9/13/2000 | P | FAIL |
Joe Tawney
|
|
|
###-####. Reinsp Fail C/N not completed 9/14/2000 7:49:59 AM
|
FIRE-Final Inspection | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail C/N issued 8/29/2000 1:47:03 PM
|
FIRE-Final Inspection | 8/25/2000 | 8/25/2000 | 8/25/2000 | P | CANC |
Joe Tawney
|
|
|
jerry--###-#### fn fire---fire spr & fire life safety Cancel Resched for 8/28 or later 8/25/2000 4:38:06 PM
|
BLD-Final | 8/24/2000 | 8/25/2000 | 8/25/2000 | P | FAIL |
Carl Dependahl
|
|
|
jerry-- ###-#### fn...nr 8/25/2000 4:38:23 PM
|
Code Occupancy Approval | | | 8/25/2000 | | PASS |
|
|
|
Meets compliance with DRH99-00200 - PASS
|
BLD-Conference | 8/24/2000 | 8/24/2000 | 8/24/2000 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/24/2000 w/ supt...need fire & all other agcy oks on card for final
|
BLD-Conference | 8/17/2000 | 8/17/2000 | 8/17/2000 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/17/2000 w/ cont re finals
|
BLD-Conference | 8/4/2000 | 8/7/2000 | 8/7/2000 | A | PASS |
Carl Dependahl
|
|
|
Jerry ###-####
|
BLD-Conference | 7/20/2000 | 7/20/2000 | 7/20/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-####- JERRY CONF ; need detail for reglet at corr. 7/21/2000 8:38:37 AM
|
BLD-Framing/Rough-in | 7/17/2000 | 7/18/2000 | 7/18/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### Ext. walls ok to cover, "penthouse" ok. 7/18/00 2:47:11 PM
|
BLD-Framing/Rough-in | 7/13/2000 | 7/13/2000 | 7/13/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### Pending all spec. insp. reports 7/14/00 9:27:54 AM
|
BLD-Framing/Rough-in | 7/10/2000 | 7/11/2000 | 7/11/2000 | A | FAIL |
Carl Dependahl
|
|
|
###-####--jerry fr C/N w/bld00-01084 7/12/00 10:29:54 AM
|
Print Occupancy Form | | | 7/10/2000 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 7/6/2000 | 7/6/2000 | 7/6/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### Stair enclosure lid(s) ok to cover (per plan). 7/7/00 1:36:45 PM
|
BLD-Framing/Rough-in | 6/27/2000 | 6/27/2000 | 6/27/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### "core" area pend spec insp report 6/28/00 2:12:51 PM
|
BLD-Framing/Rough-in | 6/22/2000 | 6/22/2000 | 6/22/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### Nobody home, left card 6/23/00 11:18:37 AM
|
BLD-Framing/Rough-in | 5/26/2000 | 5/26/2000 | 5/26/2000 | A | PART |
Carl Dependahl
|
|
|
Elev. shaft: need eng's ok for 1/4 blocks, etc. ok to continue.
|
BLD-Framing/Rough-in | 5/25/2000 | 5/25/2000 | 5/25/2000 | P | NR |
Carl Dependahl
|
|
|
Jerry Wylie ###-####
|
BLD-Framing/Rough-in | 5/4/2000 | 5/4/2000 | 5/4/2000 | A | PART |
Carl Dependahl
|
|
|
Professional complex- 1st floor curtain walls, EFIS & paper.
|
BLD-Framing/Rough-in | 5/1/2000 | 5/1/2000 | 5/1/2000 | P | PART |
Carl Dependahl
|
|
|
###-####
|
BLD-Conference | 4/17/2000 | 4/17/2000 | 4/17/2000 | A | PASS |
Carl Dependahl
|
|
|
Reviewed use of PVC conduit & ent. ok
|
BLD-Conference | 4/7/2000 | 4/7/2000 | 4/7/2000 | P | PASS |
Carl Dependahl
|
|
|
Ok to use ENT or PVC
|
BLD-Concrete | 3/21/2000 | 3/21/2000 | 3/21/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 07:41:59. Contact: ###-####. Pending spec. insp./eng's report. 3/22/00 3:19:43 PM
|
BLD-Conference | 3/20/2000 | 3/20/2000 | 3/20/2000 | A | PASS |
Carl Dependahl
|
|
|
W/bldr. re: special insp. reports.
|
BLD-Foundation | 2/8/2000 | 2/9/2000 | 2/9/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/08/2000 at 11:54:46. Contact: ###-####. Sp insp
|
BLD-Concrete | 1/27/2000 | 1/28/2000 | 1/28/2000 | A | PART |
Tom Arcoraci
|
|
|
Masonary insp. Bob- ###-####. spec insp on site stair tower 1/28/00 11:25:42 AM
|
BLD-Concrete | 1/24/2000 | 1/24/2000 | 1/24/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### beginning masonary special insp1/31/00 9:01:34 AM
|
FIRE-Sprinkler Rough-in | 1/4/2000 | 1/4/2000 | 1/4/2000 | P | PART |
Joe Tawney
|
|
|
TERRY--- ###-#### R/I. Ok on supply line cover.
|
(F) Reprint permit | | | 12/27/1999 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/23/1999 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/26/1999 | 10/26/1999 | 11/23/1999 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 11/23/1999 | 11/23/1999 | 11/23/1999 | | PASS |
|
|
|
|
Routing - PLUMBING | 11/19/1999 | 11/19/1999 | 11/23/1999 | | PASS |
|
|
|
per plans and 97 upc
|
Plan assigned to (JCM) | 10/19/1999 | 10/19/1999 | 11/23/1999 | | PASS |
John Menard
|
|
|
11/23/1999 13:09:48 JCM - activity updated through activity BLDA022 from case BLD99-03170.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/23/1999 | | PASS |
|
|
|
|
Telephone call | | | 11/23/1999 | | DONE |
|
|
|
called Cricket at ###-#### permit ready for pick up
|
Print Occupancy Form | | | 11/23/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/23/1999 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/10/1999 | 11/10/1999 | 11/19/1999 | | PEND |
|
|
|
|
Additional plans submitted | | | 11/19/1999 | | PEND |
|
|
|
RECEIVED PLUMBING PLANS BY MUSGROVE ENGINEERING FROM BRS ARCHITECTS, FORWARDED SAME TO JOHN MENARD. 11/19/99 DAR
|
Routing Off Site - STRUCTURAL | 11/9/1999 | 11/9/1999 | 11/10/1999 | | |
|
|
|
CONTACTED PDQ TO TAKE REVISED STRUCT. DATED 11/9/99 TO OUTSIDE ENG. KMM
|
Routing - PUBLIC WORKS | 11/9/1999 | 11/9/1999 | 11/10/1999 | | PASS |
|
|
|
|
Plan resubmittals received | | | 11/9/1999 | | PEND |
|
|
|
RECEIVED THREE COPIES OF STRUCTURAL PLANS, CALCULATIONS AND RESPONSE LETTER FROM ENGINEER.
|
Plan resubmittals received | | | 11/3/1999 | | PEND |
|
|
|
RECEIVED TWO COPIES OF THE RECORD PLAT, SHOWING THE LOT LINE ADJUSTMENTS.
|
Routing - FIRE | 11/2/1999 | | 11/2/1999 | | PASS |
|
|
|
Provided fire sprinkler water supply information. (Certificate to be attached or noted on the plans with static, residual, gpm flow, date from United Water).
|
Routing - PLAN CHECK | 11/2/1999 | | 11/2/1999 | | PEND |
|
|
|
|
Routing - FIRE | 10/29/1999 | 11/1/1999 | 11/1/1999 | | FAIL |
|
|
|
Need fire sprinkler water supply information.
|
Plan Review Completed(1st rev) | | | 11/1/1999 | | PEND |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/19/1999 | 10/19/1999 | 10/29/1999 | | |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
10/29/99 REVIEW BACK FROM OUTSIDE ENG. ROUTED RESPONSE TO JOHN M. KMM
|
Plan resubmittals requested | | | 10/29/1999 | | PEND |
|
|
|
MAILED CRICKET LANGWORTHY A LETTER ADVISING HER THAT A RECORDED SURVEY AND LEGAL DESCRIPTION FOR THIS BUILDING SITE WOULD BE REQUIRED.
|
Plan resubmittals requested | | | 10/29/1999 | | PEND |
|
|
|
FAXED CRICKET LANGWORTHY A COPY OF THE COMMENT LIST FROM THE CONSULTING STRUCTURAL ENGINEER REQUESTING REVISIONS.
|
Plan Reviewer's activity | | | 10/28/1999 | | PASS |
|
|
|
Plans reviewed and approved as submitted. I also sent Cricket Langworthy a letter advising her that recorded survey and legal description were required.
|
Routing - PUBLIC WORKS | 10/26/1999 | 10/26/1999 | 10/26/1999 | | FAIL |
|
|
|
CIVIL PLANS NEED TO BE REVISED TO SHOW SEWERS PER JOHN JOHNSON. 10/29/99 DAR
|
Routing - PLUMBING | 10/25/1999 | | 10/26/1999 | | FAIL |
|
|
|
please provide a waste and vent riser diagram, and a civil plan showing the sanitary sewer and the roof drain per notes 1, 10, and 19 page P1-1, thermol expantion protection for the domestic water system will be required
|
Routing - PUBLIC WORKS | 10/19/1999 | 10/19/1999 | 10/25/1999 | | FAIL |
|
|
|
REQUIRES REVISED PLAN SHOWING SEWER SYSTEM. PER JOHN JOHNSON.10/25/99 DAR
|
Routing - PLANNING | 10/25/1999 | | 10/25/1999 | | PASS |
|
|
|
approved per DRH99-00200 and as noted on sheet SD-2 (relocate accessible parking spaces per D.R. conditions).
|
Fee Review-notes | 10/21/1999 | 10/21/1999 | 10/21/1999 | | DONE |
|
|
|
LINDA, THIS VALUE OF $1,800,000.00 INCLUDES THE FOUNDATION PROJECT VALUE, AS WELL AS THE GRADING PROJECT VALUE. CRICKET LANGWORTHY WILL BE FAXING A REVISED CERT. OF VALUE FOR BLD99-03170 MINUS THE FOUNDATION AND GRADING. THANK YOU KMM
|
Plan assigned to (MYS) | 10/18/1999 | 10/18/1999 | 10/19/1999 | | PASS |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/19/1999 | | DONE |
|
|
|
|
Received Certificate of Value | | | 10/19/1999 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 10/19/1999 | | DONE |
|
|
|
|
Application received | | | 10/18/1999 | | |
|
|
|
|