To remodel an existing 5,316 building and add 353 sq.ft. of area for a total square footage of 5,669 sq. ft. for new office tenant and owner per approved plans on file. This building was a former Federal Government US Postal Service building. The building is not in compliance with local Boise City building codes. Some upgrade work is being done to gain code compliance. Demolishing a portion of the south wall and all interior walls. Work to include new accessible restrooms, in lieu of parapet wall at east wall-providing one-hour rated roof-ceiling and supporting members, upgrading the building to Type V-1hr construction because of fire flow, replacing existing windows with new 45 minute rated assemblies on the east wall per location on property, new footings-foundation and slab for new exterior south wall, new interior square pad footing, some new columns, exterior doors and windows, new roof covering, exterior wall covering in some locations, new exterior canopy, CMU infill of some openings, new interior walls with doors and windows, suspended ceiling, interior finish, new exterior landings, stairs, and sidewalk work at exit doors, new mechanical, new plumbing, and new electrical. (P.C.#853-99) DRH99-00224 JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/12/20036/12/20036/12/2003 DONE
Fee Review-notes10/21/199910/21/19997/24/2000 DONE
Details
Permanent occupancy  6/28/2000 DONE
Perm. Occ. Cert. #8271 issued 6-28-00 to Harris & Co.
Permanent Occupancy 6/27/20006/27/2000 DONE
Details
BLD-Final6/26/20006/27/20006/27/2000APASS
DetailsJim Storey
Cathy has the card!
Code Occupancy Approval  6/26/2000 PASS
ALL PARKING HAS NOW BEEN MARKED, FINAL SIGNED OFF.
BLD-Final2/7/20002/7/20002/7/2000PPART
DetailsJim Storey
odie ###-#### card and plans on East wall of big room Temp occ ok safety glazing and office hardware not in place.
BLD-Framing/Rough-in2/3/20002/4/20002/4/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/03/2000 at 15:34:34. Contact: ###-####. Ceiling grid & fire stop ok. 2/4/00 11:57:28 AM
FIRE-Final Inspection2/3/20002/4/20002/4/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/03/2000 at 15:35:36. Contact: ###-####.
BLD-Framing/Rough-in1/6/20001/7/20001/7/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 01/06/2000 at 12:28:18. Contact: ###-####. Ok to cover int. walls.
Code Occupancy Approval  1/4/2000 FAIL
UNCOMPLETED LANDSCAPE AND PARKING MARKING INCLUDING HANDICAPPED, BONDED FOR $5755 DOLLARS FOR DRH99-00224, TEMPORARY OCCUPANCY SIGNED OFF.
Plan resubmittals received  12/30/1999 DONE
RECEIVED MEMORANDUM TO THE PROJECT. ROUTED TO JIM STOREY. KMM
BLD-Footing12/2/199912/3/199912/3/1999APART
DetailsJim Storey
Brian ###-#### Ft. ok "South".
Routing - PLAN CHECK11/26/1999 12/1/1999 PASS
Plans approved and taken to front desk.
Plan assigned to (JCB)10/22/1999 12/1/1999 PASS
DetailsJason Blais
PLANS/APPL TAKEN TO FRONT DESK  12/1/1999  
Print Occupancy Form  12/1/1999 DONE
Inspection Record Card- Bld  12/1/1999 DONE
Telephone call  12/1/1999 DONE
permit ready, fees due and need ACHD cert.
Issue PAID IN FULL permit  12/1/1999 DONE
Plan resubmittals received  11/30/1999 DONE
RECEIVED TWO COPIES OF ADDENDUM NO 1 AND ONE LETTER OF RESPONSE TO PLAN REVIEW, ALL FROM HUMMEL ARCH. ROUTED TO JASON. KMM
Routing - FIRE11/23/199911/26/199911/26/1999 PASS
Plan Review Completed(1st rev)  11/26/1999 PEND
Routing - PLAN CHECK11/1/199911/1/199911/23/1999 FAIL
Plan review report sent and faxed to architect. Resubmittal drawings and response required. Plans routed to fire dept.
Plan resubmittals requested  11/23/1999 PEND
Routing - PLANNING10/25/1999 11/1/1999 PASS
Approved per DRH99-00224.
Routing - PUBLIC WORKS10/25/1999 10/25/1999 PASS
Plan routing begun/TENANTS  10/22/1999 DONE
Route to PUBLIC WORKS, PLANNING, PLAN CHECK and FIRE. Structural to be reviewed by Plan Reviewer.
Plans ACCEPTED BY PLAN TECH  10/22/1999  
Pending Assignment by MYS10/22/1999 10/22/1999 DONE
DetailsMarlene Southard
Telephone call  10/21/1999 DONE
Application received  10/21/1999