Code Occupancy Approval | | | 7/29/2005 | | FAIL |
|
|
|
Failed. Issued a Correction Notice for:
Replace dead tree in front of building
Relocate dumpster to an enclosed area
Place curbing around landscaped areas by entrance/exit
Fill in deep spots/holes on the west and east side of the main entry.
|
BLD-Aging Inspection | 9/15/2004 | 9/15/2004 | 9/15/2004 | | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 9/15/2004 | 9/15/2004 | 9/15/2004 | A | PASS |
Tom Arcoraci
|
|
|
Expired by inspector at 9/15/2004 8:53:37 AM
|
BLD-Aging Inspection | 7/15/2004 | 7/15/2004 | 7/15/2004 | | CANC |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 4/5/2004 | 4/5/2004 | 4/5/2004 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Final | 2/2/2004 | 2/3/2004 | 2/3/2004 | A | NR |
Troy James
|
|
|
Dennis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
FIRE-Final Inspection | 2/2/2004 | 2/2/2004 | 2/2/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety, fire alarm and fire sprinklers finaled
|
Print Occupancy Form | | | 1/30/2004 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/21/2004 | 1/22/2004 | 1/22/2004 | A | FAIL |
Troy Cobbley
|
|
|
Need the security system/fire alarm drawings issued and inspected. All other life safety items are ok 1/22/2004 10:34:51 AM
|
BLD-Aging Inspection | 9/25/2003 | 9/25/2003 | 9/25/2003 | | PASS |
Tom Arcoraci
|
|
|
wip ok to continue 9/25/2003 8:32:05 AM
|
BLD-Framing/Rough-in | 3/5/2003 | 3/5/2003 | 3/5/2003 | P | PASS |
Tom Arcoraci
|
|
|
###-#### ken partial grid 3/5/2003 4:01:00 PM
|
BLD-Framing/Rough-in | 8/16/2002 | 8/19/2002 | 8/19/2002 | A | PART |
Tom Arcoraci
|
|
|
DENNIS ###-#### DRAFT STOP ON ROOF wip ok 8/19/2002 10:34:49 AM
|
Override - Parcel Holds | | | 8/16/2002 | | |
|
|
|
|
BLD-Framing/Rough-in | 8/2/2002 | 8/5/2002 | 8/5/2002 | P | PART |
Tom Arcoraci
|
|
|
dennis ###-#### roof ok 8/5/2002 4:20:54 PM
|
Override - Parcel Holds | | | 8/2/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 8/2/2002 | | |
|
|
|
|
BLD-Framing/Rough-in | 7/17/2002 | 7/18/2002 | 7/18/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### ok to cover ext dec colms 7/18/2002 10:56:39 AM
|
Override - Parcel Holds | | | 7/17/2002 | | |
|
|
|
|
BLD-Framing/Rough-in | 7/3/2002 | 7/3/2002 | 7/3/2002 | P | PASS |
Tom Arcoraci
|
|
|
dennis- ###-#### fr
|
Override - Parcel Holds | | | 7/3/2002 | | |
|
|
|
|
BLD-Framing/Rough-in | 7/1/2002 | 7/1/2002 | 7/1/2002 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### 2 trimmers required at windows see plan 7/1/2002 2:15:15 PM
|
Override - Parcel Holds | | | 7/1/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/1/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 7/1/2002 | | |
|
|
|
|
Plan assigned to (DRS) | 5/22/2002 | 5/22/2002 | 6/26/2002 | | PASS |
Dan Stuart
|
|
|
6/26/2002 09:13:24 DRS - activity updated through activity BLDA022 from case BLD99-03216.
|
Routing - PLAN CHECK | 6/18/2002 | | 6/26/2002 | | PASS |
|
|
|
Plan Modification, 5/2/02. Re-submitals of 6/24/02 were complete repalcement of original plans for modification of 5/2/02. Front and back sheets of original plan attached to 6/24/02 plans. MODIFICATION Approved per red-line notes on plans, attached engineering and architects response and reviewing agencies plan review reports & conditions of approval. To permit desk for re-issue.
|
Override - Parcel Holds | | | 6/26/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2002 | | PASS |
|
|
|
To permit desk for re-issue.
|
Override - Parcel Holds | | | 6/26/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/26/2002 | | DONE |
|
|
|
|
Telephone call | | | 6/26/2002 | | DONE |
|
|
|
permit ready and fees due
|
Routing - PLAN CHECK | 12/2/1999 | | 6/26/2002 | | PEND |
|
|
|
Plan Modification approved per conditions, plan review comments and attached documents.
|
Plan resubmittals received | | | 6/24/2002 | | DONE |
|
|
|
PLAN MODIFICATION: Received two sets of resubmittal sheets A1.0, A2.0, A3.3, A3.4, A3.6, A3.7, A3.8, A3.9, A5.2, A6.2, A7.3, A7.4, A8.2, A8.4, S1.1, S2.1, (2) Structural calculations for Parpet Drifting, (2) Hillcrest Eyebrow, (2) Structural Calculations for Mechanical Screen, (2) Calculations for beam at North Breezeway, (2) Calculations for MLB Header at Ex. Window, and cover letter. Routed to Dan Stuart.
|
Routing - PLANNING | 6/13/2002 | | 6/18/2002 | | PASS |
|
|
|
Approve per DRH02-90.
|
Plan Review Completed(1st rev) | | | 6/13/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 6/11/2002 | | 6/11/2002 | | PASS |
|
|
|
Plan Modification
|
Routing - PLAN CHECK | 5/22/2002 | | 6/11/2002 | | FAIL |
|
|
|
Plan Modification. Submitted modification to original plans failed. Information incomplete based on submitted changes. Corrections required list faxed and mailed to architect for response. Plans forwarded to fire code analyst.
|
Pending Assignment by MYS | 10/22/1999 | | 5/22/2002 | | DONE |
Marlene Southard
|
|
|
5/22/2002 10:27:34 DKL - activity updated through activity BLDA168 from case BLD99-03216.
|
Plans ACCEPTED BY PLAN TECH | | | 5/21/2002 | | HOLD |
|
|
|
Received plan for modification from Tempra Wilson. Tempra told me that she called Pat McKeegan and informed him that a Staff Level Design Review must be done before further action can take place. Talked to Dan Stuart and he told me to place plans in "Hold box" until the Staff Level Design Review is approved, then process plans for Plan Modification.
|
Plan Modification Accepted | | | 5/17/2002 | | DONE |
|
|
|
Received drawings, calculations, plan modification application from Pat Mckeegan Architects. Routed to Tempra Wilson for zoning approval prior to processing application, per Dan Stuart.
5/22/02
1). The new trussed roof system and associated details have been deleted from the project. At some time in the future the exiting roof will be replaced. the center raised portion of the previous design has been retained with an open top. The existing equipment is designed for and operating in the weather so protection is not an issue. 2). Proposed exterior window screens and existing wood lattice framing are being deleted from the project. Canopies over the windows have been added. Canopies over windows to be added. EIFS detail added in the panels between the windows and a stepped cornice detail. Exterior windows enlarged. 3). Access to the communications room has been changed based on input from mechanical & electrical engineers. Fire sprinkler riser and control assembly has been moved to a room located between the buildings under the existing stairs. 4). New installation of relites next to the suite doorways. 5). final phase of fire sprinkler installation redesign eliminated the need for fire sprinklers at the roof mechanical area, canopy soffit framing and crawl space. Routed to Dan Stuart.
|
CHANGE STATUS TO (PND) | | | 5/16/2002 | | DONE |
|
|
|
plan mod received 5/16/02 aml
|
Plan resubmittals received | | | 5/3/2002 | | DONE |
|
|
|
received two copies of revised sheets A1.0, A3.3, A3.4, A3.6, A3.7, A3.8, A3.9, A5.2, A6.2, A7.3, A7.4, A8.2, A8.4, S1.1, S2.1, and one copy of letter. Routed to Dan S. kmm
|
BLD-Foundation | 3/8/2002 | 3/11/2002 | 3/11/2002 | A | PART |
Tom Arcoraci
|
|
|
stem wall- ted-- ###-####-at front of bld
|
BLD-Footing | 3/4/2002 | 3/5/2002 | 3/5/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### GEORGE pending spec insp 3/4/2002 5:19:44 PM
|
BLD-Framing/Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by Inspector: 408 On 2/28/2002 4:48:30 PM C/N....Need letter stating change of Architect of record, Do not go beyond scope of "approved" work, Provide detail for headers Etc. 3/1/2002 9:48:32 AM
|
BLD-Framing/Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 | P | CANC |
Tom Arcoraci
|
|
|
ted ###-####
|
BLD-Footing | 2/25/2002 | 2/25/2002 | 2/25/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 07:25:16. Contact: ###-####. pnding spec insp 2/25/2002 10:00:14 AM
|
BLD-Footing | 2/18/2002 | 2/20/2002 | 2/20/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 15:05:13. Contact: . pending mti 2/20/2002 2:53:32 PM
|
BLD-Footing | 2/18/2002 | 2/19/2002 | 2/19/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 15:04:10. Contact: .Special inspection required by plans and footing for ramp shown to be 20 In wide has been constructed as 14 in , a c/n is posted owner and foundation contractor on site, Along with concrete truck, Note I received a call from foundation contractor this morning and he indicated to please make him my last stop as he would not be ready untill 12:00. Note Inspection done at this time also. 2/19/2002 1:00:48 PM
|
BLD-Footing | 2/8/2002 | 2/8/2002 | 2/8/2002 | P | PASS |
Tom Arcoraci
|
|
|
ted- ###-#### ft ok for footing under floor for col 2/8/2002 1:29:29 PM
|
BLD-Conference | 4/24/2001 | 4/24/2001 | 4/24/2001 | A | CANC |
Tom Arcoraci
|
|
|
Ted Sigmont ###-####
|
BLD-Conference | 4/24/2001 | 4/24/2001 | 4/24/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 4/24/2001 11:07:53 AM conf on bath 4/24/2001 2:45:50 PM
|
Issue PAID IN FULL permit | | | 9/1/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/12/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/12/2000 | | DONE |
|
|
|
|
Telephone call | | | 7/12/2000 | | DONE |
|
|
|
TALKED TO DENNIS TO VERIFY PLANS ARE READY
|
Routing - PLAN CHECK | 6/23/2000 | | 7/11/2000 | | PASS |
|
|
|
PLANS APPROVED AS NOTED AND PER ATTACHED PLAN REVIEW 7/11/00 - COMMENTS OF ALL REVIEWING AGENCIES. CHANGED AGREEMENT TIME FRAME FROM 6/23/00 TO 7/12/00 BECAUSE OF THE DELAY IN RECEIVING APPROVAL OF STRUCTURAL CHANGES SUBMITTED ON 6/23/00.
|
Routing Off Site - STRUCTURAL | 6/28/2000 | | 7/11/2000 | | PASS |
|
|
|
PLAN RESUBMITTALS RECEIVED 6-28-00 SENT TO OUTSIDE ENG. KMM
7/11/00 - RECEIVED E-MAIL FROM HOWIE AT CH2M HILL STATING STRUCTURAL RESUBMITTALS ARE APPROVED.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2000 | | PASS |
|
|
|
ROUTING TO PERMIT DESK FOR ISSUANCE.
|
Plan assigned to (DRS) | 11/12/1999 | | 7/11/2000 | | PASS |
Dan Stuart
|
|
|
7/11/2000 17:43:24 DRS - activity updated through activity BLDA022 from case BLD99-03216.
|
Plan resubmittals received | | | 6/28/2000 | | DONE |
|
|
|
Received structural resubmittals from AHJ and forwarded to Dan Stuart. Includes calculations and sheet S3.1.
|
Routing - FIRE | 6/19/2000 | 6/19/2000 | 6/23/2000 | | PASS |
Bill Alexander
|
|
|
|
Routing Off Site - STRUCTURAL | 6/20/2000 | | 6/23/2000 | | FAIL |
|
|
|
contacted pdq to take plans to outside eng. kmm
6/23/00 - RECEIVED NOTICE FROM STRUTURAL ENGINEER DOING PEER REVIEW THAT BECAUSE OF ROOF LAYOUT & STRUCTURAL MODIFICATIONS CREATED THERE BY, AN ADDITIONAL REVIEW TO A NEW SET OF QUESTIONS NEEDS TO BE SUBMITTED AND REVIEWED FOR APPROVAL. SENT COPY OF REVIEW COMMENTS TO ARCHITECT AND ENGINEER.
|
Routing - PLAN CHECK | 6/9/2000 | 12/9/1999 | 6/19/2000 | | |
|
|
|
Inserted new plans in place of original, updated permit & comment section based on actions moving forward over the past several months to provide a way to move forward with upgrades in an approved manner satisfactory to the fire & building department. Routing plans back to fire code analyst for their re-review.
|
Telephone call | | | 6/19/2000 | | DONE |
|
|
|
Call to Howie Henrickson, CH2M HILL, to see if he needed to review plans as all his review comment for Overland Business Center appear to be for 4620 Overland, BLD99-03215 and the resubmittals from Joe Numbers, McKee Assoc. are for 4696 Overland, BLD00-03216. 4620 will be a future project currently under redesign for re-submittal by architect. Howie ask they be sent over just to be sure they do not involve part of the project they need response to. AHJ, Keith Jones, did not submitt a specific response to outside review comments but did submit new structural calcs for both 4620 & 4696 Overland and McKee Assoc. only submitted the structural calcs for both and a new set of plans for 4696 Overland.
|
Plan resubmittals received | | | 6/9/2000 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM JOE NUMBERS, FORWARDED SAME TO DAN STUART. 6/9/00 DAR
|
Plan resubmittals requested | | | 12/9/1999 | | |
|
|
|
Faxed and mailed copy of outside structural review report to Joe Numbers requiring resubmittal response.
|
Routing Off Site - STRUCTURAL | 11/15/1999 | | 12/9/1999 | | FAIL |
|
|
|
ROUTED PLANS TO CONSULTING STRUCTURALS ENGINEER. 11/15/99 DAR 12/9/99 RECEIVED STRUCTURAL REVIEW LETTER FROM OUTSIDE ENG. DATED 12/8/99 ROUTED TO DAN S. KMM
12/9/99 - Outside structural review failed. Further submittals & additional reveiw required. Faxed and mailed copy of structural report to Joe Numbers for response.
|
Routing - FIRE | 12/1/1999 | 12/2/1999 | 12/2/1999 | | FAIL |
|
|
|
Need hydrant locations and fire flow information. Architect to verify site access.
|
Plan Review Completed(1st rev) | | | 12/1/1999 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 11/17/1999 | 11/17/1999 | 11/30/1999 | | FAIL |
|
|
|
RESUBMITTALS REQUIRED. PLANS DO NOT ADDRESS THE EXISTING PROPERTY LINE BETWEEN THE TWO EXISTING BUILDINGS AND PROPOSED METHOD OF HANDLING AREA BETWEEN. THE NEW ROOF CANNOT EXTEND OVER THE PROPERTY LINE; OPENINGS LESS THAN 5 FEET FROM PTY LINE NOT ALLOWED; STAIRS & LANDINGS CANNOT EXTEND INTO AREAS WHERE OPENINGS ARE NOT ALLOWED.
NOTES ON PLAN TO REPLACE INTERIOR CORRIDOR DOORS WITH 20 MINUTE ASSEMBLIES DO TO MODIFICATIONS TO EXISTING DOORS WHERE MAIL SLOTS WERE ADDED OR THE ASSEMBLIES DID NOT MEET CODE ORIGINALLY.
THE PLAN RESUBMITTALS WERE PRSENTED AS BEING V-1HOUR CONSTRUCTION, A CONDITION NOT FELT TO EXIST DURING THE MEETING OF 11/3/99 BUT EVIDENTLY THE CLASSIFICATION WAS NEEDED TO ALLOW FOR THE EXISTING AREA OF THE BUILDING, SO AN ANALYSIS & PROPOSAL WILL BE REQUIRED FROM THE OWNER ON HOW THE FACILITY WILL BE MADE TO MEET CODE REQUIRMENTS FOR THIS TYPE OF CONSTRUCTION. THE BUILDING DOES NOT APPEAR TO MEET THE 1-HOUR CONSTRUCTION REQUIRED TO MEET ALLOWABLE AREA FOR TYPE OF CONSTRUCTION PER DISCUSSIONS WITH OWNER & ARCHITECT AT NOVEMBER 3, 1997 MEETING.
Routing plans to fire department for review analysis while waiting for response.
|
Plan resubmittals requested | | | 11/30/1999 | | FAIL |
|
|
|
FAXED AND MAILED COPY OF PLAN REVIEW ITEMS NEEDING TO BE CLARIFIED BY THE ARCHITECT & OWNER BEFORE THE PLAN REVIEW CAN PROCEED FOR 4696 OVERLAND ROAD, HILLCREST BUSINESS CENTER REMODEL.
|
Routing - PUBLIC WORKS | 11/15/1999 | | 11/17/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 11/15/1999 | 11/15/1999 | 11/15/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/10/1999 | 11/10/1999 | 11/12/1999 | | PEND |
|
|
|
ROUTING TO OTHER AGENCIES FOR REVIEW - PW; PLANNING; PLAN CHECK; FIRE.
|
Plan resubmittals received | | | 11/10/1999 | | DONE |
|
|
|
RECEIVED REVISED SHEETS A3.1, A3.2, A3.3, A3.4, PUT WITH PLANS AND ROUTED ALL TO DAN ST. KMM
|
Telephone call | | | 11/9/1999 | | DONE |
|
|
|
CALL FROM JOE NUMBERS CONCERNING NEED TO TEAR OFF EXISTING ROOF COVERING BEFORE DOING OVER-BUILD WITH NEW TRUSSES & ROOF DECK. PREVIOUS PROJECTS HAVE REQUIRED TEAR OFF. I TOLD JOE I WOULD REVIEW REQUIREMENTS WITH OTHER PLAN REVIEWERS & THE FIRE CODE ANALYST REVIEWER TO DETERMINE WHAT WAS REQUIRED. AFTER REVIEWING QUESTION, IT WAS FELT THAT LEAVING THE EXISTING BUR ROOF COVER IN PLACE WOULD NOT CAUSE CONCERN IF THE ROOF IS NOT PART OF A REQUIRED ROOF/CEILING ASSEMBLY WHERE THE ROOFCOVER MAY CHANGE THE ABILITY OF THE ROOF SYSTEM TO DISPERSE HEAT.
|
Meeting | | | 11/3/1999 | | |
|
|
|
PRELIMINARY MEETING WITH TED SIGMONT (OWNER), DENNIS KELLEY(REALTOR), KEVIN MCKEE (ARCHITECT), JOE NUMBERS (PROJECT ARCHITECT) & DAN STUART (PLANS EXAMINER).
PLANS HAD BEEN SUBMITTED FOR NEW STRUCTURAL ROOF OVERBUILD, EXTERIOR UPGRADES & INTERIOR UPGRADES/ADDITION FOR 4696 & 4620 OVERLAND.
KATHY MILLER, PLAN TECH, ASK THE PLANS TO BE SPLIT INTO SEPAERATE APPLICATIONS, PLAN SUBMITTALS SINCE THE WORK INVOLVED TWO DISTINCT STRUCTURES ON DIFFERENT PROPERTY. THE ARCHITECT WAS ALSO ASK TO SUBMIT NEW CERTIFICATE OF VALUES FOR EACH, FULLY DIMENSIONED FLOOR PLANS AND OCCUPANCY USES FOR AREAS WITHIN THE BUILDINGS.
THE NEW OWNER, HIS ARCHITECT AND REALTOR WANTED TO MEET TO REVIEW SCOPE OF THE PROJECT AND POSSIBILITYIES FOR ADDRESSING THE PROPERTY LINE ISSUE, TYPE OF CONSTRUCTION OF BUILDINGS (PROPOSED & ACTUAL), WHAT THE CORRIDOR REQUIREMENTS ARE FOR THE STRUCTURE AND WHAT PROCEDURES WILL NEED TO BE FOLLOWED TO OBTAIN PERMITS FOR THE EXTERIOR MODIFICATIONS AND FOR EACH SEPARATE TENANT USE IN THE FUTURE AS NEW TENANTS ARE FOUND AND UPGRADES DESIRED.
WE DISCUSSED OPTIONS OF REMOVING PROPERTY LINE BY A REDUCTION IN DENSITY SURVEY AND INSTALLATION OF A FOUR HOUR AREA SEPARATION WALL BETWEEN THE DIFFERENT TYPES OF CONSTRUCTION or MAINTAIN THE PROPERTY LINE AND CORRECT THE WALL CONSTRUCTION & OPENING PROTECTION OF THE EXISTING EXTERIOR WALLS OF BOTH BUILDINGS BASED ON PROXIMITY TO PROPERTY LINE. THIS QUESTION WILL NEED TO BE ANSWERED BEFORE THE ROOF / EXTERIOR MODIFICATION PERMIT CAN BE CONSIDERED. THE ARCHITECT IS TO DO AN ANALYSIS OF THE EXISTING BUILDING(S) TO DETERMINE ACTUAL CONSTRUCTION TYPE(S), BUILDING CODE THAT IS DESIRED FOR USE TO ADDRESS UPGRADES TO MEET a) THE CODE YEAR UNDER WHICH CONSTRUCTED, b) THE CURRENT CODE FOR THE ENTIRE STRUCTURE. ARCHITECT AND OWNER ARE TO DETERMINE WHAT APPROACH THEY WANT TO TAKE REGARDING PTY.LINE. THIS IS TO BE DONE BEFORE PLANS ARE SUBMITTED OR PLANS WILL BE PUT ON HOLD UNTIL ANSWERS ARE RECEIVED.
THE
|
Additional plans submitted | | | 11/1/1999 | | PEND |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/25/1999 | | FAIL |
|
|
|
1. CERTIFICATE OF VALUE NOT COMPLETELY FILLED IN . 2.ALL ROOMS NOT LABELED. 3. PLANS NEED MORE DIMENSIONS 4.NEED PROPERTY LINES DEPICTED ON SITE PLAN. 5. ONE MORE SET OF PLANS IS REQUIRED TO SEND TO STRUCTURAL ENGINEER. 6. IS CORRIDOR RATED? CONTACTED GEORGE SLAUGHTER ABOUT REQUIREMENTS HIS NUMBER IS ###-#### AS HE NO LONGER WORKS FOR KEVEN MCKEE AND ASSOCIATES, BUT IS FINISHING THIS PROJECT. 10/26/99 DAR
|
Application received | | | 10/22/1999 | | |
|
|
|
|
Fee Review-notes | 10/22/1999 | 10/22/1999 | | | |
|
|
|
|