Permit Information
Permit NumberBLD99-03235
StatusFinaled
Name EMPIRE BUILDING (PHASE 3)
Site Address 205 N 10TH ST
Project NameEMPIRE BLDG-CORE AREAS
Customer Number 
ePlanReviewNo
Description
(EMPIRE BUILDING - PHASE 3) This building is fire sprinklered under the provisions of the 1994 UCBC to allow it to be 2 stories and 26 feet too tall. To complete the shell and core work (phase 3) of a building renovation. Work is to include 12 restrooms accessible to the disabled, nonrated corridors connecting stairways on the 2nd, 3rd, 4th, 5th, & 6th floors, a 1-hr fire resistive corridor in the basement, smoke protection on elevator doors, and elevator lobby finishes on all floors all per approved drawings and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13-1996 and the alarm system shall comply with NFPA 72-1996 as regulated by the Fire Department. This permit does not establish a Certificate of Occupancy for any tenant. PC-857-99 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes10/25/199910/25/19993/21/2001 DONE
Letter of compliance  1/8/2001 DONE
Letter of Compliance issued 1-8-01.
BLD-Final1/4/20011/4/20011/4/2001PPASS
DetailsCarl Dependahl
ED ###-####, work on handrail ok as spec'd by inspector 1/4/2001 5:17:42 PM
FIRE-Final Inspection12/28/200012/29/200012/29/2000APASS
DetailsRick Jackson
###-####
BLD-Final12/28/200012/29/200012/29/2000PPASS
DetailsJim Storey
###-#### l/c ok engineers letter in archive. 12/29/2000 4:57:40 PM
BLD-Final12/26/200012/26/200012/26/2000PCANC
DetailsJim Storey
###-####
BLD-Conference11/20/200011/20/200011/20/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/20/2000 5:02:44 PM w/ fire & wensel; need complete c/n
BLD-Final11/16/200011/16/200011/16/2000PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 11/16/2000 1:33:01 PM c/n issued re stairs, bsmt corridor, rails, etc
Plan resubmittals received  9/25/2000 DONE
RECEIVED TWO SETS OF PLAN RESUBMITTALS SHEETS PR 12.6 AND SMALL DOCUMENTS, FORWARDED SAME TO PERRY PAINE. 9/25/00 DAR
BLD-Framing/Rough-in8/2/20008/3/20008/3/2000APART
Details
ED-- ###-#### CEILING INSP ok to drop in ceiling tilesand start close up of the shaft areas 8/3/2000 3:27:12 PM
Plan resubmittals received  6/26/2000 DONE
RECEIVED ONE COPY OF SHEETS A6.4 AND 6.5. ROUTED TO PERRY PAIN. KMM
Plan resubmittals received  2/17/2000 DONE
RECEIVED ONE COPY OF REVISED SHEETS E2.1PC E2.2PC E3.0C E3.2C E5.0C. ONE COPY OR STRUCT. CALCS. ROUTED TO PERRY P. KMM
Routing Off Site - A.C.H.D2/11/20002/11/20002/11/2000 DONE
As per letter from 1/14/00-David Szplett.
Issue PAID IN FULL permit  2/11/2000 DONE
Plan assigned to (CJW)10/27/1999 12/29/1999 PASS
DetailsCarl Westfall
12/29/1999 14:28:20 CJW - activity updated through activity BLDA022 from case BLD99-03235.
Routing - PLAN CHECK12/7/1999 12/29/1999 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/29/1999 PASS
Print Occupancy Form  12/29/1999 DONE
Inspection Record Card- Bld  12/29/1999 DONE
Routing - FIRE12/2/199912/6/199912/6/1999 PASS
Plan Review Completed(1st rev)  12/6/1999 PEND
Plan Reviewer's activity  11/29/1999 PASS
UBC plan review strated November 29, 1999 and finished December 2, 1999. Drawings approved with conditions. See conditions list.
Routing - PLAN CHECK10/29/1999 11/2/1999 PASS
Routing - PLUMBING10/28/1999 10/29/1999 PASS
Routing - PUBLIC WORKS10/27/1999 10/28/1999 PASS
Pending Assignment by MYS10/25/1999 10/27/1999 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  10/27/1999 DONE
Route to PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  10/26/1999  
Application received  10/25/1999  
Telephone Call     
RON MOSS GAVE PHONE MESSAGE W/DOLLAR AMOUNT-TOLD HIM ABOUT ACHD/MPS