Fee Review-notes | 10/28/1999 | 10/28/1999 | 2/20/2001 | | DONE |
|
|
|
|
BLD-Final | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | PASS |
Tom Arcoraci
|
|
|
Fred ###-#### 1/5/2001 11:40:56 AMok for perm occ
1/5/2001 11:41:59 AM
|
BLD-Final | 1/5/2001 | 1/5/2001 | 1/5/2001 | A | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 1/5/2001 8:16:11 AM Reinsp OK for certificate of completion. Elevator recall removed from permit. New permit to be issued
|
Letter of compliance | | | 1/5/2001 | | DONE |
|
|
|
Letter of Compliance issued 1-5-01.
|
FIRE-Conference | 9/18/2000 | 9/19/2000 | 9/19/2000 | A | PART |
Joe Tawney
|
|
|
Reinsp OK on upgrades in Lab area Elevator recall still not resolved. 9/19/2000 12:22:51 PM
|
FIRE-Final Inspection | 9/8/2000 | 9/11/2000 | 9/11/2000 | P | CANC |
Joe Tawney
|
|
|
fred ###-#### Cancelled not ready 9/11/2000 12:30:15 PM
|
FIRE-Final Inspection | 9/8/2000 | 9/8/2000 | 9/8/2000 | P | FAIL |
Joe Tawney
|
|
|
Fred Howe ###-#### Final Fail C/N issued 9/8/2000 4:32:22 PM
|
FIRE-Final Inspection | 8/22/2000 | 8/23/2000 | 8/23/2000 | A | PART |
Joe Tawney
|
|
|
Bryan ###-#### Partial system tested ok. several HAD to be disabled.Letter on status forthcoming. 8/23/2000 8:31:39 AM
|
FIRE-Final Inspection | 8/21/2000 | 8/23/2000 | 8/23/2000 | A | CANC |
Joe Tawney
|
|
|
###-#### Cancel Permit clerk entered on wrong day again. 8/22/2000 12:16:49 PM
|
BLD-Framing/Rough-in | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | PART |
Carl Dependahl
|
|
|
###-####
|
BLD-Framing/Rough-in | 4/21/2000 | 4/21/2000 | 4/21/2000 | P | PART |
Carl Dependahl
|
|
|
###-####
|
Issue PAID IN FULL permit | | | 2/25/2000 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 11/8/1999 | | 2/24/2000 | | PASS |
Dan Stuart
|
|
|
2/24/2000 15:29:19 DRS - activity updated through activity BLDA022 from case BLD99-03266.
|
Telephone call | | | 2/24/2000 | | DONE |
|
|
|
called Mark Van Gulik at###-#### left message
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2000 | | PASS |
|
|
|
Routing to front desk for issuance.
|
Inspection Record Card- Bld | | | 2/24/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/24/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/23/2000 | | 2/24/2000 | | PASS |
|
|
|
Received re-submittals. Inserted into plans. Routing to fron desk for issuance.
|
Routing - PLUMBING | 2/17/2000 | | 2/23/2000 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/22/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROMNJRA ARCHITECTS, MYKEL DAVIS,2 OF SHEET A0.2 . FORWARDED SAME TO DAN STUART. 2/22/00 DAR
|
Routing - FIRE | 2/16/2000 | 2/16/2000 | 2/16/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/21/1999 | 12/21/1999 | 2/15/2000 | | PEND |
|
|
|
INSERTED RESUBMITTALS RECEIVED 2/11/00 INTO PLANS & REVIEWED RESUBMITTALS FOR CORRECTED RESPONSE. ROUTING PLANS TO FIRE DEPT FOR RE-REVIEW WHILE WAITING TO TALK W/ THE ARCHITECT CONCERNING CLARIFICATION OF THE DESIGNATED FIRE WALL LOCATIONS AND UPGRADE OF WALLS LOCATED WITHIN THE SCOPE OF THIS PROJECT TO MATCH HIS DESIGNATED RATINGS.
|
Plan resubmittals received | | | 2/11/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED PLANS. TWO COPIES OF RESPONSE LETTER AND TWO COPIES OF FIRE DENIAL REVIEW. ROUTED TO DAN S. KMM
|
Routing - FIRE | 12/17/1999 | 12/21/1999 | 12/21/1999 | | FAIL |
|
|
|
NEEDED WALL SEPERATION INFORMATION PER UBC / UFC REVIEW.
|
Plan Review Completed(1st rev) | | | 12/21/1999 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 11/17/1999 | | 12/17/1999 | | FAIL |
|
|
|
Plans failed review. Faxed and mailed copy of corrections resubmittals required to Mykel (michael) Davis with fax copy to Mark Van Gulik, Kreizenbeck Constructors. Routing to Fire Code Analyst for review.
|
Plan resubmittals requested | | | 12/17/1999 | | FAIL |
|
|
|
Copy of plan review comments faxed and mailed to Mykel Davis. Called him to verify he received them.
|
Routing - PLUMBING | 11/8/1999 | | 11/17/1999 | | FAIL |
|
|
|
lab water needs to be seperated from domestic water with rps'. restrooms breakroom, emergency shower and eyewashes are potable fixtures.
|
Pending Assignment by MYS | 10/28/1999 | | 11/8/1999 | | DONE |
Marlene Southard
|
|
|
|
Routing - PUBLIC WORKS | 11/8/1999 | | 11/8/1999 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 11/8/1999 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
|
Plans ACCEPTED BY PLAN TECH | | | 11/4/1999 | | PEND |
|
|
|
11/4/99 MARK OF KRIZENBECK TOOK PLANS BACK TO OFFICE TO FIX CORRECTIONS REQUESED BY DAVE ON 10/29/99. WILL PUT APPLICATION IN FILE UNDER CURTIS ADDRESS. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 11/4/1999 | | PEND |
|
|
|
RECEIVED REQUIRED ITEMS, FORWARDED PLANS TO MARLENE. 11/4/99 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 10/29/1999 | | FAIL |
|
|
|
PLANS ON HOLD UNTIL CORRECTIONS TO THE FOLLOWING ITEMS ARE RECEIVED. MARK VAN GULIK OF KRIZENBECK NOTIFIED OF THE FOLLOWING DEFICIENCIES : THE ELECTRICAL, PLUMBING AND MECHANICAL NEED TO BE FILLED IN ON THE CERTIFICATE OF VALUE. THE ARCHITECT/ENGINEER OF REDORD FORM NEEDS TO BE COMPLETELY FILLED IN AND SIGNED. SHEETS A.0.0 - A9.1 NEED TO BE SIGNED. THEY ARE SEALED BUT NOT SIGNED., OR REPLACED WITH SHEETS THAT ARE SEALED AND SIGNED. NEED AN EQUIPMENT SCHEDULE , 11600 IS NOT IN THE PROJECT MANUAL AS STATED ON THE PLANS. PLANS NEED TO BE DIMENSIONED AS PER THE EXAMPLE THAT WAS FAXED. THE COMPLETE PARAGRAPH ON FIRE STOPPIN G NEEDS TO BE ON THE SHEETS AND ND NOT JUST THE NUMBER. THIS PROJECT IS ON HOLD UNTIL CORRECTION INFORMATION IS RECEIVED. 10/29/99 DAR
|
Application received | | | 10/28/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 2/23/2000 | 2/23/2000 | | | |
|
|
|
|