Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-03303
StatusFinaled
Name FIDELITY BUILDING (SHELL)
Site Address 242 N 8TH ST
Project NameFIDELITY BLDG
Customer Number 
ePlanReviewNo
Description
(FIDELITY BUILDING) This building is fully fire-sprinklered to substitute for 1-hr fire-resistive construction. To renovate the main lobby and reconfigure the 2nd floor lobby and office spaces within an existing building. Work is to include selective demolition, a reconfigured stairway, interior nonbearing walls, interior doors, interior windows, and suspended ceilings all per approved drawings and plan review conditions on file. Installation of a cooler for "Pollo Rey" will require a separate building permit. Fire sprinkler heads shall be relocated, if necessary, to comply with NFPA 13-1996 as regulated by the Fire Department. This permit shall not establish a Certificate of Occupancy for any tenant. PC-876-99 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference6/20/20016/20/20016/20/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/20/2001 5:43:28 PM need accurate plan for modifications/deletions; tenants may req. c/o's; arch states that t/i follow up will address these issues, regarding deletion of "fancy" lobby & simpler replacement.
BLD-Conference5/7/20015/8/20015/8/2001APASS
DetailsCarl Dependahl
###-####; met w/ arch,submit for changes/deletions; appears to be finalled, but reception area was left open. 5/8/2001 11:37:13 AM 5/8/2001 11:40:20 AM
BLD-Conference5/7/20015/7/20015/7/2001PCANC
DetailsCarl Dependahl
doug ###-####
BLD-Conference5/2/20015/2/20015/2/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/2/2001 10:28:28 AM need submittals for modification / completion deleting some features of job for review.
Fee Review-notes11/2/199911/2/19997/24/2000 DONE
BLD-Final6/14/20006/15/20006/15/2000APASS
Details
ryan ###-#### please call first signed the perm col ok 6/15/00 3:53:07 PM
Letter of compliance  6/15/2000 DONE
Letter of Compliance #18514 issued 6-15-00.
FIRE-Final Inspection6/13/20006/13/20006/13/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/13/2000 at 11:27:30. Contact: ###-####.
FIRE-Final Inspection6/12/20006/12/20006/12/2000PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/12/2000 at 10:00:48. Contact: ###-####. Repair exit signs 6/13/00 2:38:05 PM
BLD-Conference3/6/20003/7/20003/7/2000APASS
Details
Scheduled by a contractor via Hello! on 03/06/2000 at 15:05:10. Contact: ###-####. with jack on the new shower, ok to have slope up to shower area in the 5' radius 3/8/00 8:52:33 AM
BLD-Framing/Rough-in2/21/20002/22/20002/22/2000APART
Details
Scheduled by a contractor via Hello! on 02/21/2000 at 08:56:19. Contact: ###-####. made ok to start covering the stair walls 2/22/00 5:28:39 PM
BLD-Framing/Rough-in2/14/20002/15/20002/15/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/14/2000 at 15:40:08. Contact: ###-####. Frame ok 2nd floor ramp/ 2 office space at hall ceiling at entry. 2/18/00 9:35:22 AM
FIRE-Conference2/10/20002/11/20002/11/2000APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/10/2000 at 07:36:16. Contact: ###-####. Requested info on alarms; placement of exit signs. 2/14/00 12:04:48 PM
BLD-Conference1/27/20001/28/20001/28/2000APASS
Details
Scheduled by a contractor via Hello! on 01/27/2000 at 15:47:42. Contact: ###-####. with jack on the scheduling of the work not ot affect the exiting from the 2nd floor 2/1/00 8:54:22 AM
Telephone call  1/12/2000 DONE
TALKED TO PHILLIS GAVE DOLLAR AMOUNT
Print Occupancy Form  1/12/2000 DONE
Inspection Record Card- Bld  1/12/2000 DONE
Issue PAID IN FULL permit  1/12/2000 DONE
Plan assigned to (CJW)11/8/1999 1/11/2000 PASS
DetailsCarl Westfall
1/11/00 17:21:11 CJW - activity updated through activity BLDA022 from case BLD99-03303.
Routing - PLAN CHECK12/9/1999 1/11/2000 PASS
Drawings on hold while waiting for resubmittals from the architect.
Plan Reviewer's activity  1/11/2000 PASS
Drawings approved, with conditions, after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  1/11/2000 PASS
Plan resubmittals received  1/7/2000 DONE
RECEIVED THREE COPIES OF REVISED SHEETS a0.01, a2.00,, a2.01, a2.02, a2.03, a2.10, a2.11, a2.12, a2.31, a3.21, a3.22, a5.11 ONE COPY OF COVER LETTER AND ONE COPY OF STRUCT. CALCS. ROUTED TO CARL W. KMM
Routing - FIRE12/8/1999 12/9/1999 PASS
Plan Review Completed(1st rev)  12/9/1999 PEND
Routing - PLAN CHECK11/9/1999 12/8/1999  
Plan resubmittals requested  12/8/1999  
Plan review sent to the architect. Resubmittals required.
Plan Reviewer's activity  12/6/1999  
UBC plan review started December 6, 1999 and finished December 8, 1999. Resubmittals from the architect are required. See the conditions list.
Routing Off Site - C.D.H11/9/1999 11/9/1999 PASS
Pending Assignment by MYS11/8/1999 11/8/1999 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  11/8/1999 DONE
Route to CENTRAL DISTRICT HEALTH, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  11/2/1999 DONE
Received Certificate of Value  11/2/1999 DONE
Application received  11/2/1999  
Recd Pcfee & Taken To Pln CK  11/2/1999 DONE