BLD-Conference | 6/20/2001 | 6/20/2001 | 6/20/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/20/2001 5:43:28 PM need accurate plan for modifications/deletions; tenants may req. c/o's; arch states that t/i follow up will address these issues, regarding deletion of "fancy" lobby & simpler replacement.
|
BLD-Conference | 5/7/2001 | 5/8/2001 | 5/8/2001 | A | PASS |
Carl Dependahl
|
|
|
###-####; met w/ arch,submit for changes/deletions; appears to be finalled, but reception area was left open. 5/8/2001 11:37:13 AM 5/8/2001 11:40:20 AM
|
BLD-Conference | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | CANC |
Carl Dependahl
|
|
|
doug ###-####
|
BLD-Conference | 5/2/2001 | 5/2/2001 | 5/2/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/2/2001 10:28:28 AM need submittals for modification / completion deleting some features of job for review.
|
Fee Review-notes | 11/2/1999 | 11/2/1999 | 7/24/2000 | | DONE |
|
|
|
|
BLD-Final | 6/14/2000 | 6/15/2000 | 6/15/2000 | A | PASS |
|
|
|
ryan ###-#### please call first signed the perm col ok 6/15/00 3:53:07 PM
|
Letter of compliance | | | 6/15/2000 | | DONE |
|
|
|
Letter of Compliance #18514 issued 6-15-00.
|
FIRE-Final Inspection | 6/13/2000 | 6/13/2000 | 6/13/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/13/2000 at 11:27:30. Contact: ###-####.
|
FIRE-Final Inspection | 6/12/2000 | 6/12/2000 | 6/12/2000 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/12/2000 at 10:00:48. Contact: ###-####. Repair exit signs 6/13/00 2:38:05 PM
|
BLD-Conference | 3/6/2000 | 3/7/2000 | 3/7/2000 | A | PASS |
|
|
|
Scheduled by a contractor via Hello! on 03/06/2000 at 15:05:10. Contact: ###-####. with jack on the new shower, ok to have slope up to shower area in the 5' radius 3/8/00 8:52:33 AM
|
BLD-Framing/Rough-in | 2/21/2000 | 2/22/2000 | 2/22/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 02/21/2000 at 08:56:19. Contact: ###-####. made ok to start covering the stair walls 2/22/00 5:28:39 PM
|
BLD-Framing/Rough-in | 2/14/2000 | 2/15/2000 | 2/15/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/14/2000 at 15:40:08. Contact: ###-####. Frame ok 2nd floor ramp/ 2 office space at hall ceiling at entry. 2/18/00 9:35:22 AM
|
FIRE-Conference | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 07:36:16. Contact: ###-####. Requested info on alarms; placement of exit signs. 2/14/00 12:04:48 PM
|
BLD-Conference | 1/27/2000 | 1/28/2000 | 1/28/2000 | A | PASS |
|
|
|
Scheduled by a contractor via Hello! on 01/27/2000 at 15:47:42. Contact: ###-####. with jack on the scheduling of the work not ot affect the exiting from the 2nd floor 2/1/00 8:54:22 AM
|
Telephone call | | | 1/12/2000 | | DONE |
|
|
|
TALKED TO PHILLIS GAVE DOLLAR AMOUNT
|
Print Occupancy Form | | | 1/12/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/12/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/12/2000 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 11/8/1999 | | 1/11/2000 | | PASS |
Carl Westfall
|
|
|
1/11/00 17:21:11 CJW - activity updated through activity BLDA022 from case BLD99-03303.
|
Routing - PLAN CHECK | 12/9/1999 | | 1/11/2000 | | PASS |
|
|
|
Drawings on hold while waiting for resubmittals from the architect.
|
Plan Reviewer's activity | | | 1/11/2000 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/11/2000 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/7/2000 | | DONE |
|
|
|
RECEIVED THREE COPIES OF REVISED SHEETS a0.01, a2.00,, a2.01, a2.02, a2.03, a2.10, a2.11, a2.12, a2.31, a3.21, a3.22, a5.11 ONE COPY OF COVER LETTER AND ONE COPY OF STRUCT. CALCS. ROUTED TO CARL W. KMM
|
Routing - FIRE | 12/8/1999 | | 12/9/1999 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 12/9/1999 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 11/9/1999 | | 12/8/1999 | | |
|
|
|
|
Plan resubmittals requested | | | 12/8/1999 | | |
|
|
|
Plan review sent to the architect. Resubmittals required.
|
Plan Reviewer's activity | | | 12/6/1999 | | |
|
|
|
UBC plan review started December 6, 1999 and finished December 8, 1999. Resubmittals from the architect are required. See the conditions list.
|
Routing Off Site - C.D.H | 11/9/1999 | | 11/9/1999 | | PASS |
|
|
|
|
Pending Assignment by MYS | 11/8/1999 | | 11/8/1999 | | DONE |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 11/8/1999 | | DONE |
|
|
|
Route to CENTRAL DISTRICT HEALTH, PLAN CHECK and FIRE.
|
Plans ACCEPTED BY PLAN TECH | | | 11/2/1999 | | DONE |
|
|
|
|
Received Certificate of Value | | | 11/2/1999 | | DONE |
|
|
|
|
Application received | | | 11/2/1999 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/2/1999 | | DONE |
|
|
|
|