Permanent Occupancy | | 8/18/2000 | 8/18/2000 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 8/18/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8337 issued 8-18-00 to the Sav On grocery store.
|
(F) Reprint permit | | | 7/27/2000 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/27/2000 | | DONE |
|
|
|
|
Fee Review-notes | 11/2/1999 | 11/2/1999 | 7/25/2000 | | DONE |
|
|
|
final cert project 2,510,000. ele 365,700.00 plm 117,800.00 mec 110,800.00
|
BLD-Final | 5/31/2000 | 6/1/2000 | 6/1/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 05/31/2000 at 14:45:04. Contact: ###-####. signed the temp col 6/1/00 11:37:33 AM
|
Temporary occupancy | | | 6/1/2000 | | PART |
|
|
|
Temp. Occ. Cert. #4024 issued 6-1-00 to Sav-On Grocery Store.
|
FIRE-Final Inspection | 5/30/2000 | 5/31/2000 | 5/31/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/30/2000 at 14:57:13. Contact: ###-####.
|
FIRE-Final Inspection | 5/19/2000 | 5/22/2000 | 5/22/2000 | A | FAIL |
Rick Jackson
|
|
|
###-#### C/N issued 5/23/00 2:19:13 PM
|
BLD-Other | 5/9/2000 | 5/10/2000 | 5/10/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/09/2000 at 15:38:01. Contact: ###-####. Conf. on final. 5/11/00 11:54:25 AM
|
BLD-Conference | 4/17/2000 | 4/17/2000 | 4/17/2000 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 09:33:28. Contact: ###-####. Mechanical inspector will be out of this. 4/18/00 10:50:46 AM
|
BLD-Other | 4/13/2000 | 4/14/2000 | 4/14/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/13/2000 at 10:03:58. Contact: ###-####. Grid ok west side 4/14/00 1:51:27 PM
|
FIRE-Sprinkler Rough-in | 4/13/2000 | 4/14/2000 | 4/14/2000 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/13/2000 at 10:04:44. Contact: ###-####. Heads/drops missing by pharmacy; ok to cover sales area 4/17/00 1:51:41 PM
|
FIRE-Sprinkler Rough-in | 4/3/2000 | 4/4/2000 | 4/4/2000 | A | PART |
Rick Jackson
|
|
|
okay to cover main sales areaeast side
|
BLD-Other | 3/28/2000 | 3/29/2000 | 3/29/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/28/2000 at 08:19:43. Contact: ###-####. Went out could not find general contractor on site. 3/29/00 2:12:55 PM
|
FIRE-Conference | 3/22/2000 | 3/23/2000 | 3/23/2000 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 03/22/2000 at 11:59:40. Contact: ###-####. When to have sprinkler R/I 3/27/00 9:56:57 AM
|
BLD-Framing/Rough-in | 3/7/2000 | 3/7/2000 | 3/7/2000 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/07/2000 at 08:52:33. Contact: ###-####. Right front areas ok to sheetrock. 3/8/00 10:36:51 AM
|
BLD-Framing/Rough-in | 2/23/2000 | 2/24/2000 | 2/24/2000 | P | PART |
Russ Owen
|
|
|
rear office space left side ok to cover. 2/28/00 9:01:58 AM
|
BLD-Framing/Rough-in | 2/3/2000 | 2/4/2000 | 2/4/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/03/2000 at 07:59:49. Contact: ###-####. Partial roof nailing inspection. 2/4/00 2:02:38 PM
|
BLD-Foundation | 2/3/2000 | 2/3/2000 | 2/3/2000 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/03/2000 at 07:58:15. Contact: ###-####. Special insp. req. 2/4/00 2:06:52 PM
|
BLD-Foundation | 1/26/2000 | 1/26/2000 | 1/26/2000 | P | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 01/26/2000 at 08:24:41. Contact: ###-####. Pier's ok- special inspector on site. 2/7/00 8:35:14 AM
|
BLD-Foundation | 1/21/2000 | 1/24/2000 | 1/24/2000 | A | PART |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 07:05:21. Contact: ###-####. Special inspectin on site. 1/25/00 1:31:01 PM
|
BLD-Footing | 1/21/2000 | 1/21/2000 | 1/21/2000 | A | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 07:04:38. Contact: ###-####. Special inspector on site- placing dobbies for 3" clearance to earth. 1/25/00 12:10:53 PM
|
BLD-Footing | 1/19/2000 | 1/20/2000 | 1/20/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/19/2000 at 15:18:37. Contact: ###-####. Foot ok spec. required. 1/20/00 4:17:13 PM
|
Routing - PLAN CHECK | 12/29/1999 | 12/29/1999 | 1/3/2000 | | PASS |
Ron Hill
|
|
|
|
Routing - PLAN CHECK | 12/15/1999 | 12/15/1999 | 1/3/2000 | | PASS |
Ron Hill
|
|
|
|
Plan Reviewer's activity | | | 1/3/2000 | | PASS |
Ron Hill
|
|
|
RECEIVED OUTSIDE ENGINEERING COMMENTS, NO CORRECTIONS REQUIRED.
|
Case Summary (BLD) | | | 1/3/2000 | | PASS |
Ron Hill
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/3/2000 | | PASS |
Ron Hill
|
|
|
|
Print Occupancy Form | | | 1/3/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/3/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/3/2000 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 11/15/1999 | | 1/3/2000 | | PASS |
|
|
|
1/3/2000 09:04:01 RMH - activity updated through activity BLDA022 from case BLD99-03310.
|
Routing - PLAN CHECK | 12/2/1999 | | 1/3/2000 | | PASS |
Ron Hill
|
|
|
|
Routing - FIRE | 12/30/1999 | 12/30/1999 | 12/30/1999 | | PASS |
Bill Alexander
|
|
|
APPROVED BY DAVE MILLER
|
Routing - PLANNING | 11/16/1999 | | 12/29/1999 | | PASS |
|
|
|
Revised 12/28, approved as per Cup -00128 TAC and approved per DRH99-00226 by MGS.
|
Routing Off Site - STRUCTURAL | 12/21/1999 | | 12/23/1999 | | |
Ron Hill
|
|
|
CONTACTED PDQ TO TAKE REVISED PLANS TO OUTSIDE ENG. KMM
|
Plan resubmittals received | | | 12/23/1999 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM CSHQA ARCHITECTS, JOHN IRVINE, FORWARDED SAME TO RON HILL.. 12/23/99 DAR
RECEIVED PLAN RESUBMITTALS (SECOND SET)FROM CSHQA ARCHITECTS
SHEET1.1 FROWARDED SAME TO RON HILL. DAR 12/23/99
|
Plan resubmittals received | | | 12/20/1999 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM CSHQA, JOHN IRVINE , A SHEETS AND A LETTER ADDRESSING THE STRUCTURAL COMMENTS, FORWARDED SAME TO RON HILL. 12/21/99 DAR
|
Routing - FIRE | 12/14/1999 | 12/15/1999 | 12/15/1999 | | FAIL |
|
|
|
Lacks F.D. access around the loading dock meeting UFC minimum requirments. Questioned F.D. access maximum 40 feet due to limitation of access to existing riser location from drive.
|
Plan Review Completed(1st rev) | | | 12/15/1999 | | FAIL |
|
|
|
|
Plan Reviewer's activity | | | 12/13/1999 | | FAIL |
Ron Hill
|
|
|
Faxed and mailed requirements to the architect. Will route to fire for review.
|
Plan resubmittals received | | | 12/6/1999 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS 1.0, 1.1, 1.3, 1.4, 1.5, 1.6, 1.11, 1.12, 2.1A, FROM CSHQA. ONE COPY OF COVER LETTER. ROUTED TO RON H. KMM
|
Received Certificate of Value | | | 12/2/1999 | | DONE |
|
|
|
RECEIVED CERT. OF VALUE FOR THE DEMO WORK. ROUTED TO RON HILL. KMM
|
Routing - PLUMBING | 11/23/1999 | | 12/2/1999 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 11/29/1999 | | FAIL |
Ron Hill
|
|
|
Mailed strctural plan check requirments to Kent Hanway at CHSQA 11-29-99.
|
Routing Off Site - STRUCTURAL | 11/4/1999 | | 11/19/1999 | | PEND |
|
|
|
PLANS SENT TO STRUCTUAL ENGINEERING CONSULANT VIA PDQ. 11/3/99 DAR
|
Additional plans submitted | | | 11/18/1999 | | PEND |
|
|
|
RECEIVED AN ADDENDUM FROM CSHQA, FORWARDED SAME TO RON HILL. 11/18/99 DAR
|
Routing - PUBLIC WORKS | 11/15/1999 | | 11/16/1999 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 11/15/1999 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLANNING, PLUMBING, PLAN CHECK and FIRE.
|
Plans ACCEPTED BY PLAN TECH | | | 11/4/1999 | | DONE |
|
|
|
RECEIVED ITEMS REQUESTED. KMM
|
Received Certificate of Value | | | 11/3/1999 | | DONE |
|
|
|
|
Additional plans submitted | | | 11/3/1999 | | PEND |
|
|
|
THREE SETS OF CIVIL PLANS SUBMITTED BY CSHQA, PLANS FORWARDED TO MARLENE SOUTHARD
|
Plans ACCEPTED BY PLAN TECH | | | 11/3/1999 | | FAIL |
|
|
|
REQUIRES THREE COPIES OF GRADING AND DRAINAGE PLANS. SHEETS 1.2, 3.4B, 3.5, 3.6 AND 3.11 NEED TO BE STAMPED AND SIGNED. CONTACTED JOHN IRVING ABOUT THESE ITEMS. KMM
|
Application received | | | 11/2/1999 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|