Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-03310
StatusFinaled
Name SUNDANCE CONSTRUCTION
Site Address 2450 N BOGUS BASIN RD
Project NameALBERTSONS
Customer Number 
ePlanReviewNo
Description
To remodel an existing 41,365 sq.ft. grocery store for new owner/tenant to reduce the building area to 26,259 sq.ft. per approved plans and engineering on file. Work inlcudes site improvements per DRH99-00226 and CUP99-00128. Building remodel includes, total renovation of the whole building, structural demolition to roof and walls, new exterior bearing cmu wall, new roof, new canopys on the exterior over drive through and entrance area , new interior nonbearing partitions, installation of new walk-in coolers and freezers, installation of a new type I hood and one hour rated shaft for grease duct, new power sliding doors and two swinging exit doors, installation of new suspended ceiling system, construction of accessible restrooms. Miscelaneous related finishes, Electrical, Mechanical and plumbing work. NOTE: This building is fully fire sprinklered for area increase. All fire sprinkler modifications and alterations must comply with NFPA #13 as regulated by the fire department. (P.C.#878-99)*RMH*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 8/18/20008/18/2000 DONE
Details
Permanent occupancy UNPAID FEE  8/18/2000 DONE
Perm. Occ. Cert. #8337 issued 8-18-00 to the Sav On grocery store.
(F) Reprint permit  7/27/2000 DONE
(F) Reprint permit  7/27/2000 DONE
Fee Review-notes11/2/199911/2/19997/25/2000 DONE
final cert project 2,510,000. ele 365,700.00 plm 117,800.00 mec 110,800.00
BLD-Final5/31/20006/1/20006/1/2000APART
Details
Scheduled by a contractor via Hello! on 05/31/2000 at 14:45:04. Contact: ###-####. signed the temp col 6/1/00 11:37:33 AM
Temporary occupancy  6/1/2000 PART
Temp. Occ. Cert. #4024 issued 6-1-00 to Sav-On Grocery Store.
FIRE-Final Inspection5/30/20005/31/20005/31/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 05/30/2000 at 14:57:13. Contact: ###-####.
FIRE-Final Inspection5/19/20005/22/20005/22/2000AFAIL
DetailsRick Jackson
###-#### C/N issued 5/23/00 2:19:13 PM
BLD-Other5/9/20005/10/20005/10/2000APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 05/09/2000 at 15:38:01. Contact: ###-####. Conf. on final. 5/11/00 11:54:25 AM
BLD-Conference4/17/20004/17/20004/17/2000PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/17/2000 at 09:33:28. Contact: ###-####. Mechanical inspector will be out of this. 4/18/00 10:50:46 AM
BLD-Other4/13/20004/14/20004/14/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/13/2000 at 10:03:58. Contact: ###-####. Grid ok west side 4/14/00 1:51:27 PM
FIRE-Sprinkler Rough-in4/13/20004/14/20004/14/2000APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/13/2000 at 10:04:44. Contact: ###-####. Heads/drops missing by pharmacy; ok to cover sales area 4/17/00 1:51:41 PM
FIRE-Sprinkler Rough-in4/3/20004/4/20004/4/2000APART
DetailsRick Jackson
okay to cover main sales areaeast side
BLD-Other3/28/20003/29/20003/29/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/28/2000 at 08:19:43. Contact: ###-####. Went out could not find general contractor on site. 3/29/00 2:12:55 PM
FIRE-Conference3/22/20003/23/20003/23/2000APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/22/2000 at 11:59:40. Contact: ###-####. When to have sprinkler R/I 3/27/00 9:56:57 AM
BLD-Framing/Rough-in3/7/20003/7/20003/7/2000PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/07/2000 at 08:52:33. Contact: ###-####. Right front areas ok to sheetrock. 3/8/00 10:36:51 AM
BLD-Framing/Rough-in2/23/20002/24/20002/24/2000PPART
DetailsRuss Owen
rear office space left side ok to cover. 2/28/00 9:01:58 AM
BLD-Framing/Rough-in2/3/20002/4/20002/4/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/03/2000 at 07:59:49. Contact: ###-####. Partial roof nailing inspection. 2/4/00 2:02:38 PM
BLD-Foundation2/3/20002/3/20002/3/2000PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/03/2000 at 07:58:15. Contact: ###-####. Special insp. req. 2/4/00 2:06:52 PM
BLD-Foundation1/26/20001/26/20001/26/2000PPASS
DetailsWes Worcester
Scheduled by a contractor via Hello! on 01/26/2000 at 08:24:41. Contact: ###-####. Pier's ok- special inspector on site. 2/7/00 8:35:14 AM
BLD-Foundation1/21/20001/24/20001/24/2000APART
DetailsWes Worcester
Scheduled by a contractor via Hello! on 01/21/2000 at 07:05:21. Contact: ###-####. Special inspectin on site. 1/25/00 1:31:01 PM
BLD-Footing1/21/20001/21/20001/21/2000APASS
DetailsWes Worcester
Scheduled by a contractor via Hello! on 01/21/2000 at 07:04:38. Contact: ###-####. Special inspector on site- placing dobbies for 3" clearance to earth. 1/25/00 12:10:53 PM
BLD-Footing1/19/20001/20/20001/20/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 01/19/2000 at 15:18:37. Contact: ###-####. Foot ok spec. required. 1/20/00 4:17:13 PM
Routing - PLAN CHECK12/29/199912/29/19991/3/2000 PASS
DetailsRon Hill
Routing - PLAN CHECK12/15/199912/15/19991/3/2000 PASS
DetailsRon Hill
Plan Reviewer's activity  1/3/2000 PASS
DetailsRon Hill
RECEIVED OUTSIDE ENGINEERING COMMENTS, NO CORRECTIONS REQUIRED.
Case Summary (BLD)  1/3/2000 PASS
DetailsRon Hill
PLANS/APPL TAKEN TO FRONT DESK  1/3/2000 PASS
DetailsRon Hill
Print Occupancy Form  1/3/2000 DONE
Inspection Record Card- Bld  1/3/2000 DONE
Issue PAID IN FULL permit  1/3/2000 DONE
Plan assigned to (R_H)11/15/1999 1/3/2000 PASS
Details
1/3/2000 09:04:01 RMH - activity updated through activity BLDA022 from case BLD99-03310.
Routing - PLAN CHECK12/2/1999 1/3/2000 PASS
DetailsRon Hill
Routing - FIRE12/30/199912/30/199912/30/1999 PASS
DetailsBill Alexander
APPROVED BY DAVE MILLER
Routing - PLANNING11/16/1999 12/29/1999 PASS
Revised 12/28, approved as per Cup -00128 TAC and approved per DRH99-00226 by MGS.
Routing Off Site - STRUCTURAL12/21/1999 12/23/1999  
DetailsRon Hill
CONTACTED PDQ TO TAKE REVISED PLANS TO OUTSIDE ENG. KMM
Plan resubmittals received  12/23/1999 DONE
RECEIVED PLAN RESUBMITTALS FROM CSHQA ARCHITECTS, JOHN IRVINE, FORWARDED SAME TO RON HILL.. 12/23/99 DAR
RECEIVED PLAN RESUBMITTALS (SECOND SET)FROM CSHQA ARCHITECTS
SHEET1.1 FROWARDED SAME TO RON HILL. DAR 12/23/99
Plan resubmittals received  12/20/1999 DONE
RECEIVED PLAN RESUBMITTALS FROM CSHQA, JOHN IRVINE , A SHEETS AND A LETTER ADDRESSING THE STRUCTURAL COMMENTS, FORWARDED SAME TO RON HILL. 12/21/99 DAR
Routing - FIRE12/14/199912/15/199912/15/1999 FAIL
Lacks F.D. access around the loading dock meeting UFC minimum requirments. Questioned F.D. access maximum 40 feet due to limitation of access to existing riser location from drive.
Plan Review Completed(1st rev)  12/15/1999 FAIL
Plan Reviewer's activity  12/13/1999 FAIL
DetailsRon Hill
Faxed and mailed requirements to the architect. Will route to fire for review.
Plan resubmittals received  12/6/1999 DONE
RECEIVED TWO COPIES OF REVISED SHEETS 1.0, 1.1, 1.3, 1.4, 1.5, 1.6, 1.11, 1.12, 2.1A, FROM CSHQA. ONE COPY OF COVER LETTER. ROUTED TO RON H. KMM
Received Certificate of Value  12/2/1999 DONE
RECEIVED CERT. OF VALUE FOR THE DEMO WORK. ROUTED TO RON HILL. KMM
Routing - PLUMBING11/23/1999 12/2/1999 DONE
Plan Reviewer's activity  11/29/1999 FAIL
DetailsRon Hill
Mailed strctural plan check requirments to Kent Hanway at CHSQA 11-29-99.
Routing Off Site - STRUCTURAL11/4/1999 11/19/1999 PEND
PLANS SENT TO STRUCTUAL ENGINEERING CONSULANT VIA PDQ. 11/3/99 DAR
Additional plans submitted  11/18/1999 PEND
RECEIVED AN ADDENDUM FROM CSHQA, FORWARDED SAME TO RON HILL. 11/18/99 DAR
Routing - PUBLIC WORKS11/15/1999 11/16/1999 PASS
Plan routing begun/TENANTS  11/15/1999 DONE
Route to PUBLIC WORKS, PLANNING, PLUMBING, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  11/4/1999 DONE
RECEIVED ITEMS REQUESTED. KMM
Received Certificate of Value  11/3/1999 DONE
Additional plans submitted  11/3/1999 PEND
THREE SETS OF CIVIL PLANS SUBMITTED BY CSHQA, PLANS FORWARDED TO MARLENE SOUTHARD
Plans ACCEPTED BY PLAN TECH  11/3/1999 FAIL
REQUIRES THREE COPIES OF GRADING AND DRAINAGE PLANS. SHEETS 1.2, 3.4B, 3.5, 3.6 AND 3.11 NEED TO BE STAMPED AND SIGNED. CONTACTED JOHN IRVING ABOUT THESE ITEMS. KMM
Application received  11/2/1999  
Recd Pcfee & Taken To Pln CK     
Case Summary (BLD)