Fee Review-notes | 6/12/2003 | 6/12/2003 | 6/12/2003 | | DONE |
|
|
|
|
Permanent Occupancy | | 10/15/2001 | 10/15/2001 | | DONE |
|
|
|
|
BLD-Final | 10/12/2001 | 10/15/2001 | 10/15/2001 | P | PASS |
Steven Webb
|
|
|
Final affidavit letter from MTI was provided plus fire caulking in mechanical is ok--. 10/15/2001 2:50:11 PM
|
Permanent occupancy | | | 10/15/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8869 issued 10-15-01 to Trail Wind Elementary School (addn.)
|
FIRE-Final Inspection | 8/29/2001 | 8/29/2001 | 8/29/2001 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 8/29/2001 9:24:22 AM
|
Telephone call | | | 6/25/2001 | | DONE |
|
|
|
Talked w/Steve Maber ###-#### x117 re: status on temp. occ. & he will follow up
|
Fee Review-notes | 8/8/2000 | 8/8/2000 | 10/24/2000 | | DONE |
|
|
|
|
BLD-Final | 8/17/2000 | 8/18/2000 | 8/18/2000 | A | PART |
Russ Owen
|
|
|
Jim ###-#### Need final inspections reports mti/ engineer, also fire caulk upper mec room 2 hr wall. other signatures req. job crd. 8/18/2000 1:14:43 PM
|
Temporary occupancy | | | 8/18/2000 | | PART |
|
|
|
Temp. Occ. Cert. #4053 issued 8-18-00 to Trail Wind Elementary School.
|
FIRE-Final Inspection | 8/15/2000 | 8/16/2000 | 8/16/2000 | A | PART |
Rick Jackson
|
|
|
Jim ###-#### Fire sprinkler this is for a temp please call before going out///// temp occupancy approved - sprinkler system must be converted to dry system by 8/30/00 per letter from the acrchitect and Dave Miller approval 8/16/2000 2:05:36 PM
|
FIRE-Alarm Testing | 8/14/2000 | 8/14/2000 | 8/14/2000 | P | PASS |
Rick Jackson
|
|
|
###-####--JIM ALARM TEST alarms working per plans 8/15/2000 11:15:13 AM
|
Code Occupancy Approval | | | 8/14/2000 | | PASS |
|
|
|
LOOKS OK FINAL SIGNED OFF.
|
FIRE-Alarm Testing | 8/8/2000 | 8/8/2000 | 8/8/2000 | P | FAIL |
Rick Jackson
|
|
|
Jim ###-#### tested the alarms: batteries need to be 55 amp; trouble on NACs activate the alarms; complete the wiring/horns in attice; F/S dampers not tested - not accessible; need exit sign; 2 hr and 1 hr wall penetrations 8/9/2000 8:40:30 AM
|
BLD-Framing/Rough-in | 7/28/2000 | 7/31/2000 | 7/31/2000 | A | PASS |
Russ Owen
|
|
|
JIM ###-#### CEILING GRID 7/31/2000 12:51:16 PM
|
BLD-Framing/Rough-in | 7/11/2000 | 7/12/2000 | 7/12/2000 | P | PASS |
Russ Owen
|
|
|
ceiling grid Jim ###-####
|
BLD-Framing/Rough-in | 7/10/2000 | 7/11/2000 | 7/11/2000 | A | CANC |
Russ Owen
|
|
|
ceiling grid jim ###-####
|
BLD-Framing/Rough-in | 7/5/2000 | 7/5/2000 | 7/5/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### fire wall Fresh air not permitted in parapet 7/7/00 12:57:56 PM
|
BLD-Framing/Rough-in | 6/29/2000 | 6/30/2000 | 6/30/2000 | A | FAIL |
Russ Owen
|
|
|
firewall jim ###-#### penetrations 6/30/00 3:21:48 PM
|
BLD-Framing/Rough-in | 6/23/2000 | 6/26/2000 | 6/26/2000 | A | FAIL |
Russ Owen
|
|
|
jim ###-#### cover C/N posted 6/26/00 2:59:47 PM
|
BLD-Framing/Rough-in | 6/8/2000 | 6/9/2000 | 6/9/2000 | A | PART |
Russ Owen
|
|
|
jim ###-#### engineer to examine trusses and inside tails. 6/13/00 10:00:10 AM
|
BLD-Foundation | 5/16/2000 | 5/17/2000 | 5/17/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### Spec. insp. on site. 5/17/00 2:07:15 PM
|
BLD-Concrete | 5/15/2000 | 5/15/2000 | 5/15/2000 | P | PART |
Russ Owen
|
|
|
SPECIAL INSPECTION\\###-#### DOUG Subject to special inspection. 5/16/00 10:44:36 AM
|
BLD-Foundation | 3/16/2000 | 3/17/2000 | 3/17/2000 | A | PASS |
Wes Worcester
|
|
|
late am ###-#### or ###-#### pager Doug Stem walls ok 3/20/00 10:23:07 AM
|
BLD-Foundation | 3/15/2000 | 3/16/2000 | 3/16/2000 | A | FAIL |
Carl Dependahl
|
|
|
LATE AM PLEASE\\###-####\\###-#### Rained out? recall. 3/17/00 10:28:09 AM
|
BLD-Footing | 3/14/2000 | 3/15/2000 | 3/15/2000 | A | NR |
Russ Owen
|
|
|
336/4082 or ###-####
|
BLD-Foundation | 3/14/2000 | 3/15/2000 | 3/15/2000 | A | NR |
Russ Owen
|
|
|
###-####
|
BLD-Footing | 3/13/2000 | 3/14/2000 | 3/14/2000 | P | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 16:26:27. Contact: ###-####. East elevation done & south elevation ok from 85 to 120 on Gride 5.6 than Grid C from 4.6 to 5.6 3/16/00 11:25:33 AM
|
BLD-Footing | 3/10/2000 | 3/13/2000 | 3/13/2000 | P | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 03/10/2000 at 13:56:57. Contact: . 85' + 20' @ vesitbule ok. 3/14/00 1:44:44 PM
|
Routing Off Site - A.C.H.D | 2/16/2000 | 2/16/2000 | 2/16/2000 | | DONE |
|
|
|
no impact fee due 1-26-00 plans stamped David Szpilett from ACHD
|
Issue PAID IN FULL permit | | | 2/16/2000 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 11/29/1999 | | 2/1/2000 | | DONE |
Mike Otto
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/1/2000 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 2/1/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/1/2000 | | DONE |
|
|
|
|
Telephone call | | | 2/1/2000 | | DONE |
|
|
|
left mess for tarrie that permit is ready
|
Routing - PLAN CHECK | 1/28/2000 | | 1/31/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/27/2000 | | 1/28/2000 | | DONE |
|
|
|
|
Routing - FIRE | 1/21/2000 | 1/21/2000 | 1/26/2000 | | PASS |
|
|
|
PLANS SENT BACK TO PLAN CHECK
|
Routing - PLAN CHECK | 1/18/2000 | | 1/20/2000 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
|
Plan resubmittals requested | | | 1/20/2000 | | FAIL |
|
|
|
BUILDING CODE CORRECTIONS
|
Routing Off Site - STRUCTURAL | 1/12/2000 | | 1/18/2000 | | PASS |
|
|
|
SENT RESUBMITTALS TO CONSULTANTING ENGINEER VIA PDQ. 1/12/00 DAR
|
Plan resubmittals received | | | 1/18/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM TARRIE WAGNER OF ARMSTRONG ARCHITECTS AT 3:54 0N 1/14/00 LOGGED IN THESE PLANS AS RECEIVED ON 1/18/00 BECAUSE OF TIME RECEIVED AND AND HOLIDAY ON THE FOLLOWING MONDAY. PLANS RECEIVED CONSISTED OF PPLAN REVIEW COMMENTS/CORRECTIONSFOR ARCHITECTURAL, ELECTRICAL, AND MECHANICAL, FORWARDED SAME TO MIKE OTTO. 1/18/00 DAR
|
Plan resubmittals received | | | 1/12/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEET S2.0, ONE COPY OF SUPPLEMENTAL STRUCTURAL CALCULATIONS. ROUTED TO MIKE O. KMM
|
Routing - FIRE | 12/2/1999 | 12/6/1999 | 12/6/1999 | | FAIL |
|
|
|
WATER SUPPLY INFORMATION REQUIRED FOR FIRE SPRINKLER SYSTEM.
11/23/99 PUBLIC WORKS IS READY FOR THE PLANS TO REREVIEW THEM. WHEN THE FIRE DEPARTMENT HAS REVIEWED THEM PW WAS READY FOR THEM ON 11/15/99. DAR
|
Plan Review Completed(1st rev) | | | 12/6/1999 | | PEND |
|
|
|
plans sent back to plan check
|
Plan resubmittals requested | | | 12/3/1999 | | FAIL |
|
|
|
STRUCTURAL CORRECTIONS FAXED TO ARCHITECT. MLO
|
Routing Off Site - STRUCTURAL | 11/9/1999 | | 12/3/1999 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
RECEIVED STRUCTUAL REVIEW LETTER BY CH2MHILL DATED 12/2/99. ROUTED TO MIKE OTTO. KMM
|
Plan resubmittals requested | | | 12/2/1999 | | FAIL |
|
|
|
PLAN REVIEW CORRECTIONS
|
Routing - PLAN CHECK | 11/29/1999 | | 12/2/1999 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
|
Routing - PLANNING | 11/23/1999 | | 11/24/1999 | | DONE |
|
|
|
|
Routing - PLUMBING | 11/10/1999 | | 11/23/1999 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 11/8/1999 | 11/8/1999 | 11/10/1999 | | PEND |
|
|
|
REQUIRES DRAINAGE PLAN PER BRIAN MURPHY. 11/10/99 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 11/9/1999 | | DONE |
|
|
|
RECEIVED THRID SET OF PLANS. SOILS REPORT IS IN PROJECT MANUEL. KMM
|
Case Summary (BLD) | | | 11/8/1999 | | PEND |
|
|
|
|
Application received | | | 11/8/1999 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/8/1999 | | PEND |
|
|
|
REQUIRES 3RD SET OF PLANS FOR ENGINEER. REQUIRES SOILS REPORT. 2000 LBS USED FOR SOIL BEARING PRESSURE. SCOTT SPJUTE STATED THAT A ZONING CERTIFICATE IS REQUIRED FOR THIS PROJECT. 11/8/99 DAR
|