Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-03421
StatusFinaled
Name TRIUMPHANT KIDS ORGANIZATION
Site Address 523 W BROAD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To convert a 7,124 sq.ft. warehouse/retail building into two separate buildings by using an existing 10" CMU wall as a two hour Area Separation wall. Building #1 to be used as a youth center of 3,915 s.f. for a dance hall, snack bar, band platform & restrooms. This is an "A-3 Occupancy", Occupant Load of 299 Maximum. Building #2 has 3,209 s.f. and will be used as professional services & offices for counseling & assisting youth meet life's challenges with accessory use areas. This building is a "B" occupancy. Work to include construction of two, new, accessible restrooms; accessible new entrance; accessible snack bar area; accessible area of refuge at required second exit & band platform for Building #1 Building #2 will basically continue as currently existing, only upgrades being to provide accessible route from exterior to interior spaces with signage at exterior to direct persons to accessible entrance and on interior at non-accessible restrooms directing persons to location of accessible restrooms. All per approved plans notes and attached plan review comments. INDIVIDUAL CERTIFICATE OF OCCUPANCY REQUIRED FOR EACH BUILDING TENANT SPACE. NOTE: Planning approval by Scott Spjute with no requirements. (P.C.#904-99)/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/4/2005  
Fee Review-notes6/11/20036/11/20036/11/2003 DONE
Additional values from subcontractors.
Fee Review-notes11/17/199911/17/19997/24/2000 DONE
Permanent occupancy  7/11/2000 DONE
Perm. Occ. Cert. #8285 issued 7-11-00 to the Triumphant Kids Organization.
Permanent Occupancy 7/5/20007/5/2000 DONE
Details
FIRE-Final Inspection6/29/20006/29/20006/29/2000PPASS
DetailsRick Jackson
Office area to remain a B occupancy. Not to be used for game room, etc.
BLD-Final6/29/20006/29/20006/29/2000PPASS
Details
###-#### all assy equip has been removed and panic hardware has been installed 6/30/00 10:07:56 AM
BLD-Final6/20/20006/21/20006/21/2000AFAIL
Details
###-#### must resubmit for change of occupancy for the b area as it now should be classed as an A because f he pol tables , air hocky tables and video acde tpe games in the main area, 409 and myself have spoken to the owners rep and he is confirring with an architect atthis time, written request for an extension of the temp occ is required. 6/21/00 10:10:04 PM
BLD-Final6/16/20006/20/20006/20/2000AFAIL
Details
###-#### dave other agencies not approved 6/20/00 10:18:39 AM
FIRE-Final Inspection6/20/20006/20/20006/20/2000PFAIL
DetailsRick Jackson
structural is also going out pm dave ###-#### occupancy has changed from "B" to "A" architect to resubmit plans 6/27/00 2:54:57 PM
BLD-Final3/28/20003/29/20003/28/2000APART
Details
signed the temp col 03/28/2000
BLD-Final3/27/20003/28/20003/28/2000APART
Details
###-#### signed the temp col 03/28/2000
FIRE-Final Inspection3/27/20003/28/20003/28/2000APART
DetailsRick Jackson
###-#### Dance floor area only; inst. approved to occupy west of 2 hr wall. 3/30/00 10:46:50 AM
Temporary occupancy  3/28/2000 PART
Temp. Occ. Cert. #3999 issued 3-28-00 to Triumphant Kids Organization.
BLD-Framing/Rough-in3/17/20003/17/20003/17/2000PFAIL
DetailsJim Storey
###-####
BLD-Framing/Rough-in3/9/20003/10/20003/10/2000APART
Details
made ok to cover new entry wall
FIRE-Conference3/9/20003/10/20003/10/2000APART
DetailsRick Jackson
###-#### dan call first Requiremtents for final inspection/ occupancy; reviewed plan notes with owner. 3/14/00 11:31:20 AM
BLD-Framing/Rough-in3/9/20003/9/20003/9/2000PFAIL
Details
cancelled by the contractor
BLD-Framing/Rough-in2/8/20002/8/20002/8/2000PFAIL
Details
late pm Daryl ###-#### need code complying stairs, rails, need plmg signoff, must make stage framing accessable for inspection need guard rail at added drummer stage 2/10/00 10:06:37 AM
Issue PAID IN FULL permit  1/3/2000 DONE
Print Occupancy Form  12/17/1999 DONE
Inspection Record Card- Bld  12/17/1999 DONE
Telephone call  12/17/1999 DONE
called tenants contact, left message permit ready and fees due.
Routing - FIRE12/15/199912/16/199912/16/1999 PASS
Routing - PLAN CHECK12/16/1999 12/16/1999 PASS
APPROVED AS NOTED ON APPROVED PLANS AND ATTACHED PLAN REVIEW COMMENTS. ROUTING TO PERMIT DESK FOR ISSUANCE.
Plan Review Completed(1st rev)  12/16/1999  
PLANS/APPL TAKEN TO FRONT DESK  12/16/1999 PASS
ROUTING TO PERMIT DESK FOR ISSUANCE.
Plan assigned to (DRS)11/23/1999 12/16/1999 PASS
DetailsDan Stuart
12/16/1999 16:41:27 DRS - activity updated through activity BLDA022 from case BLD99-03421.
Routing - PLAN CHECK12/7/199912/7/199912/14/1999 PEND
INSERTED NEW PLAN SUBMITTAL & ENGINEERING SHOWING BAND PLATFORM CONSTRUCTION. PLAN SUBMITTALS PROVIDE NEW EVALUATION OF DANCE HALL AREA AND OCCUPANCY GROUP WAS CHANGED FROM A-2.1 TO A-3 AND CONSTRUCTION TYPE REQUIREMENTS FROM V-1 HOUR TO V-N. PLANS APPROVED PER NOTES AND ATTACHED PLAN REVIEW COMMENTS.
COPY OF PLAN REVIEW COMMENTS FAXED to Pete Rockwell in care of Dan Fontenot SINCE pET DOES NOT INDICAT A FAX NUMBER ON APPLICATION AND MAILED COPY TO ARCHITECT. I ALSO USED eMAILED A COPY OF THE PLAN REVIEW TO rockwel@cyberhighway.net. SUBMITTAL OF AREA OF REFUGE FOR TWO WHEEL CHAIRS AT SECOND REQUIRED EXIT TO BE PRESENTED TO STRUCTURAL INSPECTOR IN FIELD.
ROUTING TO FIRE CODE ANALYST FOR REVIEW & COMMENTS.
Routing - PLUMBING12/3/1999 12/7/1999 DONE
Routing - PUBLIC WORKS12/1/1999 12/3/1999 DONE
Plan resubmittals received  12/2/1999 DONE
RECEIVED TWO COPIES OF REVISED SHEET A-1 OF 1 AND TWO COPIES OF FRAMING PLAN CALCS. ROUTED TO DAN S. KMM
Routing Off Site - C.D.H11/23/1999 12/1/1999 DONE
Carol Johnson took plans to Central District Health for review. 11/23/99 DAR
Plans returned to Dave Radford's desk at approximately 3;00PM by an unknown person from outside of city hall. 12/1/99 dar
Routing - PLANNING12/1/1999 12/1/1999 DONE
Application received  12/1/1999 DONE
Pending Assignment by MYS11/17/1999 11/23/1999 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  11/23/1999 DONE
Route to CENTRAL DISTRICT HEALTH, PLANNING, PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  11/18/1999  
Case Summary (BLD)