BLD-Final | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PASS |
Steven Webb
|
|
|
fn occ-- rick ###-####: issued l/c. Received eng. on cut out TJI.10/27/2000 10:36:02 AM 10/27/2000 10:36:28 AM
|
BLD-Grading Inspection | 10/26/2000 | 10/26/2000 | 10/26/2000 | | PASS |
Rita DeYoung
|
|
|
Grading completed according to approved plan
|
BLD-Energy code compliance | 7/27/2000 | 7/28/2000 | 7/28/2000 | A | PASS |
Tony Young
|
|
|
RICK ###-#### ENERGY CODE
|
BLD-Framing/Rough-in | 7/26/2000 | 7/27/2000 | 7/27/2000 | A | PASS |
Tony Young
|
|
|
###-#### Ok to insulate 7/27/00 1:59:54 PM
|
BLD-Framing/Rough-in | 7/25/2000 | 7/26/2000 | 7/26/2000 | A | FAIL |
Tony Young
|
|
|
Rick, ###-#### - reinspect C/N. (trusses- straps) need energy codr. 7/26/00 1:15:11 PM
|
BLD-Framing/Rough-in | 7/25/2000 | 7/25/2000 | 7/25/2000 | P | PART |
Tony Young
|
|
|
###-#### C/N left- recall for more time. 7/26/00 10:38:59 AM
|
BLD-Wall cover | 7/17/2000 | 7/18/2000 | 7/18/2000 | A | PART |
Tony Young
|
|
|
John, ###-#### Outside shear inspection- all ok except by front door. 7/18/00 2:27:54 PM
|
BLD-Wall cover | 7/14/2000 | 7/17/2000 | 7/17/2000 | P | CANC |
Tony Young
|
|
|
John, ###-#### - shear walls - 1st thing if possible - cancelled by contractor
|
BLD-Wall cover | 7/6/2000 | 7/6/2000 | 7/6/2000 | P | FAIL |
Tony Young
|
|
|
John, ###-#### - before 3:00 if possible Need engineering straps 7/7/00 1:34:24 PM
|
BLD-Foundation | 5/18/2000 | 5/18/2000 | 5/18/2000 | P | PART |
Tom Arcoraci
|
|
|
###-#### Garage wall 5/22/00 9:13:51 AM
|
BLD-Footing | 5/15/2000 | 5/16/2000 | 5/16/2000 | A | PART |
Tom Arcoraci
|
|
|
jay ###-#### ft Garage FT ok 5/17/00 1:46:38 PM
|
BLD-Footing | 5/12/2000 | 5/12/2000 | 5/12/2000 | P | CANC |
Tom Arcoraci
|
|
|
###-#### By contractor. 5/15/00 10:56:10 AM
|
BLD-Foundation | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | FAIL |
|
|
|
pouredw/o insp hillside no plansno one on site 5/4/00 5:37:13 PM
|
BLD-Concrete | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 5/4/00 wall rebar perplan
|
BLD-Footing | 4/28/2000 | 4/28/2000 | 4/28/2000 | P | PASS |
Jim Storey
|
|
|
ft---jay ###-#### ft ok 4/28/00 3:27:08 PM
|
Issue PAID IN FULL permit | | | 3/17/2000 | | DONE |
|
|
|
|
Telephone call | | | 1/28/2000 | | DONE |
|
|
|
left message gave dollar amount told him that we would be voiding plans if we didn't get a call back from him.
1/28/00-roger called back will send wife to pick up plans today or will for sure pick them up by thursday or we will void plans on friday 2/4/00
|
Meeting | | | 1/28/2000 | | DONE |
|
|
|
Bonnie Brazier ###-#### they will call and come pick up the permit when they have decided upon a builder which will be soon. Will be in next week to pick up the permit for sure. I called her to verify
|
Inspection Record Card- Bld | | | 1/5/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/5/2000 | | DONE |
|
|
|
|
Telephone call | | | 1/5/2000 | | DONE |
|
|
|
left mess for roger brazier --that plans are ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/4/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 12/14/1999 | 12/14/1999 | 12/14/1999 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 12/13/1999 | 12/13/1999 | 12/14/1999 | | DONE |
|
|
|
|
Office Staff conference/action | | | 12/13/1999 | | DONE |
|
|
|
recorded ros 4826
|
Routing - PUBLIC WORKS GRADING | 11/17/1999 | 11/17/1999 | 11/22/1999 | | PASS |
Rita DeYoung
|
|
|
took to terry records 11/17/99
Approved as Category 3.
|
Application received | | | 11/17/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 12/14/1999 | 12/14/1999 | | | PEND |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Plan Reviewer's activity | | | | | |
|
|
|
all lateral developed using pahd42 holdowns that do not appear to be adequate. called engineer 12/21/99. was to review calculations and get back with changes.
I, Steve, talk to engineer on 1/4/00 about hold-downs. He was okay with his calcs.
|
Pending Assignment by DJO | 11/17/1999 | | | | PEND |
Dan Overy
|
|
|
|