Fee Review-notes | 11/18/1999 | | 5/9/2000 | | DONE |
|
|
|
additional values from subs
|
Permanent Occupancy | | 2/18/2000 | 2/18/2000 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 2/18/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8143 issued 2-18-00 to Things Remembered at Boise Towne Square.
|
FIRE-Final Inspection | 2/16/2000 | 2/17/2000 | 2/17/2000 | A | PASS |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 02/16/2000 at 11:36:26. Contact: ###-####. Final ok for permanant occupancy. 2/17/00 2:15:50 PM
|
BLD-Final | 2/16/2000 | 2/17/2000 | 2/17/2000 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/16/2000 at 11:37:10. Contact: ###-####.
|
(F) Reprint permit | | | 2/16/2000 | | DONE |
|
|
|
|
BLD-Other | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 13:59:08. Contact: ###-####. Ok to place tiles. 2/14/00 12:06:15 PM
|
FIRE-Sprinkler Rough-in | 2/7/2000 | 2/7/2000 | 2/7/2000 | P | PART |
Joe Tawney
|
|
|
terry ###-#### reinspection okay for sprinklerR/I
|
BLD-Framing/Rough-in | 2/2/2000 | 2/3/2000 | 2/3/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/02/2000 at 08:35:06. Contact: ###-####. Ok to cover storefront. C/N on ceiling check @ final. 2/4/00 11:50:36 AM
|
FIRE-Sprinkler Rough-in | 2/3/2000 | 2/3/2000 | 2/3/2000 | P | PART |
Joe Tawney
|
|
|
terry ###-#### Ok on smoke evac alarm test fail on sprinkler R/I possible overspacing. 2/4/00 1:15:55 PM
|
BLD-Conference | 2/2/2000 | 2/2/2000 | 2/2/2000 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/02/2000 at 08:33:27. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/21/2000 | 1/24/2000 | 1/24/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 10:42:01. Contact: ###-####.
|
BLD-Wall cover | 1/21/2000 | 1/24/2000 | 1/24/2000 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 10:43:47. Contact: ###-####. complete storfront recall 1/31/00 9:02:19 AM
|
Routing - PLAN CHECK | 12/29/1999 | 12/29/1999 | 1/21/2000 | | PASS |
Ron Hill
|
|
|
|
Plan assigned to (R_H) | 11/30/1999 | | 1/21/2000 | | PASS |
|
|
|
1/21/2000 08:10:23 RMH - activity updated through activity BLDA022 from case BLD99-03435.
|
Plan Reviewer's activity | | | 1/21/2000 | | PASS |
Ron Hill
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/21/2000 | | PASS |
Ron Hill
|
|
|
|
Print Occupancy Form | | | 1/21/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/21/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/21/2000 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/20/2000 | | DONE |
|
|
|
RECEIVED FOUR SETS OF DRAWINGS, DETAILS, CALCS. PREPARED FOR STORE FRONT @ THINGS REMEMBERED. ROUTED TO RON HILL KMM
|
Plan resubmittals received | | | 1/12/2000 | | DONE |
|
|
|
RECEIVED FOURSETS OF DRAWINGS, DETAILS, CACULATIONS FOR THE STORE FRONT FROM MAVERICK ENGINEERING, FORWARDED SAME TO RON HILL. 1/12/00 DAR
|
Plan Reviewer's activity | | | 1/12/2000 | | FAIL |
Ron Hill
|
|
|
Received engineering. Missing details, called and talked with engineer about requirements on 1-12-00, and 1-13-00,
|
Plan resubmittals received | | | 1/5/2000 | | DONE |
|
|
|
RECEIVED FOUR COPIES OF REVISED SHEETS C1, C2, D1, A1, A2, A3, A4, A5, A6, F1, F2, M-1, E-1, E-2. ROUTED TO RON HILL. KMM
|
Routing - FIRE | 12/20/1999 | 12/28/1999 | 12/28/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 12/28/1999 | | FAIL |
Ron Hill
|
|
|
TALKED TO ARCHITECT ON PHONE DAN, FAXED HIM THE REQUIREMENTS THAT I HAD SENT PREVIOUSLY TO CORTLAND MORGAN, FAXED AT 10:30 TO ###-####
|
Plan Review Completed(1st rev) | | | 12/28/1999 | | |
|
|
|
|
Plan Reviewer's activity | | | 12/20/1999 | | FAIL |
Ron Hill
|
|
|
Mailed requirements to Architect. NO Fax number was provided. Will route to the fire devision for review.
|
Routing - PLAN CHECK | 12/1/1999 | | 12/20/1999 | | FAIL |
Ron Hill
|
|
|
Route to fire devision for review. Mailed requirements to the architect
|
Routing - PUBLIC WORKS | 11/30/1999 | | 12/1/1999 | | DONE |
|
|
|
|
Pending Assignment by MYS | 11/18/1999 | | 11/30/1999 | | DONE |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 11/30/1999 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
|
Plans ACCEPTED BY PLAN CHECK | | | 11/26/1999 | | PASS |
|
|
|
RECEIVED PLANS BACK FROM JEFF SMITH. BID SET BLOCKED OUT. ROUTED TO MARLENE. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 11/22/1999 | | FAIL |
|
|
|
PLANS STAMPED BID SET. CONTACTED ARCH. CORTLAND MORGAN ###-#### AND RYAN BAUER ###-####, OF STATES PERMITS, THAT THESE PLANS ARE NOT ACCEPTABLE. I SUGGESTED WE FED EX BACK TO CORTLAND AND HAVE HIM BLOCK OUT INITIAL AND DATE. THEN FED EX PLANS BACK TO US. WILL PUT IN HOLD BOX UNTIL I HEAR FROM EITHER GENTLEMAN. KMM
11-22-99 PM FED EXED PLANS TO JEFF SMITH OF CORTLAND MORGAN. KMM
|
Telephone call | | | 11/22/1999 | | DONE |
|
|
|
RECEIVED TELEPHONE CALL FROM JEFF SMITH OF CORTLAND MORGAN ARCH. I WILL FED EX TO JEFF 11-22-99.
|
Application received | | | 11/18/1999 | | |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
Ron Hill
|
|
|
Received resubmitted archtectual plans, arcitect noted that structural plans were to follow.
|