BLD-Final | 4/28/2000 | 4/28/2000 | 4/28/2000 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Final | 4/26/2000 | 4/27/2000 | 4/27/2000 | A | FAIL |
Jim Storey
|
|
|
###-####-MATT FN supply boots need insulated and trap arm chalked at warm walls. 4/27/00 11:12:30 AM
|
BLD-Final | 4/19/2000 | 4/19/2000 | 4/19/2000 | P | NR |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/7/2000 | 2/7/2000 | 2/7/2000 | A | PASS |
Alan Hauser
|
|
|
Corrections completed.
|
BLD-Framing/Rough-in | 2/3/2000 | 2/4/2000 | 2/4/2000 | A | FAIL |
Tom Arcoraci
|
|
|
matt ###-#### No plans onsite. 2/4/00 11:56:49 AM
|
BLD-Framing/Rough-in | 2/4/2000 | 2/4/2000 | 2/4/2000 | P | FAIL |
|
|
|
matt reinsp ###-#### ok to insulate only overbored studs in the master bath ext bearing wall; out of plumb center bearing wall in the crawl space; need insulation work in the perimeter foundation wall combustables 2/8/00 8:21:47 AM
|
BLD-Framing/Rough-in | 1/27/2000 | 1/28/2000 | 1/28/2000 | P | PASS |
Russ Owen
|
|
|
sheer panel ###-#### Matt please call him before you go out
|
BLD-Foundation | 12/22/1999 | 12/23/1999 | 12/23/1999 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/22/1999 at 17:38:48. Contact: ###-####.
|
BLD-Footing | 12/22/1999 | 12/22/1999 | 12/22/1999 | P | PART |
Russ Owen
|
|
|
Randy ###-####. Exterior boards, up no steel in place at this time, set backs ok.
|
Issue PAID IN FULL permit | | | 12/9/1999 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 11/26/1999 | 11/26/1999 | 12/7/1999 | | PASS |
Dan Overy
|
|
|
12/7/99 15:01:57 DJO - activity updated through activity BLDA022 from case BLD99-03468.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/7/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/7/1999 | | DONE |
|
|
|
|
Telephone call | | | 12/7/1999 | | DONE |
|
|
|
called the JA Holmes and ###-#### permit ready for pick up
|
Plans ACCEPTED BY PLAN CHECK | | | 11/26/1999 | | |
|
|
|
|
Routing - PUBLIC WORKS | 11/22/1999 | 11/22/1999 | 11/23/1999 | | DONE |
|
|
|
|
Routing - PLANNING | 11/22/1999 | 11/22/1999 | 11/22/1999 | | DONE |
|
|
|
dave abo did set backs
|
Application received | | | 11/22/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 11/23/1999 | 11/23/1999 | | | PEND |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Pending Assignment by DJO | 11/22/1999 | | | | PEND |
Dan Overy
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|