BLD-Final | 6/9/2000 | 6/9/2000 | 6/9/2000 | P | PASS |
Russ Owen
|
|
|
###-#### late pm Upper deck guardrail not in place, door key locked from inside. 6/13/00 10:09:52 AM
|
(F) Reprint permit | | | 5/1/2000 | | DONE |
|
|
|
|
BLD-Energy code compliance | 3/2/2000 | 3/2/2000 | 3/2/2000 | P | PASS |
Russ Owen
|
|
|
Jack ###-####
|
BLD-Framing/Rough-in | 2/28/2000 | 2/29/2000 | 2/29/2000 | A | FAIL |
Russ Owen
|
|
|
###-#### C/N posted. 2/29/00 3:16:15 PM
|
BLD-Framing/Rough-in | 2/14/2000 | 2/15/2000 | 2/15/2000 | A | PASS |
Russ Owen
|
|
|
Jack ###-#### shear wall insp Ok to side 2/16/00 2:32:44 PM
|
BLD-Framing/Rough-in | 2/10/2000 | 2/10/2000 | 2/10/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### DOUG \\SHEAR PANEL c/n posted do not cover.
|
BLD-Footing | 12/20/1999 | 12/21/1999 | 12/20/1999 | A | PASS |
|
|
|
###-#### R-bar placed, installing straps.
|
BLD-Footing | 12/16/1999 | 12/17/1999 | 12/17/1999 | A | PASS |
Wes Worcester
|
|
|
clay ###-####-727585
|
BLD-Footing | 12/16/1999 | 12/16/1999 | 12/16/1999 | P | FAIL |
Wes Worcester
|
|
|
clay ###-#### 727585 Rebar not in place.
|
Routing - PLANNING | 12/10/1999 | 12/10/1999 | 12/10/1999 | | DONE |
|
|
|
DEED AND ACCESS EASEMENT RECORDED. AS PER CZC99-00070.DAA
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/10/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/10/1999 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/10/1999 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 12/2/1999 | | 12/10/1999 | | PASS |
Steve Munroe
|
|
|
12/10/1999 13:50:00 SAM - activity updated through activity BLDA022 from case BLD99-03497.
|
Plan assigned to (DJO) | 11/30/1999 | 11/30/1999 | 12/2/1999 | | DONE |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 11/30/1999 | 11/30/1999 | 12/1/1999 | | DONE |
|
|
|
|
Routing - PLANNING | 11/30/1999 | 11/30/1999 | 11/30/1999 | | DONE |
|
|
|
|
Application received | | | 11/30/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 12/10/1999 | 12/10/1999 | | | PEND |
|
|
|
|
Routing - PLAN CHECK | 12/1/1999 | 12/1/1999 | | | PEND |
|
|
|
|
Plan Reviewer's activity | | | | | PASS |
|
|
|
I have taken the plans to Dave Abo.
I tried calling ###-#### and got no answer, so I tried calling ###-#### five times and I only got a busy signal. I will try later today or Monday. I need engineering on entry for lateral and tall wall, and on master bedroom side wall for lateral.
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
(F) Reprint permit | | | | | |
|
|
|
|