Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-03555
StatusFinaled
Name LIKE-NU CAR WASH
Site Address 3003 W STATE ST
Project NameLIKE NU-ADDITION
Customer Number 
ePlanReviewNo
Description
LIKE - NU CAR WASH * REMODEL OF EXSISTING CAR WASH AND ADD APPROXIMATELY 3,509 SQ.FT. OF NEW AREA FOR CONSTRUCTION OF NEW WASH TUNNEL. PERMIT TO INCLUDE DEMOLITION OF 2 EXISTING CAR WASH BAYS AND CONSTRUCT OF A NEW 3,850 SQ.FT. FREE STANDING LIGHTED VACUUM ISLAND, GRADING AND DRAINAGE AS APPROVED BY PUBLIC WORKS . ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. DRH99-00091 C#940-99 MJP *** PLANS MODIFIED AND APPROVED 3/16/00. REMOVED AN ADDITIONAL CAR WASH BAY AND MECHANICAL ROOM TO ADD ADDITIONAL AREA FOR DRYING. RELOCATED MECHANICAL ROOM AS PER APPROVED PLANS DATED 3/16/00.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes12/6/199912/6/19997/24/2000 DONE
call don young for final cert.
BLD-Final7/19/20007/20/20007/20/2000APASS
Details
harvey ###-#### fn occ signed the perm col 7/20/2000 2:30:10 PM
Permanent Occupancy 7/20/20007/20/2000 DONE
Details
Permanent occupancy UNPAID FEE  7/20/2000 DONE
Perm. Occ. Cert. #8300 issued 7-20-00 to Like-nu Car Wash.
BLD-Final7/13/20007/14/20007/14/2000PPART
Details
Scheduled by a contractor via Hello! on 07/13/2000 at 16:07:20. Contact: ###-####. temp occ ok for the wash tunnel and the vac bays only until compressor is taged by u.l. letter on file from owner that power will be terminated in 2-weeks if lable is not on compressor 7/14/2000 4:37:51 PM
Temporary occupancy  7/14/2000 PART
Temp. Occ. Cert. #4039 issued 7-14-00 to Like-Nu Car Wash for the tunnel and vacuum areas only.
FIRE-Final Inspection6/29/20006/30/20006/30/2000APASS
DetailsRick Jackson
steve ###-####
BLD-Framing/Rough-in5/24/20005/24/20005/24/2000PPART
Details
###-#### information on the truss brace changes ok 5/26/00 6:57:54 AM
BLD-Framing/Rough-in5/19/20005/22/20005/22/2000APART
Details
rod ###-#### fr need desgn chang 5/24/00 2:55:57 PM rod ###-#### fr need design changes from arch submitted sealed by arch and engneed desgn chang 5/24/00 2:55:57 PM 5/24/00 2:56:31 PM
FIRE-Supply Line Hydro4/12/20004/13/20004/13/2000AFAIL
DetailsRick Jackson
building not sprinklered - contractor to request plumbing inspection
BLD-Foundation4/4/20004/5/20004/5/2000PPASS
DetailsJim Storey
###-####
BLD-Foundation3/24/20003/27/20003/27/2000APASS
DetailsRuss Owen
###-#### Reinsp. at PM walls at mechanical room 3/28/00 9:14:57 AM
BLD-Footing3/22/20003/23/20003/23/2000APASS
Details
rod ###-#### r-bar placed in the footings 03/23/2000 12:57:14 PM
BLD-Footing3/21/20003/22/20003/22/2000ANR
DetailsRuss Owen
###-#### Need compaction report, need vent's tied up and need approved plans, notified person on site. 3/22/00 1:45:36 PM
BLD-Footing3/20/20003/21/20003/21/2000PCANC
DetailsRuss Owen
###-####
Print Occupancy Form  3/17/2000 DONE
Inspection Record Card- Bld  3/17/2000 DONE
Telephone call  3/17/2000 DONE
talked to terri gave dollar amount
Plan Reviewer's activity  3/16/2000 DONE
PLAN MODIFICATION Waiting for engineer's detail of wide flange beam to existing T.S. beam per detail 3/A3.
Routing - PLAN CHECK3/14/2000 3/16/2000 DONE
PLAN MODIFICATION
BLD-Foundation3/15/20003/16/20003/16/2000APASS
DetailsRuss Owen
rod ###-#### Walls (West) side 3/16/00 2:27:48 PM
Plan Reviewer's activity  3/16/2000 DONE
PLAN MODIFICATION
PLANS/APPL TAKEN TO FRONT DESK  3/16/2000 DONE
PLAN MODIFICATION
Plan assigned to (M_P)3/7/2000 3/16/2000 PASS
DetailsMike Phillips
3/16/2000 16:05:25 M_P - activity updated through activity BLDA022 from case BLD99-03555.
BLD-Foundation3/13/20003/14/20003/14/2000APART
DetailsTom Arcoraci
Rod ###-#### Soils report ok for West footing. 3/14/00 2:01:40 PM
Routing - FIRE3/10/20003/14/20003/14/2000 PASS
DetailsBill Alexander
PLAN MODIFICATION - Re-approved per original review comments
BLD-Foundation3/9/20003/13/20003/13/2000AFAIL
DetailsWes Worcester
Rejected MTI report, need scope of work letter & log in sheet, compaction report required- DO NOT POUR 3/24/00 1:57:13 PM
Routing - PLAN CHECK2/29/2000 3/10/2000  
PLAN MODIFICATION

ROUTING TO FIRE FOR REVIEW OF MODIFICATION.
BLD-Concrete3/7/20003/7/20003/7/2000PPART
DetailsRuss Owen
early pm Rod ###-#### Walls. 3/8/00 10:36:55 AM
BLD-Foundation3/2/20003/3/20003/3/2000AFAIL
DetailsRuss Owen
###-#### rod\\Rebar Need ok for the center pit, not constructed per plan, as shown as Mono Pour. 3/6/00 1:44:58 PM
Routing - PLANNING2/29/2000 2/29/2000 DONE
PLAN MODIFICATION approved per DRH99-91.
Routing - PLUMBING2/25/2000 2/29/2000 DONE
PLAN MODIFICATION
BLD-Concrete2/24/20002/25/20002/25/2000APART
DetailsRuss Owen
###-#### early am Footings, partial on west side. 2/25/00 3:05:24 PM
Routing - PUBLIC WORKS2/23/2000 2/25/2000 PASS
Plans ACCEPTED BY PLAN TECH  2/23/2000 DONE
RECEIVED PLAN MODIFICATION FROM BILL MATTER , ARCHITECT, PROCESSED AND ROUTED PLANS. 2/23/00 DAR
CHANGE STATUS TO (P)  2/22/2000 DONE
plan modification recieved....
BLD-Footing2/16/20002/17/20002/17/2000APART
DetailsRuss Owen
###-#### Footings at carbays and fence on property line, soils ok by engineers compaction report. 2/18/00 3:24:54 PM
BLD-Footing2/15/20002/16/20002/16/2000ACANC
DetailsRuss Owen
rod ###-#### Will recall when ready. 2/16/00 2:34:17 PM
BLD-Conference2/8/20002/8/20002/8/2000PPART
DetailsRuss Owen
Rod ###-#### just need to submit for a permit addemdum to demolish existing mech room.
Plan assigned to (M_P)12/8/199912/8/19992/2/2000 PASS
DetailsMike Phillips
2/2/2000 09:18:27 M_P - activity updated through activity BLDA022 from case BLD99-03555.
Routing - PLAN CHECK1/25/2000 2/2/2000  
Plan Reviewer's activity  2/2/2000 DONE
Print Pending Permit.LaserJet4  2/2/2000 DONE
Case Summary (BLD)  2/2/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/2/2000 DONE
Print Occupancy Form  2/2/2000 DONE
Inspection Record Card- Bld  2/2/2000 DONE
Telephone call  2/2/2000 DONE
talked to cindy gave dollar amount
Issue PAID IN FULL permit  2/2/2000 DONE
CHANGE ISSUED DATE  2/2/2000 DONE
Plan Reviewer's activity  2/1/2000  
Need structural information on existing CMU walls and new column steel.
Plan resubmittals received  1/27/2000 DONE
RECEIVED COPY OF RECORD OF SURVEY NO. 4868 RECORDED BY TEALEY LAND SURVEYING.
Routing - PLUMBING1/24/2000 1/25/2000 PASS
Routing - PUBLIC WORKS1/13/2000 1/24/2000 DONE
Routing - PLAN CHECK1/3/2000 1/13/2000  
Routing to P.W.
Plan resubmittals received  1/13/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM MATTER ARCHITECTS, DETAILS AND ARCHITECTURAL DRAWINGS, FORWARDED SAME TO MIKE PHILLIPS. 1/13/00 DAR
Routing - FIRE12/28/199912/30/199912/30/1999 PASS
Plan Review Completed(1st rev)  12/30/1999  
Routing - PLAN CHECK12/22/1999 12/28/1999  
ROUTING TO FIRE DEPARTMENT.
Plan resubmittals requested  12/28/1999 FAIL
ADDITIONAL INFORMATION REQUESTED FOR FURTHER REVIEW.
Print Pending Permit.LaserJet4  12/28/1999 FAIL
ADDITIONAL INFORMAITON REQUESTED FOR FURTHER REVIEW, ROUTING TO FIRE DEPARTMENT FOR REVIEW.
Routing - PLANNING12/15/1999 12/22/1999 PASS
Approved per DRH99-0091.
Routing - PLUMBING12/9/1999 12/15/1999 FAIL
Routing - PUBLIC WORKS12/7/1999 12/9/1999 FAIL
NEEDS ACHD OK FOR DRAINAGE PER BRIAN MURPHY. 12/9/99 DAR
Plans ACCEPTED BY PLAN TECH  12/7/1999  
Plan assigned to (JCM)12/6/199912/6/199912/6/1999 PASS
DetailsJohn Menard
Application received  12/6/1999  
Plan resubmittals received  1/14/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM BILL MATTERCIVIL DRAWINGS 5 EACH C1, C2, C2A, C3, C4, AND C5; AND 2 EACH OF P1 AND P2. FORWARDED 3SETS OF CIVILS TO BRIAN MURPHY. INCORPORATED 2SETS OF CIVILS AND 2SETS OF PLUMBING PLANS INTO ORIGINAL SETS. 1/14/00 DAR
Recd Pcfee & Taken To Pln CK     
Print Occupancy Form