Fee Review-notes | 12/6/1999 | 12/6/1999 | 7/24/2000 | | DONE |
|
|
|
call don young for final cert.
|
BLD-Final | 7/19/2000 | 7/20/2000 | 7/20/2000 | A | PASS |
|
|
|
harvey ###-#### fn occ signed the perm col 7/20/2000 2:30:10 PM
|
Permanent Occupancy | | 7/20/2000 | 7/20/2000 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 7/20/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8300 issued 7-20-00 to Like-nu Car Wash.
|
BLD-Final | 7/13/2000 | 7/14/2000 | 7/14/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 16:07:20. Contact: ###-####. temp occ ok for the wash tunnel and the vac bays only until compressor is taged by u.l. letter on file from owner that power will be terminated in 2-weeks if lable is not on compressor 7/14/2000 4:37:51 PM
|
Temporary occupancy | | | 7/14/2000 | | PART |
|
|
|
Temp. Occ. Cert. #4039 issued 7-14-00 to Like-Nu Car Wash for the tunnel and vacuum areas only.
|
FIRE-Final Inspection | 6/29/2000 | 6/30/2000 | 6/30/2000 | A | PASS |
Rick Jackson
|
|
|
steve ###-####
|
BLD-Framing/Rough-in | 5/24/2000 | 5/24/2000 | 5/24/2000 | P | PART |
|
|
|
###-#### information on the truss brace changes ok 5/26/00 6:57:54 AM
|
BLD-Framing/Rough-in | 5/19/2000 | 5/22/2000 | 5/22/2000 | A | PART |
|
|
|
rod ###-#### fr need desgn chang 5/24/00 2:55:57 PM rod ###-#### fr need design changes from arch submitted sealed by arch and engneed desgn chang 5/24/00 2:55:57 PM 5/24/00 2:56:31 PM
|
FIRE-Supply Line Hydro | 4/12/2000 | 4/13/2000 | 4/13/2000 | A | FAIL |
Rick Jackson
|
|
|
building not sprinklered - contractor to request plumbing inspection
|
BLD-Foundation | 4/4/2000 | 4/5/2000 | 4/5/2000 | P | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Foundation | 3/24/2000 | 3/27/2000 | 3/27/2000 | A | PASS |
Russ Owen
|
|
|
###-#### Reinsp. at PM walls at mechanical room 3/28/00 9:14:57 AM
|
BLD-Footing | 3/22/2000 | 3/23/2000 | 3/23/2000 | A | PASS |
|
|
|
rod ###-#### r-bar placed in the footings 03/23/2000 12:57:14 PM
|
BLD-Footing | 3/21/2000 | 3/22/2000 | 3/22/2000 | A | NR |
Russ Owen
|
|
|
###-#### Need compaction report, need vent's tied up and need approved plans, notified person on site. 3/22/00 1:45:36 PM
|
BLD-Footing | 3/20/2000 | 3/21/2000 | 3/21/2000 | P | CANC |
Russ Owen
|
|
|
###-####
|
Print Occupancy Form | | | 3/17/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/17/2000 | | DONE |
|
|
|
|
Telephone call | | | 3/17/2000 | | DONE |
|
|
|
talked to terri gave dollar amount
|
Plan Reviewer's activity | | | 3/16/2000 | | DONE |
|
|
|
PLAN MODIFICATION Waiting for engineer's detail of wide flange beam to existing T.S. beam per detail 3/A3.
|
Routing - PLAN CHECK | 3/14/2000 | | 3/16/2000 | | DONE |
|
|
|
PLAN MODIFICATION
|
BLD-Foundation | 3/15/2000 | 3/16/2000 | 3/16/2000 | A | PASS |
Russ Owen
|
|
|
rod ###-#### Walls (West) side 3/16/00 2:27:48 PM
|
Plan Reviewer's activity | | | 3/16/2000 | | DONE |
|
|
|
PLAN MODIFICATION
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2000 | | DONE |
|
|
|
PLAN MODIFICATION
|
Plan assigned to (M_P) | 3/7/2000 | | 3/16/2000 | | PASS |
Mike Phillips
|
|
|
3/16/2000 16:05:25 M_P - activity updated through activity BLDA022 from case BLD99-03555.
|
BLD-Foundation | 3/13/2000 | 3/14/2000 | 3/14/2000 | A | PART |
Tom Arcoraci
|
|
|
Rod ###-#### Soils report ok for West footing. 3/14/00 2:01:40 PM
|
Routing - FIRE | 3/10/2000 | 3/14/2000 | 3/14/2000 | | PASS |
Bill Alexander
|
|
|
PLAN MODIFICATION - Re-approved per original review comments
|
BLD-Foundation | 3/9/2000 | 3/13/2000 | 3/13/2000 | A | FAIL |
Wes Worcester
|
|
|
Rejected MTI report, need scope of work letter & log in sheet, compaction report required- DO NOT POUR 3/24/00 1:57:13 PM
|
Routing - PLAN CHECK | 2/29/2000 | | 3/10/2000 | | |
|
|
|
PLAN MODIFICATION
ROUTING TO FIRE FOR REVIEW OF MODIFICATION.
|
BLD-Concrete | 3/7/2000 | 3/7/2000 | 3/7/2000 | P | PART |
Russ Owen
|
|
|
early pm Rod ###-#### Walls. 3/8/00 10:36:55 AM
|
BLD-Foundation | 3/2/2000 | 3/3/2000 | 3/3/2000 | A | FAIL |
Russ Owen
|
|
|
###-#### rod\\Rebar Need ok for the center pit, not constructed per plan, as shown as Mono Pour. 3/6/00 1:44:58 PM
|
Routing - PLANNING | 2/29/2000 | | 2/29/2000 | | DONE |
|
|
|
PLAN MODIFICATION approved per DRH99-91.
|
Routing - PLUMBING | 2/25/2000 | | 2/29/2000 | | DONE |
|
|
|
PLAN MODIFICATION
|
BLD-Concrete | 2/24/2000 | 2/25/2000 | 2/25/2000 | A | PART |
Russ Owen
|
|
|
###-#### early am Footings, partial on west side. 2/25/00 3:05:24 PM
|
Routing - PUBLIC WORKS | 2/23/2000 | | 2/25/2000 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/23/2000 | | DONE |
|
|
|
RECEIVED PLAN MODIFICATION FROM BILL MATTER , ARCHITECT, PROCESSED AND ROUTED PLANS. 2/23/00 DAR
|
CHANGE STATUS TO (P) | | | 2/22/2000 | | DONE |
|
|
|
plan modification recieved....
|
BLD-Footing | 2/16/2000 | 2/17/2000 | 2/17/2000 | A | PART |
Russ Owen
|
|
|
###-#### Footings at carbays and fence on property line, soils ok by engineers compaction report. 2/18/00 3:24:54 PM
|
BLD-Footing | 2/15/2000 | 2/16/2000 | 2/16/2000 | A | CANC |
Russ Owen
|
|
|
rod ###-#### Will recall when ready. 2/16/00 2:34:17 PM
|
BLD-Conference | 2/8/2000 | 2/8/2000 | 2/8/2000 | P | PART |
Russ Owen
|
|
|
Rod ###-#### just need to submit for a permit addemdum to demolish existing mech room.
|
Plan assigned to (M_P) | 12/8/1999 | 12/8/1999 | 2/2/2000 | | PASS |
Mike Phillips
|
|
|
2/2/2000 09:18:27 M_P - activity updated through activity BLDA022 from case BLD99-03555.
|
Routing - PLAN CHECK | 1/25/2000 | | 2/2/2000 | | |
|
|
|
|
Plan Reviewer's activity | | | 2/2/2000 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 2/2/2000 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/2/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/2/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/2/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/2/2000 | | DONE |
|
|
|
|
Telephone call | | | 2/2/2000 | | DONE |
|
|
|
talked to cindy gave dollar amount
|
Issue PAID IN FULL permit | | | 2/2/2000 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 2/2/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 2/1/2000 | | |
|
|
|
Need structural information on existing CMU walls and new column steel.
|
Plan resubmittals received | | | 1/27/2000 | | DONE |
|
|
|
RECEIVED COPY OF RECORD OF SURVEY NO. 4868 RECORDED BY TEALEY LAND SURVEYING.
|
Routing - PLUMBING | 1/24/2000 | | 1/25/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/13/2000 | | 1/24/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/3/2000 | | 1/13/2000 | | |
|
|
|
Routing to P.W.
|
Plan resubmittals received | | | 1/13/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM MATTER ARCHITECTS, DETAILS AND ARCHITECTURAL DRAWINGS, FORWARDED SAME TO MIKE PHILLIPS. 1/13/00 DAR
|
Routing - FIRE | 12/28/1999 | 12/30/1999 | 12/30/1999 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 12/30/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 12/22/1999 | | 12/28/1999 | | |
|
|
|
ROUTING TO FIRE DEPARTMENT.
|
Plan resubmittals requested | | | 12/28/1999 | | FAIL |
|
|
|
ADDITIONAL INFORMATION REQUESTED FOR FURTHER REVIEW.
|
Print Pending Permit.LaserJet4 | | | 12/28/1999 | | FAIL |
|
|
|
ADDITIONAL INFORMAITON REQUESTED FOR FURTHER REVIEW, ROUTING TO FIRE DEPARTMENT FOR REVIEW.
|
Routing - PLANNING | 12/15/1999 | | 12/22/1999 | | PASS |
|
|
|
Approved per DRH99-0091.
|
Routing - PLUMBING | 12/9/1999 | | 12/15/1999 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 12/7/1999 | | 12/9/1999 | | FAIL |
|
|
|
NEEDS ACHD OK FOR DRAINAGE PER BRIAN MURPHY. 12/9/99 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 12/7/1999 | | |
|
|
|
|
Plan assigned to (JCM) | 12/6/1999 | 12/6/1999 | 12/6/1999 | | PASS |
John Menard
|
|
|
|
Application received | | | 12/6/1999 | | |
|
|
|
|
Plan resubmittals received | | | 1/14/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM BILL MATTERCIVIL DRAWINGS 5 EACH C1, C2, C2A, C3, C4, AND C5; AND 2 EACH OF P1 AND P2. FORWARDED 3SETS OF CIVILS TO BRIAN MURPHY. INCORPORATED 2SETS OF CIVILS AND 2SETS OF PLUMBING PLANS INTO ORIGINAL SETS. 1/14/00 DAR
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|
Print Occupancy Form | | | | | |
|
|
|
|