Fee Review-notes | 12/6/1999 | 12/6/1999 | 2/20/2001 | | DONE |
|
|
|
|
BLD-Final | 12/21/2000 | 12/21/2000 | 12/21/2000 | A | PASS |
Tony Young
|
|
|
Rec'd special inspection letter and ok for perm. occ. cert.
|
Permanent Occupancy | | 12/21/2000 | 12/21/2000 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 12/21/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8513 issued 12-21-00 to the Mountain Cove School gymnasium.
|
BLD-Final | 12/7/2000 | 12/8/2000 | 12/8/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/07/2000 at 14:48:49. Contact: ###-####.
temp. c of o signed, pending final letter of compliance from special inspection co.,, letter from arch. on fire damper in mech. room,, and threshholds on area seperation wall doors. 12/8/2000 12:56:14 PM
|
FIRE-Final Inspection | 12/5/2000 | 12/7/2000 | 12/7/2000 | P | PASS |
Rick Jackson
|
|
|
###-####
|
Code Occupancy Approval | | | 12/7/2000 | | DONE |
|
|
|
Meets compliance with CUP99-00105. Signed Final.
|
FIRE-Final Inspection | 12/4/2000 | 12/5/2000 | 12/5/2000 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/04/2000 at 09:19:28. Contact: ###-####.////// c/n issued - alarm and sprinkler issues; fire lane painting; exit sign 12/5/2000 3:54:29 PM
|
BLD-Framing/Rough-in | 10/20/2000 | 10/23/2000 | 10/23/2000 | A | PART |
Tony Young
|
|
|
###-####
ceiling grid in gym locker rooms 10/23/2000 9:02:55 AM
|
BLD-Framing/Rough-in | 9/18/2000 | 9/19/2000 | 9/19/2000 | A | PART |
Tony Young
|
|
|
Kelly ###-####
ROUGH FRAME OK IN LIBERARY CAREER CENTER S.E. CORNER... W/ # 338 9/19/2000 11:10:25 AM
|
BLD-Framing/Rough-in | 8/17/2000 | 8/18/2000 | 8/18/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/17/2000 at 15:38:55. Contact: ###-####.
firewall where 2 rooflines meet on south-east side, perpandicular of gym wall 8/18/2000 3:14:09 PM
|
BLD-Framing/Rough-in | 8/16/2000 | 8/17/2000 | 8/17/2000 | P | FAIL |
Tom Arcoraci
|
|
|
KELLY ###-#### FR needs detail for occ sep wall jamb has been fire chalked 8/17/2000 4:54:58 PM
|
BLD-Framing/Rough-in | 8/14/2000 | 8/14/2000 | 8/14/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/14/2000 at 07:45:51. Contact: ###-####. conference on 1 hr. wall 8/14/2000 2:06:51 PM
|
BLD-Conference | 8/14/2000 | 8/14/2000 | 8/14/2000 | P | PART |
|
|
|
Added by Inspector: 338 On 8/14/2000 with 415 and the super on a revision of the construction of the 1-hour occ sep wall
|
BLD-Framing/Rough-in | 7/6/2000 | 7/7/2000 | 7/7/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/06/2000 at 07:04:56. Contact: ###-####. Need approved plans- roof framing from gym to existing roof. 7/10/00 9:49:30 AM
|
BLD-Framing/Rough-in | 6/29/2000 | 7/3/2000 | 7/3/2000 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/29/2000 at 14:03:08. Contact: ###-####. forgot to call and cancle insp. n/r 7/3/00 10:22:45 AM
|
BLD-Foundation | 5/30/2000 | 6/1/2000 | 6/1/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 05/30/2000 at 14:00:39. Contact: ###-####. with sp insp aprovals 6/5/00 6:55:07 AM
|
BLD-Footing | 5/4/2000 | 5/5/2000 | 5/5/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 10:18:39. Contact: ###-####. Subject to special inspection, footing at area east wall, was access. 5/8/00 9:17:16 AM
|
BLD-Footing | 4/28/2000 | 5/2/2000 | 5/2/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/28/2000 at 12:32:02. Contact: ###-####. Need engineers clarification for verticals, called him and he is calling job foreman. 5/3/00 3:27:53 PM
|
BLD-Foundation | 4/25/2000 | 4/27/2000 | 4/27/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/25/2000 at 12:36:19. Contact: ###-####. 4 hr wall line west and north rebar ok pending special insp. report. 4/27/00 11:42:25 AM
|
BLD-Footing | 4/21/2000 | 4/24/2000 | 4/24/2000 | A | PASS |
|
|
|
Scheduled by a contractor via Hello! on 04/21/2000 at 16:10:32. Contact: ###-####. made ok 4/27/00 11:03:54 AM
|
Issue PAID IN FULL permit | | | 4/11/2000 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 12/7/1999 | | 2/24/2000 | | DONE |
Mike Otto
|
|
|
|
Print Occupancy Form | | | 2/24/2000 | | DONE |
|
|
|
|
Telephone call | | | 2/24/2000 | | DONE |
|
|
|
left mess for otis lemmon to verify plans are ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2000 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/9/2000 | | 2/14/2000 | | PASS |
|
|
|
RECEIVED STRUCTURAL REVIEW LETTER FROM OUTSIDE ENG. ROUTED TO MARLENE DUE TO MIKE O BEING OUT OF TOWN. KMM
|
Plan resubmittals received | | | 2/9/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM CSHQA ALONG WITH SOME STRUCTURAL CACULATIONS AND SHEET S3.1 2/9/00 DAR
|
Plan resubmittals received | | | 2/8/2000 | | DONE |
|
|
|
RECEIVED PL;AN RESUBMITTALS FROM CSHQA ARCHITECTS, OTIS LEMMON SHEETS AO.1, A2.1, A6.1 FORWARDED SAME TO MIKE OTTO. 2/8/00 DAR U
|
Routing - PLAN CHECK | 2/8/2000 | | 2/8/2000 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 2/8/2000 | | FAIL |
|
|
|
RE-FAXED STRUCTURAL COMMENTS TO STEVE GREEN CSHQA.
|
Plan resubmittals requested | | | 1/25/2000 | | FAIL |
|
|
|
STRUCTURAL CORRECTIONS FAXED TO ARCHITECT.
|
Routing Off Site - STRUCTURAL | 1/21/2000 | | 1/25/2000 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE REVISED PLANS TO OUTSIDE ENG. KMM
1/24/2000 RECEIVED STRUCT. REVIEW LETTER BY CH2MHILL DATED 1/23/2000 ROUTED TO MIKE O. KMM ADDITONAL CORRECTIONS FAXED TO ARCHITECT.
|
Routing - FIRE | 1/21/2000 | 1/24/2000 | 1/24/2000 | | PASS |
Sam Rogers
|
|
|
PLANS SENT BACK TO PLAN CHECK
|
Routing - PLAN CHECK | 1/19/2000 | | 1/21/2000 | | FAIL |
|
|
|
met with architect corrections presented at meeting 1/21/2000/ MLO
|
Plan resubmittals requested | | | 1/21/2000 | | FAIL |
|
|
|
BUILDING CODE CORRECTIONS
|
Plan resubmittals received | | | 1/21/2000 | | DONE |
|
|
|
RECEIVED ONE COPY OF REVISED STRUCT. DRAWINGS, SHEETS S1.1, S1.2, S2.1 ROUTED TO MIKE OTTO. KMM
|
Plan resubmittals received | | | 1/19/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM CSHQA ARCHITECTS A, O, S AND E SHEETS, FORWARD4ED SAME TO MIKE OTTO. 1/19/00 DAR
|
Routing - FIRE | 12/29/1999 | 1/7/2000 | 1/7/2000 | | FAIL |
|
|
|
NEED HYDRANT FIRE FLOWS, HYDRANT LOCATIONS, DETAIL OF FIRE ACCESS AND UBC EXIT ISSUE.
|
Plan Review Completed(1st rev) | | | 1/7/2000 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/8/1999 | | 1/6/2000 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
|
Routing - PLAN CHECK | 12/21/1999 | | 12/29/1999 | | FAIL |
|
|
|
corrections mailed to architect.
|
Plan resubmittals requested | | | 12/29/1999 | | FAIL |
|
|
|
UBC Corrections.
|
Routing - PLANNING | 12/17/1999 | | 12/20/1999 | | DONE |
|
|
|
AS PER CUP99-00105
|
Routing - PLUMBING | 12/14/1999 | | 12/17/1999 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 12/8/1999 | | 12/14/1999 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/8/1999 | | |
|
|
|
RECEIVED OUTSIDE ENG. COPY OF PLANS AND THREE ADDITIONAL CIVIL SHEETS. KMM
|
Received Certificate of Value | | | 12/7/1999 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/7/1999 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/6/1999 | | FAIL |
|
|
|
12/6/99 CONTACTED OTIS LEMON REGARDING PLAN SUBMITTAL. REQUIRE OUTSIDE ENG. SET, THREE ADDITIONAL CIVIL SHEETS. KMM OTIS BROUGHT IN ABOVE ITEMS, HOWEVER PLANS WERE NOT STAMPED OR SIGNED. 12/7/99 CONTACTED OTIS AGAIN ABOUT ABOVE ITEMS, AND THE NEED TO HAVE PLANS STAMPED AND SIGNED. KMM
|
Application received | | | 12/6/1999 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|
Inspection Record Card- Bld | | | | | |
|
|
|
|