BLD-Final | 5/1/2000 | 5/2/2000 | 5/2/2000 | A | FAIL |
Russ Owen
|
|
|
CHRIS ###-#### FN Electrical and energy. 5/3/00 3:27:18 PM
|
Plan Reviewer's activity | | | 3/30/2000 | | DONE |
|
|
|
FLOOD PLAIN ELEVATION CERTIFICATE RECEIVED. PREPARED BY STEVE SWEET, P.E. COPY ON FILE IN OFFICE.
|
BLD-Wall cover | 3/2/2000 | 3/2/2000 | 3/2/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/02/2000 at 08:11:11. Contact: ###-####. OK to side exterior. 3/3/00 9:05:12 AM
|
BLD-Other | 3/2/2000 | 3/2/2000 | 3/2/2000 | P | PASS |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 3/1/2000 | 3/1/2000 | 3/1/2000 | P | PART |
Wes Worcester
|
|
|
Interior framing corrections made ok. Need exterior shear finished and energy code inspection.
|
BLD-Framing/Rough-in | 2/29/2000 | 2/29/2000 | 2/29/2000 | P | FAIL |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 02/29/2000 at 07:47:31. Contact: ###-####. Finishing truss engineering. Need calcs per plan, squash blocks, solid studs under girders & transger all point load. 3/1/00 11:09:15 AM
|
BLD-Framing/Rough-in | 2/28/2000 | 2/28/2000 | 2/28/2000 | A | CANC |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 02/28/2000 at 07:18:33. Contact: ###-####. will recall- not ready. 2/28/00 2:36:41 PM
|
BLD-Framing/Rough-in | 2/28/2000 | 2/28/2000 | 2/28/2000 | P | FAIL |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 02/28/2000 at 08:48:48. Contact: ###-####.Shear nailing faied also interior shear walls not done as per plan also framer unaware of engineering requirements at this time.had to explain them to him. they also want a framing inspection i do not have the time told them to recall for an am.
|
Plan Reviewer's activity | | | 2/23/2000 | | DONE |
|
|
|
ELEVATION CERTIFICATE RECEIVED FROM STEVE SWEET, P.E. COPY ON FILE IN PLAN REVIEW OFFICE.
|
BLD-Wall cover | 2/18/2000 | 2/18/2000 | 2/18/2000 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/18/2000 at 10:51:43. Contact: ###-####. Need eng'g, flood plain ?C/N. recall. 2/23/00 11:00:44 AM
|
BLD-Foundation | 1/3/2000 | 1/3/2000 | 1/3/2000 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 08:42:03. Contact: ###-####. About 50% foarm boards in place.
|
BLD-Footing | 12/30/1999 | 12/30/1999 | 12/30/1999 | P | PASS |
|
|
|
Scheduled by a contractor via Hello! on 12/30/1999 at 10:57:58. Contact: ###-####. Forms placed & R-bar.
|
Inspection Record Card- Bld | | | 12/28/1999 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/17/1999 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/16/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/16/1999 | | DONE |
|
|
|
|
Telephone call | | | 12/16/1999 | | DONE |
|
|
|
called permit ready
|
Plan assigned to (SAM) | 12/10/1999 | | 12/16/1999 | | PASS |
Steve Munroe
|
|
|
12/16/1999 14:07:33 SAM - activity updated through activity BLDA022 from case BLD99-03581.
|
Pending Assignment by DJO | 12/8/1999 | | 12/10/1999 | | DONE |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 12/8/1999 | 12/8/1999 | 12/8/1999 | | DONE |
|
|
|
|
Routing - PLANNING | 12/8/1999 | 12/8/1999 | 12/8/1999 | | DONE |
|
|
|
|
Application received | | | 12/8/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 12/8/1999 | 12/8/1999 | | | PEND |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
Called and left a message for the builder to call concerning questions I have on his plan. I call him at 11:43.
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Print permit w/o conditions | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Print permit w/o conditions | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|