Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-03588
StatusFinaled
Name SUNDANCE CONSTRUCTION
Site Address 918 W IDAHO ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(THE BON MARCHE - BASEMENT RESTROOM UPGRADE) This building is fire sprinklered for area increase. To remodel the basement restrooms to be fully accessible to the disabled. Restrooms are located in the Northwest corner of the basement. Work is to include selective demolition, new doors, new toilet partitions, suspended ceilings, and new fixtures all per approved drawings and plan review conditions on file. PC-956-99 **CJW** (Added 8-3-00) In addition, to modify the building ventilation system to make outside air available to all building levels (3,000 cubic feet per minute total building).
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/9/2001 DONE
Fee Review-notes12/8/199912/8/199911/27/2000 DONE
additional values from the subs...
Letter of compliance  10/25/2000 DONE
Letter of Compliance #19969 issued 10-25-00.
BLD-Final9/28/20009/29/20009/29/2000APASS
DetailsJim Storey
###-####
Print Occupancy Form  9/29/2000 DONE
FIRE-Final Inspection9/26/20009/27/20009/27/2000ANR
DetailsRick Jackson
Israel ###-#### not a final inspection - sprinkler r/i okay to cover 9/27/2000 9:59:02 AM
FIRE-Sprinkler Rough-in9/27/20009/27/20009/27/2000APASS
DetailsRick Jackson
Added by Inspector: 409 On 9/27/2000 okay to cover
BLD-Framing/Rough-in9/26/20009/26/20009/26/2000PPASS
DetailsJim Storey
ceiling Shawn ###-####
BLD-Framing/Rough-in9/22/20009/22/20009/22/2000PFAIL
DetailsJim Storey
ceiling shawn ###-#### c/n lights supports/ gyp protection type 3 1hr. 9/25/2000 10:17:15 AM
BLD-Framing/Rough-in9/22/20009/22/20009/22/2000PFAIL
DetailsJim Storey
ceiling shawn ###-#### c/n lights supports/ gyp protection type 3 1hr. 9/25/2000 10:17:15 AM
BLD-Framing/Rough-in9/5/20009/6/20009/6/2000APASS
Details
###-#### ok to cover header not needed 9/7/2000 3:11:47 PM
BLD-Framing/Rough-in9/1/20009/5/20009/5/2000APART
Details
shawn ###-#### need header over entry to restrooms 9/6/2000 9:36:49 AM
BLD-Framing/Rough-in8/31/20009/1/20009/1/2000APART
Details
###-#### ok to cover pending review by inspector of the approved plans while on the jobsite 9/1/2000 4:08:36 PM
Routing Off Site - A.C.H.D8/4/20008/4/20008/4/2000 DONE
No achd needed for this project>mps8/4/00
Telephone call  8/4/2000 DONE
called left message gave dollar amount
Issue PAID IN FULL permit  8/4/2000 DONE
Print Occupancy Form  8/4/2000 DONE
Inspection Record Card- Bld  8/4/2000 DONE
Plan Reviewer's activity  8/3/2000 PASS
Resubmitted drawings approved, with conditions and "red lines", after review.
CHANGE STATUS TO (PND)  8/3/2000  
PLANS/APPL TAKEN TO FRONT DESK  8/3/2000 PASS
Telephone call  8/3/2000 DONE
Carl Westfall pulled plans from drawer 8/3/00
Plan resubmittals received  7/28/2000 DONE
RECEIVED TWO COPIES OF REVISED M-1 SHEET AND ONE COPY OF REVISED CERT. OF VALUE. ROUTED TO CARL W. KMM
Plan resubmittals received  7/27/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS 0.1, 0 4, 20.0, 20.1, M-1 ROUTED TO CARL W. KMM
Plan resubmittals received  7/27/2000 PASS
Resubmittals received. Restrooms redesigned. Mechanical work expanded to included making outside air available to all floors.
Telephone call  3/27/2000 DONE
tried to call no answer or answering machine-mps3/27/00
Routing - PLAN CHECK1/5/2000 1/7/2000  
PLANS/APPL TAKEN TO FRONT DESK  1/7/2000 PASS
Inspection Record Card- Bld  1/7/2000 DONE
Print Occupancy Form  1/7/2000 DONE
Telephone call  1/7/2000 DONE
TALKED TO JOHN MAHONEY-TO VERIFY PLANS ARE READY
Plan assigned to (CJW)12/9/1999 1/7/2000 PASS
DetailsCarl Westfall
1/7/00 12:40:53 CJW - activity updated through activity BLDA022 from case BLD99-03588.
Routing - FIRE12/28/19991/5/20001/5/2000 PASS
DetailsSam Rogers
Plan Review Completed(1st rev)  1/5/2000 PASS
DetailsSam Rogers
Routing - PLUMBING12/22/1999 12/28/1999 DONE
Routing - PLAN CHECK12/14/1999 12/22/1999 PASS
Plan Reviewer's activity  12/21/1999 PASS
UBC plan review started December 21, 1999 and finished December 22, 1999. The drawings were approved with conditions. See the conditions list.
Routing - PUBLIC WORKS12/9/1999 12/14/1999 DONE
Plan routing begun/TENANTS  12/9/1999 DONE
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  12/9/1999 DONE
CERTIFICATE OF VALUE NOT COMPLETELY FILLED IN, CONTACTED JOHN MAHONEY AND HE WILL TAKE CARE OF THE PROBLEM. 12/9/99 DAR
Pending Assignment by MYS12/9/1999 12/9/1999 DONE
DetailsMarlene Southard
Application received  12/8/1999  
Plan Review Report