Permit NumberBLD99-03607
StatusFinaled
Name HEWLETT PACKARD (BLDG. #3)
Site Address 11311 CHINDEN BLVD
Project NameHP #3 - 1ST FLR
Customer Number 
ePlanReviewNo
Description
To construct a 1-hr. occupancy separation between the "A2.1" cafeteria occupancy and remainder of the "B" occupancy of Building #3 (HP#3 includes the 1-story as well as the 2-story portion. The "A2.1" Cafeteria is <10% of the "B", requiring 1-hr. const. & 1-hr. separation) and to upgrade the existing 1-hour exit corridor to comply with code, per approved plans on file. NOTE: This building is fully fire sprinklered for area increase. (P.C.#960-99)/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/11/2011  
Fee Review-notes12/10/199912/10/19995/5/2000 DONE
Letter of compliance  3/24/2000 DONE
Letter of Compliance #18389 issued 3-24-00.
BLD-Final3/22/20003/23/20003/23/2000PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/22/2000 at 10:42:49. Contact: . OK for perm. 3/24/00 9:32:38 AM
BLD-Final3/21/20003/21/20003/21/2000PPASS
DetailsJoe Tawney
Final ok for certificate of completion.
FIRE-Alarm Testing3/8/20003/14/20003/14/2000PFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 03/08/2000 at 11:50:17. Contact: ###-####. Inspection cancelled submittals not approval. 3/16/00 11:19:51 AM
Receive PAYMENT IN FULL  2/15/2000 DONE
BLD-Framing/Rough-in12/23/199912/29/199912/29/1999PPART
DetailsTom Arcoraci
dan ###-#### r/i. Ok to cover lower level.
FIRE-Final Inspection12/29/199912/29/199912/29/1999PPASS
DetailsJoe Tawney
Final alarm system upgrade pass.
Inspection Record Card- Bld  12/21/1999 DONE
Print Occupancy Form  12/21/1999 DONE
Print Occupancy Form  12/21/1999 DONE
Telephone call  12/21/1999 DONE
talked to debbie to verify plans are ready
Issue & PRINT FEE-DUE permit  12/21/1999 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/20/1999 PASS
Processing for issuance of permit based on plan review comments & cover letter.
Plan assigned to (DRS)12/15/1999 12/20/1999 PASS
DetailsDan Stuart
12/20/1999 14:33:26 DRS - activity updated through activity BLDA022 from case BLD99-03607.
Routing - PLAN CHECK12/15/1999 12/20/1999 PASS
APPROVED AS NOTED AND PER ATTACHED PLAN REVIEW COMMENTS & COVER LETTER. REVIEWED SCOPE WITH BILL ALEXANDER TO SEE IF HE NEEDED TO REVIEW PLANS. NOT REQUIRED.
Routing - FIRE12/20/1999 12/20/1999  
HAD BILL ALEXANDER COME TO MY CUBICLE TO REVIEW SCOPE OF WORK. DOES NOT INVOLVE ANY NEW WALLS BELOW CEILING SO THE EXISTING SPRINKLER SYSTEM PLACEMENT SHOULD STILL PROVIDE REQUIRED COVERAGE. HOWEVER I HAVE NOTED AS A CONDITION OF FINAL APPROVAL THAT THE FIRE INSPECTOR REVIEW THE EXISTING SITUATION FOR ANY REQUIRED UPGRADES OF SPRINKLER OR ALARM SYSTEM THAT HAVE BEEN AFFECTED BY THIS PROJECT SCOPE. drs
Plan routing begun/TENANTS  12/15/1999 DONE
Route to PLAN CHECK and FIRE.
Pending Assignment by MYS12/15/1999 12/15/1999 DONE
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  12/13/1999 DONE
Received Certificate of Value  12/13/1999 DONE
Application received  12/10/1999  
Meeting  12/6/1999  
Met with John Maulin & associate to review the scope of the 1-hour occupancy separation /corridor upgrade to improve compliance with original requirements for separation & construction for an "A2.1 & "B" occupancy in HP#3. We have been working on getting approval from HP to work on this construction upgrade since mid 1996 when it was discovered that the original code review requirements had not been completed. Additional work is needed in other parts of the "A2.1", "A3" & "B", 1-story portion, that are being reviewed and we will continue to make progressive steps until completed.