Case Summary (BLD) | | | 9/1/2004 | | |
|
|
|
|
BLD-Conference | 6/30/2003 | 7/1/2003 | 7/1/2003 | A | PASS |
Carl Dependahl
|
|
|
ok ...w/ Troy...was finalled 7/1/2003 9:39:56 AM
|
Fee Review-notes | 6/11/2003 | 6/11/2003 | 6/11/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 2/2/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8558 issued 2-2-01 to SCP Global Technologies.
|
Permanent Occupancy | | 12/1/2000 | 12/1/2000 | | DONE |
|
|
|
|
BLD-Final | 11/29/2000 | 11/30/2000 | 11/30/2000 | A | PASS |
Russ Owen
|
|
|
Jerry ###-####
|
Fee Review-notes | 12/14/1999 | 12/14/1999 | 11/27/2000 | | DONE |
|
|
|
need to have final cert the values have changed many times
|
Temporary occupancy | | | 11/17/2000 | | PART |
|
|
|
Temp. Occ. Cert. #4081 issued 11-17-00 to SCP Global Technologies.
|
FIRE-Final Inspection | 11/15/2000 | 11/16/2000 | 11/16/2000 | A | PASS |
Joe Tawney
|
|
|
###-#### Final OK for permanant occupancy 11/16/2000 12:56:36 PM
|
BLD-Final | 11/15/2000 | 11/16/2000 | 11/16/2000 | P | CANC |
Steven Webb
|
|
|
###-####: To Carl 11/16/2000 1:41:01 PM
|
BLD-Final | 11/16/2000 | 11/16/2000 | 11/16/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/16/2000 5:48:46 PM ok for t/o, complete fire insp, etc.
|
BLD-Framing/Rough-in | 9/20/2000 | 9/21/2000 | 9/21/2000 | A | PART |
Tom Arcoraci
|
|
|
###-####\\ceiling
|
Receive PAYMENT IN FULL | | | 8/22/2000 | | DONE |
|
|
|
|
BLD-Conference | 8/21/2000 | 8/21/2000 | 8/21/2000 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/21/2000 w/ Dan S re resubmittal & phase 2 permit
|
BLD-Framing/Rough-in | 8/7/2000 | 8/10/2000 | 8/10/2000 | A | PART |
Tom Arcoraci
|
|
|
jerry ###-#### wip conf on exit stairs and office walls 8/11/2000 8:15:23 AM
|
Received Certificate of Value | | | 7/28/2000 | | |
|
|
|
RECEIVED A NEW CERTIFICATE OF VALUE TO ADD TO ORIGINAL COSTS OF PROJECT FOR CONSTRUCTION OF ADDITIONAL 151 SQ. FT. WIPEDOWN ROOM AS PART OF PROJECT. COPY TO LINDA HARTWELL.
|
Plan resubmittals received | | | 7/27/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A2.1.0X, A2.1.0, A2.1.3, A2.1.3F, A2.1.3CW, A2.1.3E. ROUTED TO DAN S. KMM
|
Additional plans submitted | | | 7/27/2000 | | PASS |
|
|
|
Expanded H-6 area to insclude a 151 sq. ft. wipw down room around the originally approved scissor lift location. New Certificat of value supplied - $ 5800.00 total additional estimate; $900.00-Electrical; $700.00 - mechanical; $800.00 - fire sprinklers. New sheets A2.1.0.X, A2.1.0, A2.1.3, A2.1.3AF, A2.1.3CW, A2.1.3E, A3.1, A4.1, A8.4, A9.13 - TWO COPIES APPROVED. ONE TO PLAN VAULT TO ADD TO ORIGINAL RECORDS AND ONE TO STRUCTURAL INSPECTOR CARL DEPENDAHL TO DELIVER TO JOB SITE FOR CONTRACTORS PLANS. COPY OF NEW CERTIFICATE OF VALUE GIVEN TO LINDA HARTWELL TO INCLUDE ON FINAL VALUE ANALYSIS FOR FEE'S.
|
BLD-Framing/Rough-in | 7/13/2000 | 7/14/2000 | 7/14/2000 | A | PART |
Carl Dependahl
|
|
|
jerry ###-#### fr insp Upper layer @ tunnel corridio. South end of to continue, keep C/N's. 7/18/00 1:29:54 PM
|
BLD-Conference | 7/7/2000 | 7/7/2000 | 7/7/2000 | P | PART |
Carl Dependahl
|
|
|
With builder & framer: need complete copy of "MBMA" details....will consult with plan check.
|
BLD-Framing/Rough-in | 7/5/2000 | 7/6/2000 | 7/6/2000 | A | PART |
Carl Dependahl
|
|
|
jerry ###-#### WIP rec'd add'l detail for rated walls. 7/7/00 1:35:29 PM
|
BLD-Framing/Rough-in | 6/27/2000 | 6/28/2000 | 6/28/2000 | A | FAIL |
Carl Dependahl
|
|
|
jerry ###-#### Cn/N: complete firestopping, need phase I eng'rs report, etc. 6/28/00 2:30:55 PM
|
BLD-Framing/Rough-in | 6/21/2000 | 6/22/2000 | 6/22/2000 | P | PART |
Carl Dependahl
|
|
|
JERRY-- ###-#### FR Reviewing resub. for rm. 111, walls at new corridor ok. 6/23/00 11:18:11 AM
|
BLD-Framing/Rough-in | 6/22/2000 | 6/22/2000 | 6/21/2000 | A | FAIL |
Carl Dependahl
|
|
|
C/N: firestops - cuts @ exist 2 hr masonry previous corrections, ok to continue wall framing. discussed exit landings w/ bldr.
|
BLD-Framing/Rough-in | 6/19/2000 | 6/19/2000 | 6/19/2000 | P | NR |
Carl Dependahl
|
|
|
Jerry ###-####
|
BLD-Framing/Rough-in | 6/13/2000 | 6/13/2000 | 6/13/2000 | P | PART |
Jim Storey
|
|
|
Jerry ###-#### observed mock up of top of wall detail of assembly appears to be ok. 6/14/00 9:26:26 AM
|
FIRE-Conference | 6/6/2000 | 6/7/2000 | 6/7/2000 | A | PART |
Joe Tawney
|
|
|
###-#### Conf. with contractor 6/7/00 4:40:11 PM
|
BLD-Conference | 6/6/2000 | 6/7/2000 | 6/7/2000 | A | PASS |
Carl Dependahl
|
|
|
###-#### met w/ Jerry Timmons, stan of russell corp... Alan & Joe T. rec'd detail for T.O.W. wall closure ok per 104.2, but suggested continue look for alternate - ok to continue 6/19/00 11:39:22 AM
|
BLD-Conference | 6/6/2000 | 6/6/2000 | 6/6/2000 | P | FAIL |
Carl Dependahl
|
|
|
Awaiting arch's detail; keep C/N.
|
BLD-Framing/Rough-in | 6/1/2000 | 6/1/2000 | 6/1/2000 | A | FAIL |
Carl Dependahl
|
|
|
C/N re: to wall details, 1hr wall framing- recall for conf. asap.
|
BLD-Framing/Rough-in | 5/31/2000 | 5/31/2000 | 5/31/2000 | A | FAIL |
Carl Dependahl
|
|
|
W/architect & supt. & framer: C/N need details for top-of-wall w/references & HVAC modifications.
|
BLD-Framing/Rough-in | 5/25/2000 | 5/30/2000 | 5/30/2000 | A | FAIL |
Jim Storey
|
|
|
###-#### resubmitals need to be sent to carl for approval of redesign and occ. wall configurations. 5/31/00 11:30:50 AM
|
BLD-Framing/Rough-in | 5/22/2000 | 5/22/2000 | 5/22/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### ok to "1 side" walls- firestop boxes, etc. on fire walls. 5/23/00 2:34:52 PM
|
BLD-Framing/Rough-in | 5/18/2000 | 5/19/2000 | 5/19/2000 | A | NR |
Tom Arcoraci
|
|
|
###-#### Called no ans. on phone. 5/22/00 10:53:35 AM
|
BLD-Framing/Rough-in | 4/25/2000 | 4/26/2000 | 4/26/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### Struct. steel; pending spec. insp. reports. 4/28/00 8:40:47 AM
|
Print Occupancy Form | | | 4/21/2000 | | DONE |
|
|
|
|
Telephone call | | | 4/21/2000 | | DONE |
|
|
|
talked to tony ray at ###-#### to verify plans are ready
|
Issue PAID IN FULL permit | | | 4/21/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/20/2000 | 4/20/2000 | 4/20/2000 | | PASS |
|
|
|
Received & inserted new submittals, organized all attachments and routed to permit desk for issuance.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2000 | | PASS |
|
|
|
To permit desk for issuance of permit.
|
Plan assigned to (DRS) | 12/15/1999 | | 4/20/2000 | | PASS |
Dan Stuart
|
|
|
4/20/2000 16:17:57 DRS - activity updated through activity BLDA022 from case BLD99-03630.
|
Routing - PLAN CHECK | 4/10/2000 | 4/10/2000 | 4/19/2000 | | FAIL |
|
|
|
Began second review of plans based on new hazardous chemical quantities clarification received and upgrades to plans for hazardous type occupancy use requirements. Noted items incomplete or note responded to from previous plan review and mailed & faxed copies to Bob Bowen, ER+HDR, for re-submittal & Ben Hill, SCP Representative architect.
|
Plan resubmittals requested | | | 4/19/2000 | | |
|
|
|
Previous response from architect, Bob Bowen, to 2/12/00 plan review incomplete or parts not responded to at all. Faxed and mailed copies of notes indicating failure in response for him to address.
|
Telephone call | | | 4/19/2000 | | DONE |
|
|
|
Reviewed the remaining items in question with Bob Bowen, ER+HDR, and set up meeting for 3:30 p.m. for re-submittals.
|
Plan resubmittals received | | | 4/19/2000 | | |
|
|
|
Received cover letter and plans for remaining items from 2/00 plan review comments. Reviewed them with Bob Bowen & Ben Hill. Will insert changes into plans & co-ordinate all past submittals and correspondance for each set of documents and route for issuance of permit.
|
Routing - PLAN CHECK | 1/27/2000 | | 4/7/2000 | | PEND |
|
|
|
Received new plan re-submittals for structural modifications & tenant improvment modifications per plan review comments of 2/10/00. Inserted changed plans into original sets. Began re- review
|
Plan resubmittals received | | | 4/7/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTAL FROM ER + HDR, ALSO SMALL DOUCMENTS AND STRUCTURAL CACULATIONS. 4/7/00 DAR
|
Plan resubmittals received | | | 2/4/2000 | | DONE |
|
|
|
PLAN RESUBMITTALS RECEIVED FROM ER + HDR, SAME FORWARDED TO DAN STUART, SPEC SHEETS AND A + M SHEETS. 2/4/00 DAR
|
Routing - PLUMBING | 1/26/2000 | | 1/27/2000 | | DONE |
|
|
|
|
Routing - PLUMBING | 1/26/2000 | 1/26/2000 | 1/26/2000 | | |
|
|
|
1/26/00 - New Sheets P2 & P3 received as resubmittals. Inserted into plans. Routing back to Plumbing Plan Review. drs
|
Plan resubmittals received | | | 1/21/2000 | | |
|
|
|
Received plumbing plan resubmittals, P2 & P3.
|
Routing - PLAN CHECK | 1/3/2000 | 1/3/2000 | 1/15/2000 | | FAIL |
|
|
|
1st preliminary plan review of project completed. Failed review. Resubmittals required. Faxed and mailed copy of plan review comments to Tony Ray, architect for project. Plans behind desk waiting for submittals. Plans had been approved conditionally by fire dept. and failed at plumbing plan review.
|
Plan resubmittals requested | | | 1/15/2000 | | FAIL |
|
|
|
Faxed & mailed copy of plan review comments to architect for response.
|
Routing - PLAN CHECK | 12/29/1999 | | 1/3/2000 | | PEND |
|
|
|
Picked up plans to start review process. I am corresponding W/ Floyd Varley, Hazardous occupancy review to establish requirements that will apply based on occupancy. Client / architect want review as H6 & H7. It appears based on hazardous quantities of materials that only two areas will actually require a hazardous occupancy classification - the H7 area w/i the building and a proposed free-standing premanufactured H3/H7 occupancy unit routing through the State of Idaho for approval review. The owner proposes to design as H6 so this will be the review approach used.
|
Routing - FIRE | 12/30/1999 | | 1/3/2000 | | PASS |
|
|
|
RECEIVED PLANS BACK FROM FLOYD. APPROVED WITH CONDITIONS. ROUTED PLANS BACK TO DANNY STUART. FAXED ARCH. LETTER OF APROVAL FROM FLOYD. KMM
|
Routing - PLUMBING | 12/20/1999 | | 12/29/1999 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 12/16/1999 | | 12/20/1999 | | FAIL |
|
|
|
SEWER FEES UNDER NEGOTIATION PER JON WILLIAMS. 12/20/99 DAR
|
Plan routing begun/TENANTS | | | 12/16/1999 | | DONE |
|
|
|
Route to PLANNING, PUBLIC WORKS, PLUMBING, and PLAN CHECK. A SEPARATE SET OF PLANS WAS ROUTED TO FIRE (FLOYD VARLEY).
|
Routing - PLANNING | 12/16/1999 | | 12/16/1999 | | PASS |
|
|
|
approved (no exterior work, except for mech. scrn).
|
Plans ACCEPTED BY PLAN TECH | | | 12/15/1999 | | DONE |
|
|
|
SPRINKLER PLANS STATE NOT FOR CONSTRUCTION. NEW ONE REQUESTED. 12/15/99 DAR
|
Telephone call | | | 12/15/1999 | | DONE |
|
|
|
Called Bob Bowen at ER+HDR to discuss submittals received. At meeting of 12/3/99, it was determined that an application and plans would be submitted for review & permitting for as a STRUCTURAL PERMIT; an application and plans would be submitted for the T.I. PACKAGE PERMIT and a C.V. for a separate DEMO PERMIT. Five sets of plans w/ two copies of specs were submitted w/ 1 -application and all fee's paid based on one permit. Bob Bowen to determine if the three permit process is still desired and provide separate applications & values for each. I gave him Linda Hartwells phone number to call concerning treatment of allready paid fee's. I also informed him that sheet FP1.0 & FP2.0 were marked "not for construction" and these would need to be either resubmitted without this comment or the resposnible party would need to come in and cross off this comment and initial & date each. I also gave him Bill Alexanders number for review of requirements for separate fire sprinkler review fee's for separate permit for installation & review.
|
Meeting | | | 12/15/1999 | | |
|
|
|
Met with Linda Hartwell to let her know what was going on with fee's for seperate permit for SCP Clean Room Project and that Bob Bowen would be calling her.
|
Pending Assignment by MYS | 12/15/1999 | | 12/15/1999 | | DONE |
Marlene Southard
|
|
|
|
Application received | | | 12/14/1999 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/15/1999 | | 1/3/1999 | | PEND |
|
|
|
|
Routing - PUBLIC WORKS | 1/20/2000 | 1/20/2000 | | | PEND |
|
|
|
Plans routed to Louis by D.Stuart
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|
Inspection Record Card- Bld | | | | | |
|
|
|
|