Permit Information
Permit NumberBLD99-03630
StatusFinaled
Name ADAMS JEROME A LIVING TRUST
Site Address 255 N STEELHEAD WAY
Project NameSCP - TENANT IMPROVEMNT
Customer Number 
ePlanReviewNo
Description
To remodel an 18,357 sq. ft. area within an existing 45,000 sq.ft. Warehouse for use as an "H6 / H7" semiconductor facility with office and storage support areas per approved plans on file. Work to include construction of interior, non-bearing, noncombustible framing, fire code sheetrock cover, to create 1 & 2-hour occupancy separations around the "H6/H7" Fab Area from adjoining use areas and to create a 1-hour exit corridor system to serve as required exits from the areas. To install all electrical, mechanical, plumbing, fire supression & alarm support systems as required by the occupancy uses. To specifically comply with Article 51, 1997 UFC & Section 307.11, 1997 UBC, for the Clean Room & it's support areas.To provide compliant accessibility to all areas of this project per code and accessible restrooms in adjoining office building. NOTE: This building is fully fire sprinklered for allowable area increase. A "CERTIFICATE OF OCCUPANCY" IS REQUIRED AS A CONDITION OF THIS PERMIT. (P.C.#966-99)/drs
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  9/1/2004  
BLD-Conference6/30/20037/1/20037/1/2003APASS
DetailsCarl Dependahl
ok ...w/ Troy...was finalled 7/1/2003 9:39:56 AM
Fee Review-notes6/11/20036/11/20036/11/2003 DONE
Permanent occupancy  2/2/2001 DONE
Perm. Occ. Cert. #8558 issued 2-2-01 to SCP Global Technologies.
Permanent Occupancy 12/1/200012/1/2000 DONE
Details
BLD-Final11/29/200011/30/200011/30/2000APASS
DetailsRuss Owen
Jerry ###-####
Fee Review-notes12/14/199912/14/199911/27/2000 DONE
need to have final cert the values have changed many times
Temporary occupancy  11/17/2000 PART
Temp. Occ. Cert. #4081 issued 11-17-00 to SCP Global Technologies.
FIRE-Final Inspection11/15/200011/16/200011/16/2000APASS
DetailsJoe Tawney
###-#### Final OK for permanant occupancy 11/16/2000 12:56:36 PM
BLD-Final11/15/200011/16/200011/16/2000PCANC
DetailsSteven Webb
###-####: To Carl 11/16/2000 1:41:01 PM
BLD-Final11/16/200011/16/200011/16/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/16/2000 5:48:46 PM ok for t/o, complete fire insp, etc.
BLD-Framing/Rough-in9/20/20009/21/20009/21/2000APART
DetailsTom Arcoraci
###-####\\ceiling
Receive PAYMENT IN FULL  8/22/2000 DONE
BLD-Conference8/21/20008/21/20008/21/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/21/2000 w/ Dan S re resubmittal & phase 2 permit
BLD-Framing/Rough-in8/7/20008/10/20008/10/2000APART
DetailsTom Arcoraci
jerry ###-#### wip conf on exit stairs and office walls 8/11/2000 8:15:23 AM
Received Certificate of Value  7/28/2000  
RECEIVED A NEW CERTIFICATE OF VALUE TO ADD TO ORIGINAL COSTS OF PROJECT FOR CONSTRUCTION OF ADDITIONAL 151 SQ. FT. WIPEDOWN ROOM AS PART OF PROJECT. COPY TO LINDA HARTWELL.
Plan resubmittals received  7/27/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS A2.1.0X, A2.1.0, A2.1.3, A2.1.3F, A2.1.3CW, A2.1.3E. ROUTED TO DAN S. KMM
Additional plans submitted  7/27/2000 PASS
Expanded H-6 area to insclude a 151 sq. ft. wipw down room around the originally approved scissor lift location. New Certificat of value supplied - $ 5800.00 total additional estimate; $900.00-Electrical; $700.00 - mechanical; $800.00 - fire sprinklers. New sheets A2.1.0.X, A2.1.0, A2.1.3, A2.1.3AF, A2.1.3CW, A2.1.3E, A3.1, A4.1, A8.4, A9.13 - TWO COPIES APPROVED. ONE TO PLAN VAULT TO ADD TO ORIGINAL RECORDS AND ONE TO STRUCTURAL INSPECTOR CARL DEPENDAHL TO DELIVER TO JOB SITE FOR CONTRACTORS PLANS. COPY OF NEW CERTIFICATE OF VALUE GIVEN TO LINDA HARTWELL TO INCLUDE ON FINAL VALUE ANALYSIS FOR FEE'S.
BLD-Framing/Rough-in7/13/20007/14/20007/14/2000APART
DetailsCarl Dependahl
jerry ###-#### fr insp Upper layer @ tunnel corridio. South end of to continue, keep C/N's. 7/18/00 1:29:54 PM
BLD-Conference7/7/20007/7/20007/7/2000PPART
DetailsCarl Dependahl
With builder & framer: need complete copy of "MBMA" details....will consult with plan check.
BLD-Framing/Rough-in7/5/20007/6/20007/6/2000APART
DetailsCarl Dependahl
jerry ###-#### WIP rec'd add'l detail for rated walls. 7/7/00 1:35:29 PM
BLD-Framing/Rough-in6/27/20006/28/20006/28/2000AFAIL
DetailsCarl Dependahl
jerry ###-#### Cn/N: complete firestopping, need phase I eng'rs report, etc. 6/28/00 2:30:55 PM
BLD-Framing/Rough-in6/21/20006/22/20006/22/2000PPART
DetailsCarl Dependahl
JERRY-- ###-#### FR Reviewing resub. for rm. 111, walls at new corridor ok. 6/23/00 11:18:11 AM
BLD-Framing/Rough-in6/22/20006/22/20006/21/2000AFAIL
DetailsCarl Dependahl
C/N: firestops - cuts @ exist 2 hr masonry previous corrections, ok to continue wall framing. discussed exit landings w/ bldr.
BLD-Framing/Rough-in6/19/20006/19/20006/19/2000PNR
DetailsCarl Dependahl
Jerry ###-####
BLD-Framing/Rough-in6/13/20006/13/20006/13/2000PPART
DetailsJim Storey
Jerry ###-#### observed mock up of top of wall detail of assembly appears to be ok. 6/14/00 9:26:26 AM
FIRE-Conference6/6/20006/7/20006/7/2000APART
DetailsJoe Tawney
###-#### Conf. with contractor 6/7/00 4:40:11 PM
BLD-Conference6/6/20006/7/20006/7/2000APASS
DetailsCarl Dependahl
###-#### met w/ Jerry Timmons, stan of russell corp... Alan & Joe T. rec'd detail for T.O.W. wall closure ok per 104.2, but suggested continue look for alternate - ok to continue 6/19/00 11:39:22 AM
BLD-Conference6/6/20006/6/20006/6/2000PFAIL
DetailsCarl Dependahl
Awaiting arch's detail; keep C/N.
BLD-Framing/Rough-in6/1/20006/1/20006/1/2000AFAIL
DetailsCarl Dependahl
C/N re: to wall details, 1hr wall framing- recall for conf. asap.
BLD-Framing/Rough-in5/31/20005/31/20005/31/2000AFAIL
DetailsCarl Dependahl
W/architect & supt. & framer: C/N need details for top-of-wall w/references & HVAC modifications.
BLD-Framing/Rough-in5/25/20005/30/20005/30/2000AFAIL
DetailsJim Storey
###-#### resubmitals need to be sent to carl for approval of redesign and occ. wall configurations. 5/31/00 11:30:50 AM
BLD-Framing/Rough-in5/22/20005/22/20005/22/2000PPART
DetailsCarl Dependahl
###-#### ok to "1 side" walls- firestop boxes, etc. on fire walls. 5/23/00 2:34:52 PM
BLD-Framing/Rough-in5/18/20005/19/20005/19/2000ANR
DetailsTom Arcoraci
###-#### Called no ans. on phone. 5/22/00 10:53:35 AM
BLD-Framing/Rough-in4/25/20004/26/20004/26/2000APART
DetailsCarl Dependahl
###-#### Struct. steel; pending spec. insp. reports. 4/28/00 8:40:47 AM
Print Occupancy Form  4/21/2000 DONE
Telephone call  4/21/2000 DONE
talked to tony ray at ###-#### to verify plans are ready
Issue PAID IN FULL permit  4/21/2000 DONE
Routing - PLAN CHECK4/20/20004/20/20004/20/2000 PASS
Received & inserted new submittals, organized all attachments and routed to permit desk for issuance.
PLANS/APPL TAKEN TO FRONT DESK  4/20/2000 PASS
To permit desk for issuance of permit.
Plan assigned to (DRS)12/15/1999 4/20/2000 PASS
DetailsDan Stuart
4/20/2000 16:17:57 DRS - activity updated through activity BLDA022 from case BLD99-03630.
Routing - PLAN CHECK4/10/20004/10/20004/19/2000 FAIL
Began second review of plans based on new hazardous chemical quantities clarification received and upgrades to plans for hazardous type occupancy use requirements. Noted items incomplete or note responded to from previous plan review and mailed & faxed copies to Bob Bowen, ER+HDR, for re-submittal & Ben Hill, SCP Representative architect.
Plan resubmittals requested  4/19/2000  
Previous response from architect, Bob Bowen, to 2/12/00 plan review incomplete or parts not responded to at all. Faxed and mailed copies of notes indicating failure in response for him to address.
Telephone call  4/19/2000 DONE
Reviewed the remaining items in question with Bob Bowen, ER+HDR, and set up meeting for 3:30 p.m. for re-submittals.
Plan resubmittals received  4/19/2000  
Received cover letter and plans for remaining items from 2/00 plan review comments. Reviewed them with Bob Bowen & Ben Hill. Will insert changes into plans & co-ordinate all past submittals and correspondance for each set of documents and route for issuance of permit.
Routing - PLAN CHECK1/27/2000 4/7/2000 PEND
Received new plan re-submittals for structural modifications & tenant improvment modifications per plan review comments of 2/10/00. Inserted changed plans into original sets. Began re- review
Plan resubmittals received  4/7/2000 DONE
RECEIVED PLAN RESUBMITTAL FROM ER + HDR, ALSO SMALL DOUCMENTS AND STRUCTURAL CACULATIONS. 4/7/00 DAR
Plan resubmittals received  2/4/2000 DONE
PLAN RESUBMITTALS RECEIVED FROM ER + HDR, SAME FORWARDED TO DAN STUART, SPEC SHEETS AND A + M SHEETS. 2/4/00 DAR
Routing - PLUMBING1/26/2000 1/27/2000 DONE
Routing - PLUMBING1/26/20001/26/20001/26/2000  
1/26/00 - New Sheets P2 & P3 received as resubmittals. Inserted into plans. Routing back to Plumbing Plan Review. drs
Plan resubmittals received  1/21/2000  
Received plumbing plan resubmittals, P2 & P3.
Routing - PLAN CHECK1/3/20001/3/20001/15/2000 FAIL
1st preliminary plan review of project completed. Failed review. Resubmittals required. Faxed and mailed copy of plan review comments to Tony Ray, architect for project. Plans behind desk waiting for submittals. Plans had been approved conditionally by fire dept. and failed at plumbing plan review.
Plan resubmittals requested  1/15/2000 FAIL
Faxed & mailed copy of plan review comments to architect for response.
Routing - PLAN CHECK12/29/1999 1/3/2000 PEND
Picked up plans to start review process. I am corresponding W/ Floyd Varley, Hazardous occupancy review to establish requirements that will apply based on occupancy. Client / architect want review as H6 & H7. It appears based on hazardous quantities of materials that only two areas will actually require a hazardous occupancy classification - the H7 area w/i the building and a proposed free-standing premanufactured H3/H7 occupancy unit routing through the State of Idaho for approval review. The owner proposes to design as H6 so this will be the review approach used.
Routing - FIRE12/30/1999 1/3/2000 PASS
RECEIVED PLANS BACK FROM FLOYD. APPROVED WITH CONDITIONS. ROUTED PLANS BACK TO DANNY STUART. FAXED ARCH. LETTER OF APROVAL FROM FLOYD. KMM
Routing - PLUMBING12/20/1999 12/29/1999 FAIL
Routing - PUBLIC WORKS12/16/1999 12/20/1999 FAIL
SEWER FEES UNDER NEGOTIATION PER JON WILLIAMS. 12/20/99 DAR
Plan routing begun/TENANTS  12/16/1999 DONE
Route to PLANNING, PUBLIC WORKS, PLUMBING, and PLAN CHECK. A SEPARATE SET OF PLANS WAS ROUTED TO FIRE (FLOYD VARLEY).
Routing - PLANNING12/16/1999 12/16/1999 PASS
approved (no exterior work, except for mech. scrn).
Plans ACCEPTED BY PLAN TECH  12/15/1999 DONE
SPRINKLER PLANS STATE NOT FOR CONSTRUCTION. NEW ONE REQUESTED. 12/15/99 DAR
Telephone call  12/15/1999 DONE
Called Bob Bowen at ER+HDR to discuss submittals received. At meeting of 12/3/99, it was determined that an application and plans would be submitted for review & permitting for as a STRUCTURAL PERMIT; an application and plans would be submitted for the T.I. PACKAGE PERMIT and a C.V. for a separate DEMO PERMIT. Five sets of plans w/ two copies of specs were submitted w/ 1 -application and all fee's paid based on one permit. Bob Bowen to determine if the three permit process is still desired and provide separate applications & values for each. I gave him Linda Hartwells phone number to call concerning treatment of allready paid fee's. I also informed him that sheet FP1.0 & FP2.0 were marked "not for construction" and these would need to be either resubmitted without this comment or the resposnible party would need to come in and cross off this comment and initial & date each. I also gave him Bill Alexanders number for review of requirements for separate fire sprinkler review fee's for separate permit for installation & review.
Meeting  12/15/1999  
Met with Linda Hartwell to let her know what was going on with fee's for seperate permit for SCP Clean Room Project and that Bob Bowen would be calling her.
Pending Assignment by MYS12/15/1999 12/15/1999 DONE
DetailsMarlene Southard
Application received  12/14/1999  
Routing Off Site - STRUCTURAL12/15/1999 1/3/1999 PEND
Routing - PUBLIC WORKS1/20/20001/20/2000  PEND
Plans routed to Louis by D.Stuart
Recd Pcfee & Taken To Pln CK     
Inspection Record Card- Bld