Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-03639
StatusFinaled
Name SCP GLOBAL TECHNOLOGIES
Site Address 255 N STEELHEAD WAY
Project NameSCP - SUBSTRUCTURE
Customer Number 
ePlanReviewNo
Description
To construct new interior substructure for future tenant improvement for proposed R& D Cleanroom. Work to include new structural concrete pads for columns; new steel columns & beams; steel deck & designed connections. SPECIAL INSPECTION REQUIRED for Welding, Concrete, High Strength Bolting, Epoxy Anchors, Special Grading/ Excavation / & Filling, per structural engineers notes on Sheet S1.1.0 & Chapter 17 UBC. NOTE: This building is fully sprinkled. A "LETTER OF COMPLETION" REQUIRED AS CONDITION OF THIS PERMIT. PC#99-968/drs
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  12/1/2000 DONE
Letter of Compliance #20035 issued 12-1-00.
BLD-Final11/29/200011/30/200011/30/2000APASS
DetailsRuss Owen
Jerry ###-####
Fee Review-notes12/15/199912/15/199911/27/2000 DONE
BLD-Conference11/24/200011/24/200011/24/2000APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/24/2000 9:42:56 AM w/ Ben Hill SCP arch...ER-HDR won't stamp letters...consult w/ 305???
Temporary occupancy  11/17/2000 PART
Temp. Occ. Cert. #4082 issued 11-17-00 to SCP Global Technologies.
FIRE-Final Inspection11/14/200011/16/200011/16/2000ACANC
DetailsJoe Tawney
JERRY ###-#### FIRE FN Cancel To be resched to 11/16/00 11/15/2000 12:18:07 PM
BLD-Final11/14/200011/16/200011/16/2000PCANC
DetailsSteven Webb
JERRY ###-#### FN: Transfer to Carl 11/16/2000 1:40:41 PM
FIRE-Final Inspection11/15/200011/16/200011/16/2000APASS
DetailsJoe Tawney
###-#### Final OK for certificate of completion 11/16/2000 12:55:28 PM
BLD-Final11/15/200011/16/200011/16/2000PCANC
DetailsSteven Webb
###-####: To Carl 11/16/2000 1:41:43 PM
BLD-Final11/16/200011/16/200011/16/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/16/2000 5:46:53 PM need stamped eng's letter, review discrepancies. ok for t/o
Plan resubmittals received  11/7/2000 DONE
Received one copy of testing and inspection reports. routed to Dan Stuart. KMM
BLD-Framing/Rough-in10/25/200010/26/200010/26/2000AFAIL
DetailsCarl Dependahl
FR JERRY ###-#### c/n, stairs,, dampe 10/26/2000 6:05:43 PM s, etc 10/26/2000 6:05:57 PM
BLD-Footing4/18/20004/18/20004/18/2000PPART
DetailsCarl Dependahl
###-#### "Pad & ftg's". 4/19/00 9:18:30 AM
BLD-Footing4/13/20004/14/20004/14/2000AFAIL
DetailsCarl Dependahl
###-####-jerry ft
BLD-Footing4/12/20004/13/20004/13/2000APART
DetailsTom Arcoraci
###-#### Spec. insp. 4/13/00 1:04:32 PM
BLD-Conference2/14/20002/14/20002/14/2000PPASS
DetailsCarl Dependahl
REVIIEWED SPEC INSP AGREEMENT & REPORTS; PARTIAL PERMIT ONLY FOR PROJECT AT THIS TIME
BLD-Other2/3/20002/4/20002/4/2000APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/03/2000 at 09:20:49. Contact: ###-####. Met w/ eng'r & spec insp onsite (MTI) Agreement letter forthcoming. WIP ok
BLD-Footing1/24/20001/25/20001/25/2000APART
Details
Scheduled by a contractor via Hello! on 01/24/2000 at 11:37:38. Contact: ###-####. per 340 made ok to pour pending sp insp documents 1/26/00 8:06:31 AM
BLD-Footing1/20/20001/24/20001/24/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/20/2000 at 16:43:22. Contact: ###-####. c\n seal corrodor walls ok to infill need lites wired and grid 1/31/00 8:59:46 AM
Print Occupancy Form  1/20/2000 DONE
Inspection Record Card- Bld  1/20/2000 DONE
Telephone call  1/20/2000 DONE
called left message on machine gave dollar amount###-####
Issue PAID IN FULL permit  1/20/2000 DONE
Routing - PLAN CHECK1/11/20001/11/20001/19/2000 PASS
Response from architect to structural plan review clarifications & corrections received 1/10/2000. Inserted copies into original plan submittals & routed copies to outside engineering for re-review.
1/11/00 - Copy of plan review comments faxed & mailed to architect. Need the special inspection forms completed by having special inspection agency assigned and forms signed & dated - copies to go to structural inspector, Carl Dependahl.
1/19/00 - Received written approval from Howie Hennrikson, CH2M HILL, that structural review was approved based on resubmittals received. Processing for issuance of structural permit.
PLANS/APPL TAKEN TO FRONT DESK  1/19/2000 PASS
Processing for issuance of permit.
Plan assigned to (DRS)12/15/1999 1/19/2000 PASS
DetailsDan Stuart
1/19/2000 16:54:20 DRS - activity updated through activity BLDA022 from case BLD99-03639.
Routing Off Site - STRUCTURAL12/15/1999 1/18/2000 PASS
SENT PLANS TO CONSULTING STRUCTURAL ENGINEER VIA PDQ. (DAR)
1/18/00 - Received written notification from Howie Hennrikson, CH2MHILL, performing 3rd party structural review of SCP Substructure plans, that the resubmittals resolved previous concerns and that the structural data submitted and reviewed has been approved. drs
Plan resubmittals received  1/10/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM ER + HDRDRAWINGS A3.3, S2.1.3. AND S5.2.2.3, FORWARDED SAME TO DAN STUART. 1/10/00 DAR
Plan Reviewer's activity  1/3/2000  
Received report from outside structural engineering firm concerning plan review of sub-structure for SCP Global Tech. Resubmittals required from engineering & architectural detail for existing column penetrations of new interior subroof decking for review of deflection allowance. Re- Review by outside engineering required when new submittals received. Faxed copy of report to Tony Ray, ER+HDR, & Riley at Atwood-Hinzman-Jones, Structural Design Engineers for response.
Plan resubmittals requested  1/3/2000  
Report from outside engineering review of substructure for SCP Global Technologies received. Resubmittal response required concerning structural design analysis from outside third party engineering firm. Copy of report faxed and mailed to Tony Ray, ER+HDR Architects, & Riley, AHJ Design Engineers for response. Required to be submitted to outside engineering firm contracted with Boise City for additional review when response received.
Routing - PLAN CHECK12/15/199912/15/199912/15/1999 PEND
Plans routed to contracted third party outside engineering firm for review of structural design.
Recd Pcfee & Taken To Pln CK  12/15/1999 DONE
Application received  12/15/1999  
Plans ACCEPTED BY PLAN TECH  12/15/1999 PEND
Pending Assignment by MYS12/15/1999 12/15/1999 DONE
DetailsMarlene Southard
Routing Off Site - STRUCTURAL1/11/2000   PEND
SENT RESUBMITTALS TO CONSULTING STRUCTURAL ENGINEER VIA PDQ. 1/11/00 DAR