Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD99-03640
StatusFinaled
Name MICRON TECHNOLOGY PCS1529
Site Address 8000 S FEDERAL WAY
Project NameMIC #4
Customer NumberPCS 1529
ePlanReviewNo
Description
MICRON BUILDING #4 - SPLIT SITE PROCESS WATER PIPE MEZZANINE * (00-961529) TO CONSTRUCT A NEW 16' X 62' X 19' HIGH (990 SQ. FT.) STEEL FRAME PIPE MEZZANINE WITHIN BUILDING #4 BETWEEN GRID LINES 6&9 AND C&D. THIS PERMIT IS BEING MODIFIED TO INCLUDE AN 8'X33'X19' HIGH EXTENSION TO THIS PIPE MEZZANINE ON THE SOUTH END. THIS MEZZANINE SECTION WILL EXTEND 11 FEET SOUTH TO THE EXTERIOR WALL, WHERE AN OPENING WILL BE MADE IN THE EXTERIOR WALL AND THE MEZZANINE WILL EXTEND 22 FEET BEYOND THE SOUTH WALL AT THE EXTERIOR OF THE BUILDING. ALL CONSTRUCTION PER THE APPROVED PLANS. 969-99/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  1/21/2003 DONE
Letter of Compliance #22806 issued 1-21-03.
BLD-Final1/15/20031/16/20031/16/2003APASS
DetailsJim Storey
ernie ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie final ok special insp. final letter archived. 1/16/2003 10:23:07 AM
FIRE-Final Inspection1/15/20031/15/20031/15/2003PPASS
DetailsRick Jackson
Case Summary (BLD)  12/12/2002  
Print Occupancy Form  12/11/2002 DONE
Fee Review-notes12/15/199912/15/19999/11/2001 DONE
9/18 additional value from ele.
Receive PAYMENT IN FULL  5/30/2000 DONE
BLD-Framing/Rough-in4/13/20004/14/20004/14/2000AFAIL
DetailsJim Storey
###-#### recieved engineers ok for no ut insp. required for 2b seismic zon per ch 17. 4/14/00
CHANGE STATUS TO (FEE)  4/12/2000 DONE
Inspection Record Card- Bld  4/6/2000 DONE
Print Occupancy Form  4/6/2000 DONE
Telephone call  4/6/2000 DONE
e-mailed dave with micron that permit is ready
Plan assigned to (JCM)3/2/2000 4/5/2000 PASS
DetailsJohn Menard
PLAN MODIFICATION. KMM
Routing - FIRE3/30/20004/4/20004/4/2000 PASS
DetailsBill Alexander
Routing - PLAN CHECK3/4/2000 3/30/2000 PEND
Plan Reviewer's activity  3/30/2000 PASS
PLANS REVIEWED AND APPROVED AS SUBMITTED.
BLD-Framing/Rough-in3/23/20003/24/20003/24/2000ANR
DetailsJim Storey
Ernie ###-#### ernie to set up meetting with k.p. penicial engineers to resolve design change to get shop drawings to have phi jacks of mti special insp. and city approval plan.. 3/24/00 12:17:43 PM
Print Occupancy Form  3/23/2000 DONE
Receive PAYMENT IN FULL  3/22/2000 DONE
Plan Reviewer's activity  3/15/2000 PEND
FAXED THE CONSULTING ENGINEER A COPY OF THE RESPONSES FROM THE ENGINEER OF RECORD (PINNACLE ENGINEERS, INC.). THIS IS FOR THE PLAN MODIFICATION.
Plan resubmittals requested  3/8/2000 PEND
FAXED DAVE WHITE A COPY OF THE COMMENT LIST FROM THE CONSULTING ENGINEER REQUESTING REVISIONS. THESE COMMENTS ARE ON THE PROJECT MODIFICATION.
Routing - PUBLIC WORKS3/3/2000 3/3/2000 DONE
ISSUE COPY ROUTED TO PW AT THIS TIME. OFFICE COPY AT OUTSIDE ENG. KMM
PLAN MODIFICATION
Routing - PLAN CHECK  3/2/2000 DONE
Additional plans submitted  3/2/2000 DONE
RECEIVED TWO COPIES OF PLAN MODIFICATION PLANS. KMM
Plan routing begun/TENANTS  3/2/2000 DONE
PLANS MODIFICATION WILL ROUTE ISSUE COPY AS OFFICE COPY IS AT OUTSIDE ENG. KMM
Routing Off Site - STRUCTURAL3/2/2000 3/2/2000 PEND
CONTACTED PDQ TO TAKE OFFICE COPY TO OUTSIDE ENG. KMM
Plan resubmittals received  2/22/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM PINNACLE ENGINEERS, VIA MICRON TECHONOLOG, FORWARDED SAME TO JOHN MENARD. 2/22/00 DAR 3-2-2000 THES PLANS ARE MODIFICATIONS AND NOT RESUBMITTALS. KMM
Issue & PRINT FEE-DUE permit  1/27/2000 DONE
Plan assigned to (JCM)12/20/199912/20/19991/21/2000 PASS
DetailsJohn Menard
1/21/2000 10:31:26 JCM - activity updated through activity BLDA022 from case BLD99-03640.
Routing - PLAN CHECK1/20/2000 1/21/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  1/21/2000 PASS
Print Occupancy Form  1/21/2000 DONE
Inspection Record Card- Bld  1/21/2000 DONE
Telephone call  1/21/2000 DONE
actually I e-mailed them.... permit ready
Routing Off Site - STRUCTURAL12/23/1999 1/20/2000 PEND
SENT OFFICE COPY OF PLANS TO CONSULTING STRUCTURAL ENGINEER. VIA PDQ. 12/23/99 DAR
1/20/2000 received from outside eng. letter concerning structuraal plan check comments. Routed to John M. KMM
Routing Off Site - STRUCTURAL1/19/2000 1/20/2000 PEND
SENT RESUBMITTALS VIA PDQ TO CONSULTANTING ENGINEER. 1/19/00 DAR
1/20/2000 received from outside eng. letter dated 1/19/2000 concerning structural plan check review. Routed to John M. kmm
Routing - PLAN CHECK1/18/20001/18/20001/19/2000  
Plan resubmittals received  1/19/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM MICRON, FORWARDED SAME TO JOHN MENARD, SHEETS S1.1 AND S1.4. 1/19/00 DAR
Routing - FIRE1/13/20001/18/20001/18/2000 PASS
Plan Review Completed(1st rev)  1/18/2000  
Routing - PLAN CHECK12/20/1999 1/13/2000 PEND
Plan Reviewer's activity  1/12/2000 PASS
PLANS REVIEWED AND APPROVED AS DRAWN, SUBJECT TO REVISIONS REQUESTED BY THE CONSULTING STRUCTURAL ENGINEER.
Plan resubmittals requested  1/11/2000 PEND
FAXED DAVE WHITE AT MICRON A COPY OF THE COMMENT LIST FROM THE CONSULTING STRUCTURAL ENGINEER REQUESTING REVISIONS.
Routing - PUBLIC WORKS12/16/1999 12/20/1999 DONE
Application received  12/15/1999  
Pending Assignment by MYS12/15/1999    
DetailsMarlene Southard