Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD99-03673
StatusFinaled
Name CORPORATION OF THE PRESIDING
Site Address 3800 E GRAND FOREST DR
Project Name 
Customer Number 
ePlanReviewNo
Description
COLUMBIA VILLAGE LDS CHURCH * TO CONSTRUCT A 24,119 SQUARE FOOT TYPE III-1HR, FULLY FIRE SPRINKLERED SINGLE STORY ASSEMBLY BUILDING. EXTERIOR WALLS ARE MASONRY WITH INTERIOR FRAMING OF ONE-HOUR WOOD CONSTRUCTION. OTHER WORK INCLUDES SITE IMPROVEMENTS, PAVING, LANDSCAPING AND 144 SQ. FT. STORAGE SHED WITH TRASH ENCLOSURE PER APPROVED PLANS AND ATTACHMENTS. PC#983-99 ,CUP99-0005, MLO A FIRE ALARM SYSTEM IS REQUIRED FOR THIS BUILDING AND SPRINKLERS ARE USED FOR AREA INCREASE.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/11/20036/11/20036/11/2003 DONE
Fee Review-notes6/10/20036/10/20036/10/2003 DONE
(F) Reprint permit  6/28/2001 DONE
(F) Reprint permit  6/14/2001 DONE
Permanent occupancy  5/4/2001 DONE
Perm. Occ. Cert. #8667 issued 5-4-01 to Columbia Village LDS Stake.
BLD-Final5/1/20015/1/20015/1/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 05/01/2001 at 11:18:49. Contact: ###-####.
c/n on verification of smoke seal rating in corridor vs. fire rated (astricals) also need final reports from special inspections, temp. occ. signed 5/1/2001 3:50:26 PM
BLD-Final4/20/20014/23/20014/23/2001PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/20/2001 at 07:38:50. Contact: ###-####. c/n issued- 4/23/2001 4:01:15 PM
Code Occupancy Approval  4/18/2001 PASS
ALL NOTED REQUIREMENTS DONE ON CUP99-00005, I SAW NO STANDARD CONDITIONS FOR PARKING AND LANDSCAPE PROBLEMS, FINAL SIGNED OFF.
FIRE-Final Inspection4/12/20014/13/20014/13/2001APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/12/2001 at 11:49:13. Contact: .
FIRE-Alarm Testing4/12/20014/13/20014/13/2001APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/12/2001 at 11:49:58. Contact: .
Fee Review-notes12/20/199912/20/19994/9/2001 DONE
Linda they brought in the check for the complete plan check and I accepted it and told them there would still be additional fees due at the end....
BLD-Final3/28/20013/30/20013/30/2001PNR
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/28/2001 at 10:13:22. Contact: ###-####. All required sign-offs not done-will reschedule. 3/30/2001 12:41:34 PM
FIRE-Final Inspection4/2/20013/30/20013/30/2001PFAIL
DetailsRick Jackson
Added by Inspector: 409 On 4/2/2001 8:30:24 AM c/n issued
BLD-Wall cover1/18/20011/19/20011/19/2001APASS
DetailsSteven Webb
BLD-Framing/Rough-in12/6/200012/6/200012/6/2000PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 12/06/2000 at 08:53:33. Contact: ###-####. remaining corridor, conference rooms. 12/6/2000 3:57:25 PM
BLD-Framing/Rough-in11/17/200011/20/200011/20/2000APART
DetailsTony Young
Scheduled by a contractor via Hello! on 11/17/2000 at 08:44:50. Contact: ###-####.
part of interior walls ok to cover or insulate, also part of ceiling 11/20/2000 10:52:23 AM
Application received  11/19/2000 PEND
RECEIVED PLAN RESUBMITTALS FROM BILL WAITE OF RON THURBER AND ASSOCIATES, SHEETS , SD, L1, E1, AND NEW SHEET SD1.4
BLD-Framing/Rough-in10/31/200011/1/200011/1/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/31/2000 at 10:31:35. Contact: .
BLD-Framing/Rough-in10/23/200010/24/200010/24/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/23/2000 at 16:30:02. Contact: .still waiting for details for ceiling. 10/24/2000 11:55:31 AM
BLD-Framing/Rough-in10/17/200010/18/200010/18/2000ACANC
DetailsTom Arcoraci
somebody will be on site
BLD-Framing/Rough-in10/18/200010/18/200010/18/2000PPART
DetailsRuss Owen
Added by Inspector: 407 On 10/18/2000 ceiling details needed,fresh air chase,top of ext wall detail,c/n posted architect of record to address.
BLD-Framing/Rough-in10/9/200010/10/200010/10/2000ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/09/2000 at 16:14:10. Contact: .
BLD-Framing/Rough-in10/9/200010/9/200010/9/2000APART
DetailsRuss Owen
Added by Inspector: 407 On 10/9/2000 ok to cover roof decking.
BLD-Framing/Rough-in10/6/200010/9/200010/9/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/06/2000 at 12:31:12. Contact: .
BLD-Framing/Rough-in10/4/200010/5/200010/5/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/04/2000 at 12:56:40. Contact: .roof nailing 10/5/2000 4:02:49 PM
BLD-Framing/Rough-in9/29/20009/29/20009/29/2000PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 09/29/2000 at 08:53:01. Contact: .roof nail.need more. 9/29/2000 1:53:20 PM
BLD-Concrete9/5/20009/6/20009/6/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 09/05/2000 at 15:55:38. Contact: ###-####. Subject to SI. 9/6/2000 11:52:01 AM
BLD-Footing8/11/20008/11/20008/11/2000PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/11/2000 at 08:05:32. Contact: ###-####.
BLD-Concrete8/8/20008/9/20008/9/2000PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/08/2000 at 06:41:50. Contact: ###-####.
BLD-Concrete8/8/20008/8/20008/8/2000PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/08/2000 at 06:41:03. Contact: ###-####. Subject to si. 8/9/2000 8:38:47 AM
BLD-Concrete7/31/20008/2/20008/2/2000PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/31/2000 at 09:26:14. Contact: ###-####. Subject to s/i. 8/3/2000 8:14:46 AM
BLD-Concrete7/31/20007/31/20007/31/2000PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/31/2000 at 09:25:26. Contact: ###-####. subject to S-I 8/1/00 4:47:05 PM
BLD-Footing7/20/20007/21/20007/21/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/20/2000 at 13:39:33. Contact: ###-####. Subject to S-I 7/21/00 2:14:51 PM
BLD-Concrete7/17/20007/18/20007/18/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/17/2000 at 16:08:43. Contact: ###-####. Subject to SI 7/18/00 2:22:59 PM
BLD-Footing7/12/20007/13/20007/13/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/12/2000 at 13:25:22. Contact: ###-####. Subject to SI 7/14/00 9:04:05 AM
BLD-Concrete7/12/20007/13/20007/13/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/12/2000 at 13:25:59. Contact: ###-####. Subject ot SI 7/14/00 9:03:03 AM
BLD-Concrete7/6/20007/11/20007/11/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/06/2000 at 15:22:10. Contact: ###-####. Subject to SI 7/12/00 10:34:59 AM
BLD-Footing7/10/20007/11/20007/11/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/10/2000 at 16:50:25. Contact: ###-####. Subject to SI 7/12/00 10:35:07 AM
BLD-Foundation7/6/20007/7/20007/7/2000PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/06/2000 at 15:21:22. Contact: ###-####. Subject to SI 7/10/00 10:29:54 AM
BLD-Footing6/29/20006/30/20006/30/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/29/2000 at 14:25:11. Contact: ###-####. subject to S-I. 6/30/00 3:22:06 PM
BLD-Foundation6/23/20006/26/20006/26/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/23/2000 at 14:34:53. Contact: ###-####. Need SI reports, notified general contractor. 6/26/00 3:00:04 PM
BLD-Concrete6/16/20006/19/20006/19/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/16/2000 at 12:55:22. Contact: ###-####. subject to S-I 6/19/00 2:20:57 PM
BLD-Foundation6/15/20006/16/20006/16/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/15/2000 at 15:00:14. Contact: ###-####. covered under spical insp. 6/16/00 12:33:02 PM
BLD-Other6/15/20006/16/20006/16/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/15/2000 at 15:02:16. Contact: ###-####. covered under special insp. 6/16/00 12:33:17 PM
BLD-Foundation6/13/20006/14/20006/14/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/13/2000 at 16:18:46. Contact: ###-####. Subject to S-I. 6/14/00 3:34:05 PM
BLD-Footing6/9/20006/12/20006/12/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/09/2000 at 11:49:21. Contact: ###-####. subject to s/i. 6/13/00 10:03:25 AM
BLD-Footing6/8/20006/9/20006/9/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/08/2000 at 12:44:34. Contact: ###-####. s/i report pending 6/13/00 10:00:26 AM
BLD-Foundation6/5/20006/6/20006/6/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/05/2000 at 16:06:24. Contact: ###-####. Spec. insp onsite pend report 6/7/00 10:05:01 AM
BLD-Foundation6/1/20006/2/20006/2/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/01/2000 at 15:46:18. Contact: ###-####. Subject to S/I by strata 6/5/00 10:53:32 AM
BLD-Footing5/24/20005/25/20005/25/2000PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/24/2000 at 10:59:29. Contact: . Subject to S-I by Strata 5/31/00 9:14:07 AM
FIRE-Supply Line Flush5/24/20005/25/20005/25/2000AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 05/24/2000 at 13:20:04. Contact: ###-####. Need permit underground; not coated per NFPA 2Y 5/25/00 1:41:44 PM
BLD-Footing5/22/20005/23/20005/23/2000PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/22/2000 at 10:50:04. Contact: ###-####. Subject to S-I, by Strata 5/24/00 1:44:21 PM
Issue PAID IN FULL permit  4/24/2000 DONE
Plan assigned to (MLO)12/20/199912/20/19993/30/2000 DONE
DetailsMike Otto
Routing Off Site - STRUCTURAL3/22/2000 3/30/2000 PASS
CONTACTED PDQ TO TAKE RESUBMITTED SHEETS C, A3.4, S1.0 AND S2.3, RECEIVED 3/22/00 TO OUTSIDE ENG. KMM RECEIVED E-MAIL FROM ENGINEER THAT CORRECTIONS HAVE BEEN SATISFIED 3-30-00- FORMAL LETTER TO BE SENT BY 4-4-00. MLO
4/10/00 RECEIVED STRUCTURAL PLAN CHECK REVIEW FROM OUTSIDE ENG. ROUTED TO MIKE O. KMM
PLANS/APPL TAKEN TO FRONT DESK  3/30/2000 DONE
Print Occupancy Form  3/30/2000 DONE
Inspection Record Card- Bld  3/30/2000 DONE
Telephone call  3/30/2000 DONE
called Bill Waite at ###-#### permit ready for pick up and need ACHD
Plan resubmittals received  3/22/2000 FAIL
RECEIVED PLAN RESUBMITTALS FROM RONALD THURBER ANDASSOCIATES, WESCOTT EDWARDS, TWO SETS OF C, A3.4, S1.0, S2.3, FORWARDED SAME TO MIKE OTTO HAD REQUESTED THREE SETS OF REVISED PLAN SHEETS IN FAX SENT 3/20/2000. ARCHITECT CONTACTED AGAIN TO PROVIDE THIRD SET OF REVISED PLAN SHEETS. MLO
Plan resubmittals received  3/22/2000 PEND
THIRD SET OF REVISED PLANS RECEIVED MLO
Routing Off Site - STRUCTURAL3/2/2000 3/20/2000 FAIL
CONTACTED PDQ TO SEND REVISED PLANS TO OUTSIDE ENG. KMM
RECEIVED STRUCTURAL REVIEW FOR RESUBMITTAL NO. 1. ROUTED TO MIKE O. KMM CORRECTIONS FAXED TO ARCHITECT. MLO
Plan resubmittals requested  3/20/2000 FAIL
STRUCTURAL CORRECTIONS
Routing - PLAN CHECK2/28/2000 3/6/2000 PASS
Plan resubmittals received  2/25/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM RONALD THURBERS' OFFICE, BILL WAITE, SHEETSG1.2.,SD1.0A1.1,A1.3,A1.4,A2.`,A2.2,A3.1,A3.2,A3.3,A3.4,A3.5,A3.6,A4.1,A5.2, A5.3,A6.1,A6.3,A6.6, A7.1,F1.1,F3.1,S1.0,S1.1,S1.2,S1.3,S1.4,SW2.2,S2.3,S2.4,S2.5,S3.1,S3.3.-
FORWARDED SAME TO MIKE OTTO. 2/25/00 DAR
Routing - FIRE1/18/20001/26/20001/26/2000 PASS
1/19/2000 FED EXED OFFICE COPY TO FLOYD V. PER BILL A. KMM
1/28/2000 RECEIVED OFFICE COPY BACK FROM FLOYD. FAXED ARCH. APPROVED RESPONSE. KMM
1/31/2000 ROUTED OFFICE COPY BACK TO MIKE O. KMM
Plan Review Completed(1st rev)  1/26/2000  
PLANS ROUTED BACK TO PLAN CHECK
Meeting  1/21/2000 FAIL
HAD MEETING WITH ARCHITECT WENT OVER CORRECTIONS.
Plan resubmittals requested  1/19/2000 FAIL
STRUCTURAL CORRECTIONS MAILED TO ARCHITECT.
Plan resubmittals received  1/19/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS C, SD1.0, SD-1.1 ROUTED TO BILL A. KMM
Routing Off Site - STRUCTURAL12/21/1999 1/19/2000 FAIL
SENT PLANS TO CONSULTANTING ENGINEER VIA PDQ. 12/21/99 DAR
Routing - PLAN CHECK1/7/2000 1/18/2000 FAIL
CORRECTIONS MAILED TO ARCHITECT. MLO
Plan resubmittals requested  1/18/2000 FAIL
BUILDING CODE CORRECTIONS
Routing - FIRE1/6/2000 1/7/2000 FAIL
GRADING REVIEW
Routing - PLANNING1/4/2000 1/6/2000 PASS
Routing - PLUMBING12/28/1999 1/4/2000 PASS
Routing - PUBLIC WORKS12/20/1999 12/28/1999 DONE
Plans ACCEPTED BY PLAN TECH  12/20/1999  
Application received  12/20/1999  
Pending Assignment by MYS12/20/1999    
DetailsMarlene Southard
Case Summary (BLD)