Case Summary (BLD) | | | 6/23/2011 | | |
|
|
|
|
DOC - Permit Finaled | 11/25/2003 | 11/25/2003 | 11/25/2003 | A | PASS |
Tony Young
|
|
|
Finaled by inspector at 11/25/2003 11:04:53 AM
|
BLD-Conference | 11/17/2003 | 11/18/2003 | 11/18/2003 | A | PASS |
Tony Young
|
|
|
Per your telephone request
final ok after other b. permit final 11/25/2003 11:04:50 AM
|
Reopen Permit (ISS) | | | 11/17/2003 | | DONE |
|
|
|
Per Tony Young's instructions11/17/03 BAM
|
BLD-Final | 7/13/2000 | 7/13/2000 | 7/13/2000 | P | PART |
Tony Young
|
|
|
Final resinspect - Cathy has bond - Dave, ###-#### Need hand rail- need a print out of what all has been done B-4 I sign this off. This is Marco #16 with the Steelhead Hockey Team 7/14/00 8:56:35 AM
|
BLD-Conference | 5/31/2000 | 5/31/2000 | 5/31/2000 | A | PART |
|
|
|
Scheduled by Inspector: 338 On 5/31/00 with tcr on comp system 5/31/00 10:10:20 AM
|
BLD-Grading Inspection | 5/30/2000 | 5/30/2000 | 5/30/2000 | | BOND |
Rita DeYoung
|
|
|
Engineer has recommended an $1150.00 bond for fine grading, revegetation and driveway. This is acceptable and upon receipt the grading is conditionally approved.
|
BLD-Final | 5/24/2000 | 5/25/2000 | 5/25/2000 | A | FAIL |
|
|
|
###-#### Dave key above front door smoke detetors, hillside letter, completethe driveway 5/25/00 1:40:07 PM
|
BLD-Framing/Rough-in | 3/29/2000 | 3/30/2000 | 3/30/2000 | P | PART |
Russ Owen
|
|
|
###-#### call first to meet Stairs not done. 3/31/00 11:40:33 AM
|
BLD-Framing/Rough-in | 3/27/2000 | 3/27/2000 | 3/27/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### C/N 3/28/00 9:14:09 AM
|
BLD-Framing/Rough-in | 3/10/2000 | 3/13/2000 | 3/13/2000 | A | PASS |
Wes Worcester
|
|
|
###-#### Shear ok 3/24/00 1:43:58 PM
|
BLD-Framing/Rough-in | 3/9/2000 | 3/9/2000 | 3/9/2000 | P | PART |
Russ Owen
|
|
|
###-#### DAVE
|
BLD-Conference | 3/2/2000 | 3/3/2000 | 3/3/2000 | A | PART |
Russ Owen
|
|
|
###-####
|
BLD-Foundation | 1/28/2000 | 1/31/2000 | 1/31/2000 | A | FAIL |
Russ Owen
|
|
|
clay ###-#### 727585 foundation wall need three horizontals in wall per engineering 1/31/00 1:17:44 PM
|
BLD-Foundation | 1/31/2000 | 1/31/2000 | 1/31/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 10:11:35. Contact: ###-####.
|
BLD-Footing | 1/26/2000 | 1/27/2000 | 1/27/2000 | A | PART |
|
|
|
clay ###-#### ext 727585 ft insp made ok to pour lower 1/2 of footings only r-bar is placed 2/14/00 10:54:45 AM
|
BLD-Footing | 1/25/2000 | 1/26/2000 | 1/26/2000 | P | CANC |
Wes Worcester
|
|
|
clay ###-#### ext 727585--cancel
|
Plan assigned to (DJO) | 1/12/2000 | 1/12/2000 | 1/12/2000 | | PASS |
Dan Overy
|
|
|
1/12/2000 11:19:25 DJO - activity updated through activity BLDA022 from case BLD99-03699.
|
Plans ACCEPTED BY PLAN CHECK | | | 1/12/2000 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/12/2000 | | DONE |
|
|
|
|
Telephone call | | | 1/12/2000 | | DONE |
|
|
|
called permit ready and fees due.
|
Issue PAID IN FULL permit | | | 1/12/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 12/29/1999 | 12/29/1999 | 12/29/1999 | | DONE |
|
|
|
storage or bonus room must be unfinished unless approved by a separate application from the planning department. rhj
|
Routing - PUBLIC WORKS | 12/22/1999 | 12/22/1999 | 12/29/1999 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 12/22/1999 | 12/22/1999 | 12/28/1999 | | PASS |
Rita DeYoung
|
|
|
took to terry records
approved as category 3. Attached letter with conditions of approval requiring compaction testing
|
Application received | | | 12/22/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 12/29/1999 | 12/29/1999 | | | PEND |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Pending Assignment by DJO | 12/22/1999 | | | | PEND |
Dan Overy
|
|
|
|