Permit Information
Permit NumberBLD99-03720
StatusFinaled
Name CH2MHILL
Site Address 700 S CLEARWATER LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Remodeling an existing 29,125 sq. ft. two story office building per approved plans on file. Most work occurring on the first floor. Work to include accessibility upgrades (parking lot work/signage, door hardware, manuevering clearance/access into existing main floor restrooms), analysis of exiting system per the 1997 UBC, new portions of one-hour rated corridor wall with rated doors and rated windows, new interior walls with doors and windows, interior finish, suspended ceiling work, fire alarm work, removal of 2 bar sinks, some mechanical work, and some electrical work. (P.C.#1002-99) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  2/9/2005  
BLD-Final5/8/20015/9/20015/9/2001APASS
DetailsTony Young
fn occ-- ###-#### terry
BLD-Final5/9/20015/9/20015/9/2001PPASS
DetailsTony Young
###-####
ok for permanent occupancy 5/9/2001 1:51:51 PM
DOC - Permit Finaled5/9/20015/9/20015/9/2001PPASS
DetailsTony Young
Finaled by inspector at 5/9/2001 1:51:56 PM
Letter of compliance  5/9/2001 DONE
Letter of Compliance #21492 issued 5-9-01.
Fee Review-notes12/28/199912/28/19992/21/2001 DONE
BLD-Final12/27/200012/28/200012/28/2000PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 12/27/2000 at 09:01:48. Contact: ###-####. or ###-####
conference only on accessible counter, door hardware etc. 12/28/2000 2:08:06 PM
BLD-Final12/21/200012/22/200012/22/2000ACANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/21/2000 at 16:40:34. Contact: ###-####. Will call in Wed No access.... 12/22/2000 2:06:56 PM
BLD-Final12/21/200012/22/200012/22/2000ACANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/21/2000 at 16:40:34. Contact: ###-####.
FIRE-Final Inspection12/19/200012/21/200012/21/2000APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/19/2000 at 14:58:40. Contact: ###-####.
Print Occupancy Form  12/18/2000 DONE
FIRE-Final Inspection9/11/20009/12/20009/12/2000AFAIL
DetailsRick Jackson
structural is also going out Ron ###-#### rated doors in bathroom; exit signs; detectors for doors on hold opens 9/12/2000 10:04:56 AM
BLD-Final9/11/20009/12/20009/12/2000AFAIL
DetailsTony Young
fire is also going out ###-####
need trade signoffs 9/12/2000 10:12:17 AM
Print Occupancy Form  9/11/2000 DONE
BLD-Final9/7/20009/7/20009/7/2000PFAIL
DetailsTony Young
Ron ###-####
need plans and trades signed off 9/7/2000 3:06:40 PM
BLD-Framing/Rough-in7/25/20007/26/20007/26/2000APASS
DetailsTony Young
ceiling grid ###-####
done by 301 ok 8/1/2000 4:57:23 PM
BLD-Framing/Rough-in7/20/20007/21/20007/21/2000AFAIL
DetailsTony Young
ceiling grid in front lobby ###-#### C/N left 7/21/00 1:00:20 PM
BLD-Framing/Rough-in7/14/20007/14/20007/14/2000PCANC
Details
###-#### out of time 7/17/2000 11:36:31 AM
BLD-Framing/Rough-in7/11/20007/12/20007/12/2000PFAIL
DetailsTony Young
Jerry ###-#### Elec. not signed off- front entry area 7/13/00 11:29:27 AM
BLD-Framing/Rough-in7/6/20007/6/20007/6/2000PPASS
DetailsTony Young
Mike ###-#### ceiling insp please call when you go out Lunch room/ team space NE corner 7/7/00 1:33:55 PM
BLD-Framing/Rough-in7/3/20007/3/20007/3/2000PFAIL
DetailsTony Young
ceiling grid ###-#### call first items not finished on 1st c/n 7/5/00 8:37:17 AM
BLD-Framing/Rough-in6/29/20006/30/20006/30/2000PFAIL
DetailsTony Young
Terry ###-#### ceiling grid the team space northeast corner from 135 -148 and then the lunch meeting room and kitchen c/n left on ceiling pods 7/3/00 8:28:54 AM
BLD-Framing/Rough-in6/23/20006/23/20006/23/2000PPASS
DetailsJim Storey
ceiling grid insp-- terry ###-#### rm#161 &134 6/23/00 4:07:06 PM
BLD-Framing/Rough-in6/20/20006/20/20006/20/2000PPASS
DetailsTony Young
###-#### Ok to cover conference room only/need more grid tie wires. 6/21/00 11:35:31 AM
BLD-Framing/Rough-in6/12/20006/13/20006/13/2000PPART
DetailsRuss Owen
ceiling rid terry ###-#### Right side lower & floor. 6/14/00 3:32:38 PM
BLD-Framing/Rough-in6/5/20006/5/20006/5/2000PPART
DetailsTom Arcoraci
ceiling insp Terry Anderson ###-#### Grid North 1/2 upper ok, trans dept. part framing non struc. ok at door. 6/6/00 11:36:34 AM
BLD-Framing/Rough-in5/16/20005/16/20005/16/2000PPART
DetailsRuss Owen
terry-- ###-#### r/i--call 1st before insp--ceiling grid Lower floor ok, also 1/2 of upper floor. 5/17/00 1:54:50 PM
BLD-Framing/Rough-in5/12/20005/15/20005/15/2000PPART
DetailsJim Storey
terry---###-#### ceiling grid----call 1st before insp===1 pod and spreader bars in library. 5/15/00 3:26:52 PM
BLD-Framing/Rough-in5/10/20005/11/20005/11/2000ACANC
DetailsTom Arcoraci
grid ceiling Terry Anderson ###-#### Unable to find called left message on phone. 5/12/00 8:46:49 AM
BLD-Framing/Rough-in5/4/20005/4/20005/4/2000PFAIL
DetailsRuss Owen
ceiling grid Jerry Anderson ###-#### C/n posted 5/5/00 10:15:41 AM
BLD-Other5/1/20005/1/20005/1/2000ANH
DetailsRuss Owen
No one there, left C/N to recall.
BLD-Framing/Rough-in4/19/20004/20/20004/20/2000AFAIL
Details
Scheduled by a contractor via Hello! on 04/19/2000 at 11:19:55. Contact: . done by 407 04/24/2000 7:24:41 AM
BLD-Framing/Rough-in4/20/20004/20/20004/20/2000PPART
DetailsRuss Owen
###-#### 1-A and 1-B areas on first floor ok to sheetrock. 4/21/00 9:28:14 AM
BLD-Framing/Rough-in4/18/20004/19/20004/19/2000ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/18/2000 at 13:12:16. Contact: .
Issue PAID IN FULL permit  3/20/2000 DONE
Telephone call  2/29/2000 DONE
talked to justin to verify plans are ready
Routing - FIRE2/23/20002/28/20002/28/2000 PASS
DetailsBill Alexander
Plan assigned to (JCB)12/29/1999 2/28/2000 PASS
DetailsJason Blais
Plan Review Completed(1st rev)  2/28/2000 PASS
DetailsBill Alexander
Routing - PLAN CHECK2/28/2000 2/28/2000 PASS
Plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  2/28/2000  
Inspection Record Card- Bld  2/28/2000 DONE
Print Occupancy Form  2/28/2000 DONE
Print Occupancy Form  2/28/2000 DONE
Routing - PLANNING2/17/2000 2/23/2000 PASS
Approved by Design Review and s.spjute
Routing - PLAN CHECK1/4/1999 2/17/2000 PEND
Permit approval dependant on Planning and Fire Dept. approval. Plans routed to Planning and Fire.
Application received  2/14/2000 PEND
Plan resubmittals received  2/14/2000 DONE
PLAN RESUBMITTALS AND A NEW CERTIFICATE OF VALUE RECEIVED FROM WALTER LINDGREN, FORWARDED SAME TO JASON BLAIS. 2/14/00 DAR
Meeting  2/2/2000  
Met with Walt Lindgren and representative for CH2MHILL on accessibility upgrade requirements and discussed when resubmittals would be submitted.
Meeting  1/12/2000  
Met with Walt Lindgren, architect representative, on several issues for this project. Preliminary review suggests immediate resubmittal drawings needed prior to a formal review being done. Mr. Lindgren agreed and said it would be taken care of. Awaiting resubmittal drawings.
Routing - PUBLIC WORKS12/30/1999 1/4/2000 DONE
Telephone call  1/3/2000 DONE
RECEIVED CALL FROM WALTER ABOUT SHEET A2. BEV IN PW WILL HOLD PLANS UNTIL I RECEIVE SHEET A2 WHICH WILL THEN BE ROUTED TO HER. THIS WAY I WILL NOT STAMP AS RESUB, BUT ROUTE TO HER AND INSERT INTO PLANS. TO GET PW'S APROVAL. WALTER THOUGHT PLANS WILL BE HERE BY 1.4.2000 KMM
Pending Assignment by MYS12/28/1999 12/29/1999 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  12/29/1999 DONE
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  12/28/1999 DONE
Plans not fully dimensioned. Sent letter to Walter Lindgren. kmm
Received Certificate of Value  12/28/1999 PASS
Application received  12/28/1999