DOC - Permit Finaled | 1/23/2001 | 1/23/2001 | 1/23/2001 | P | PASS |
Mike Kinnear
|
|
|
Added by Inspector: 412 On 1/23/2001 1:52:34 PM
|
Final | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | PASS |
Jack Frank
|
|
|
###-#### ok 4/25/00
|
Final | 4/21/2000 | 4/21/2000 | 4/21/2000 | P | PASS |
Jack Frank
|
|
|
###-#### ok corrections made 4/24/00
|
Final | 4/20/2000 | 4/20/2000 | 4/20/2000 | P | FAIL |
Jack Frank
|
|
|
TONYA --###-#### FN 370-16 boxes island counter called no answer 4/21/00
|
Receive PAYMENT IN FULL | | | 3/9/2000 | | DONE |
|
|
|
|
Electrical Rough-In | 2/23/2000 | 2/24/2000 | 2/24/2000 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 02/23/2000 at 12:59:31. Contact: ###-####. R/I ok cover. 2/24/00 11:52:55 AM
|
Electrical Rough-In | 2/22/2000 | 2/23/2000 | 2/23/2000 | A | FAIL |
Mike Kinnear
|
|
|
###-#### NEC 300-4 (d). Reinspection fee $42.00. 2/23/00 2:20:26 PM
|
Electrical Rough-In | 2/22/2000 | 2/22/2000 | 2/22/2000 | P | FAIL |
Mike Kinnear
|
|
|
###-#### if there is a problem call this # P/S U/G N ok, R/I corrections posted NEC 300-4 (d) call contractor. 2/23/00 11:25:12 AM
|
Application received | | | 2/14/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/14/2000 | | DONE |
|
|
|
|