DOC - Permit Finaled | 5/17/2001 | 5/17/2001 | 5/17/2001 | A | PASS |
Jack Frank
|
|
|
Added by Inspector: 315 On 5/17/2001 10:34:55 AM
|
Final | 6/13/2000 | 6/13/2000 | 6/13/2000 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 06/13/2000 at 10:31:51. Contact: ###-####. Completed. Does not include canopy- seperate permit. 6/14/00 8:57:10 AM
|
Final | 5/17/2000 | 5/18/2000 | 5/18/2000 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 05/17/2000 at 12:15:47. Contact: ###-####. Canopy Ele. R/I; corrections completed. Received letter from Lithonia lighting by Tom K. Baughman support mngr. meet NEC code 1999 fixture requirements installation. 5/18/00 3:14:00 PM
|
Electrical Rough-In | 5/16/2000 | 5/16/2000 | 5/16/2000 | P | FAIL |
Mike Kinnear
|
|
|
cover inspection ###-#### Conf. strapping of raceway- box fill & fixture temp. under drive thru. 5/17/00 1:45:27 PM
|
Final | 4/26/2000 | 4/27/2000 | 4/27/2000 | A | PART |
Marv Burrus
|
|
|
on the inside of the bank only Kathy ###-#### Temp. occ. 4/28/00 9:19:27 AM
|
Final | 4/24/2000 | 4/25/2000 | 4/25/2000 | A | FAIL |
Marv Burrus
|
|
|
this is for a temp occ cathy ###-#### Not ready\ 4/26/00 11:39:22 AM
|
Final | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | FAIL |
Marv Burrus
|
|
|
Not ready for temp. occ., will reschedule.
|
Electrical Rough-In | 4/19/2000 | 4/20/2000 | 4/20/2000 | A | PART |
Marv Burrus
|
|
|
###-#### Partial ceiling Ele. R/I 4/21/00 8:58:15 AM
|
Electrical Rough-In | 4/18/2000 | 4/18/2000 | 4/18/2000 | P | PART |
Marv Burrus
|
|
|
ceiling ###-#### Ceiling Ele. R/I 4/19/00 9:14:16 AM
|
Receive PAYMENT IN FULL | | | 4/11/2000 | | DONE |
|
|
|
|
Electrical Rough-In | 3/28/2000 | 3/29/2000 | 3/29/2000 | A | PART |
Marv Burrus
|
|
|
Alex ###-#### East & South walls Ele. R/I 3/29/00 12:01:42 PM
|
Electrical Rough-In | 3/27/2000 | 3/28/2000 | 3/28/2000 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 03/27/2000 at 15:33:14. Contact: ###-####. 370-Box fill- 250-148 grounding in boxes, 336- over 360 deg. in a ripe run 3/29/00 10:13:12 AM
|
Electrical Rough-In | 3/23/2000 | 3/24/2000 | 3/24/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 03/23/2000 at 15:49:49. Contact: ###-####. Bank remodel Ele. R/I; walls, floor recepticles 3/24/00 11:53:08 AM
|
Application received | | | 3/1/2000 | | |
|
|
|
|
Issue & PRINT FEE-DUE permit | | | 3/1/2000 | | DONE |
|
|
|
|