Permit Information
Permit NumberELE00-01560
StatusFinaled
Name MTN POWER ELECT CONTR
Site Address 200 W FRONT ST
Project NameCOURTHOUSE-SHELL/CORE
Customer Number 
ePlanReview 
Description
all electrical per approved plan final certificate of value $1,500,000.00 1/8/02-final cert lh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final2/28/20023/1/20023/1/2002APASS
DetailsMarv Burrus
###-####. completed, 2/28/2002 3:55:02 PM
DOC - Permit Finaled2/28/20022/28/20022/28/2002PPASS
DetailsMarv Burrus
Finaled by inspector at 2/28/2002 3:55:09 PM
Override - Parcel Holds  2/28/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. (11/21/2001-Carol Cherry) Reason for OverRide:
Override - Parcel Holds  2/28/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. (11/21/2001-Carol Cherry) Reason for OverRide:
Electrical Rough-In1/30/20021/31/20021/31/2002APASS
DetailsMarv Burrus
###-#### CONFERENCE. completions necessary for final. 1/31/2002 9:57:39 AM
Final12/20/200112/21/200112/21/2001APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 12/20/2001 at 18:12:47. Contact: ###-####. building; temporary occupancy only. 12/21/2001 12:54:53 PM
Final12/19/200112/20/200112/20/2001APART
DetailsMarv Burrus
###-#### DAVE. 1st floor; 5th floor, area 1. temporary occupancy. 12/20/2001 4:20:09 PM
Final12/18/200112/19/200112/19/2001PCANC
DetailsMarv Burrus
DAVE ###-####. kitchen knook area r/i. 12/19/2001 11:26:19 AM--cancel per marv/wrong insp/mls12/19/01
Final12/19/200112/19/200112/19/2001PPART
DetailsMarv Burrus
12/19/2001 12:00:07 PM. 5th floor; area 2: judges chambers, courtrooms temporary occupancy. 12/19/2001 2:45:26 PM
Override - Parcel Holds  12/19/2001 DONE
DetailsAnnett Moore
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. Reason for OverRide: FINAL INSPECT
Final12/18/200112/18/200112/18/2001PPART
DetailsMarv Burrus
###-####. 4th floor; areas 3 and 4. judges chambers, lobby;s. 12/18/2001 2:10:39 PM
Final12/17/200112/18/200112/18/2001APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 12/17/2001 at 10:34:21. Contact: ###-####.. 4th floor; areas 1 and 2; judges chambers, courtrooms. 12/18/2001 10:22:22 AM
Override - Parcel Holds  12/18/2001 DONE
DetailsRita DeYoung
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. Reason for OverRide:
Override - Parcel Holds  12/18/2001 DONE
DetailsRita DeYoung
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. Reason for OverRide:
Override - Parcel Holds  12/18/2001 DONE
DetailsDarla L Downs
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. Reason for OverRide: THIS IS JUST FOR ELE FINAL
Final12/14/200112/17/200112/17/2001APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 12/14/2001 at 15:58:37. Contact: ###-####. areas #3 and 4, third floor; offices, restrooms, equiptment rooms and hall corridor. temporary occupancy. 12/17/2001 10:12:05 AM
Final12/13/200112/14/200112/14/2001PPART
DetailsMarv Burrus
###-#### DAVE. 3rd floor; areas 3 and 4, temporary occupancy. 12/14/2001 3:07:39 PM
Final12/12/200112/13/200112/13/2001APART
DetailsMarv Burrus
###-#### DAVE. 2nd floor; areas 3 and 4. 12/13/2001 10:58:07 AM
Override - Parcel Holds  12/13/2001 DONE
DetailsRita DeYoung
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. Reason for OverRide:
Override - Parcel Holds  12/13/2001 DONE
DetailsRita DeYoung
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. Reason for OverRide: THIS HOLD IS FOR THE FINAL ON THE BLD#
Final12/11/200112/12/200112/12/2001APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 12/11/2001 at 07:02:52. Contact: .
2nd floor: courtrooms and judges chambers.
12/12/2001 10:56:03 AM
Override - Parcel Holds  12/12/2001 DONE
DetailsAnnett Moore
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. Reason for OverRide: FINAL ELECTRICAL
Final12/6/200112/10/200112/10/2001ACANC
DetailsMarv Burrus
###-#### dave. contractors request. will reschedule. 12/10/2001 9:28:24 AM
Electrical Rough-In12/5/200112/6/200112/6/2001PPART
DetailsMarv Burrus
###-#### DAVE. 1st floor; east/west corridor ceiling r/i. 2nd, 3rd, 4th floor elevator lobby ceiling r/i. 12/6/2001 2:35:32 PM
Override - Parcel Holds  12/6/2001 DONE
DetailsAnnett Moore
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. Reason for OverRide: final electrical inspect
Override - Parcel Holds  12/5/2001 DONE
DetailsAnnett Moore
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. Reason for OverRide: ELECT. ROUGH
Electrical Rough-In11/21/200111/26/200111/26/2001PPASS
DetailsMarv Burrus
###-#### DAVE. 5th floor; ceiling r/i, lobby and corridorl. 11/26/2001 2:24:24 PM
Override - Parcel Holds  11/21/2001 DONE
DetailsAnnett Moore
Parcel Tag Notes: Prior to issuance of a temporary or final occupancy permit for the first tenant, the parking structure shall be completed. Per Tempra K. Wilson X3836. Reason for OverRide: ELEC. ROUGH INSPECT
Electrical Rough-In11/14/200111/15/200111/15/2001APASS
DetailsMarv Burrus
###-#### DAVE. 1st. floor: front lobby ceiling r/i. 3rd floor; computer room ceiling r/i. 4th floor corridor ceiling r/i. ok. 11/15/2001 9:12:02 AM
Override - Parcel Holds  11/14/2001 DONE
DetailsDarla L Downs
Parcel Tag Notes: Prior to issuance of a temporary or final occupancy permit for the first tenant, the parking structure shall be completed. Per Tempra K. Wilson X3836. Reason for OverRide: THIS IS FOR A ELE INSPECTION
Final11/5/200111/6/200111/6/2001PCANC
DetailsMarv Burrus
###-#### dave. request should be for r/i. 11/6/2001 2:23:12 PM
Electrical Rough-In11/6/200111/6/200111/6/2001PPASS
DetailsMarv Burrus
Added by Inspector: 403 On 11/6/2001 2:24:40 PM 3rd floor corridor ceiling r/i; 5th floor courtrooms ceiling r/i.
Override - Parcel Holds  11/5/2001 DONE
DetailsAnnett Moore
Parcel Tag Notes: Prior to issuance of a temporary or final occupancy permit for the first tenant, the parking structure shall be completed. Per Tempra K. Wilson X3836.
Electrical Rough-In11/1/200111/2/200111/2/2001APART
DetailsMarv Burrus
###-####. basemnt. corridor ceiling r/i; 2nd floor corridor ceiling r/i; 2nd floor; mock courtroom ceiling r/i, corrections completed. 11/2/2001 9:36:35 AM
Electrical Rough-In10/31/200111/1/200111/1/2001AFAIL
DetailsMarv Burrus
DAVE ###-#### STAND BY GENERATOR .
no testing laboratory label. field evaluation testing required. corrections posted, 'not approved' red tag applied. 11/1/2001 1:39:09 PM
Override - Parcel Holds  11/1/2001 DONE
DetailsRita DeYoung
Parcel Tag Notes: Prior to issuance of a temporary or final occupancy permit for the first tenant, the parking structure shall be completed. Per Tempra K. Wilson X3836.
Electrical Rough-In10/30/200110/31/200110/31/2001APART
DetailsMarv Burrus
###-#### DAVE. 1st floor; wood-counter reception desks r/i. 4th floor ceiling r/i; judges chambers, hallways reception areas. 10/31/2001 10:59:35 AM
Override - Parcel Holds  10/31/2001 DONE
DetailsAnnett Moore
Parcel Tag Notes: Prior to issuance of a temporary or final occupancy permit for the first tenant, the parking structure shall be completed. Per Tempra K. Wilson X3836.
Override - Parcel Holds  10/30/2001 DONE
DetailsAnnett Moore
Parcel Tag Notes: Prior to issuance of a temporary or final occupancy permit for the first tenant, the parking structure shall be completed. Per Tempra K. Wilson X3836.
Final10/22/200110/23/200110/23/2001PPART
DetailsMarv Burrus
###-#### DAVE . 4th floor courtrooms ceiling r/i, ok. 10/23/2001 2:19:49 PM
Override - Parcel Holds  10/22/2001 DONE
DetailsAnnett Moore
Parcel Tag Notes: Prior to issuance of the first tenant improvement building permit, the design review application for the parking structure to the east of the courthouse buildings shall have been submitted. Prior to issuance of a temporary or final occupancy permit for the first tenant, the parking structure shall be completed. Per Tempra K. Wilson X3836.
Electrical Rough-In10/16/200110/18/200110/18/2001APASS
DetailsMarv Burrus
###-#### DAVE. 3rd floor ceiling r/i, except corridor and lobbyl 10/18/2001 10:59:03 AM
Override - Parcel Holds  10/16/2001  
Electrical Rough-In10/11/200110/12/200110/12/2001APART
DetailsMarv Burrus
###-#### JOSH. 5th floor eastend courtroom; raised floor r/i. 10/12/2001 9:02:03 AM
Electrical Rough-In10/10/200110/11/200110/11/2001APASS
DetailsMarv Burrus
###-#### JOSH. conference; grid-wire support, recessed fixtures. 10/11/2001 9:07:53 AM
Override - Parcel Holds  10/11/2001  
Override - Parcel Holds  10/10/2001 DONE
DetailsDarla L Downs
Parcel Tag Notes: Do not issue permits for CUP01-120. The appeal period ends 10/11/01 @5:00pm. Questions call Dave 3743 or Carol 3838.
Electrical Rough-In10/8/200110/8/200110/8/2001PFAIL
DetailsJim Schmer
###-#### second floor ceiling Correction, low voltage wiring attached to conduit & west end court room covered without inspection- UNCOVER. 10/8/2001 11:57:44 AM
Override - Parcel Holds  10/8/2001  
Electrical Rough-In10/1/200110/1/200110/1/2001PPASS
DetailsMarv Burrus
5th floor courtroom ###-####. raised floor area r/i. 10/1/2001 3:42:15 PM
Electrical Rough-In9/25/20019/26/20019/26/2001APASS
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 09/25/2001 at 10:20:00. Contact: ###-####. 1st floor; commissioner hearing room, raised floor and ceiling r/i. 4th floor; courtroom eastend, raised floor r/i. 5th floor westend courtroom raised floor r/i. 9/26/2001 9:37:52 AM
Electrical Rough-In9/20/20019/21/20019/24/2001PPASS
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 09/20/2001 at 12:54:14. Contact: ###-####. 9/21/2001 3:19:48 PM. 1st floor; ceiling r/i, areas #1,2,3,&4. 9/24/2001 9:34:10 AM
Electrical Rough-In9/14/20019/17/20019/17/2001APART
DetailsMarv Burrus
###-#### JOSH. bonding of fountail 9/17/2001 9:27:00 AM
Electrical Rough-In9/10/20019/11/20019/11/2001PPART
DetailsMarv Burrus
484- 3156. stairtowers, east and westend r/i.

9/11/2001 11:38:39 AM
Electrical Rough-In9/6/20019/6/20019/6/2001PPART
DetailsMarv Burrus
for conf-- josh- ###-####- . checked fountain testing-laboratory listing. ok 9/6/2001 2:03:51 PM
Electrical Rough-In8/24/20018/27/20018/27/2001APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 08/24/2001 at 17:00:25. Contact: ###-####. .2nd floor; bathrooms, shower area-eastend. 8/27/2001 10:59:23 AM
Electrical Rough-In8/21/20018/21/20018/21/2001PPASS
DetailsMarv Burrus
cell ###-####- josh for conf. conference:
4th floor court-room raised floor covering, area #1. 8/21/2001 10:52:59 AM
Electrical Rough-In8/17/20018/20/20018/20/2001APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 08/17/2001 at 10:28:20. Contact: ###-####. areas #1 and 2; corridors, lobby, vestibules ceiling r/i 2nd floor thru 5th floors.
areas #1 and 2; courtrooms decking/flooring r/i except area #1, 4th floor (raised floor was covered). 8/20/2001 11:35:20 AM
Electrical Rough-In8/7/20018/8/20018/8/2001PPART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 08/07/2001 at 15:18:47. Contact: ###-####. basement: 3 elevator lobby's, ceiling hard-lid; exterior soffit light r/i. 1st floor: retail lease area ceiling hard-lid r/i. 8/8/2001 2:22:32 PM
Electrical Rough-In7/30/20018/1/20018/1/2001PPART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 07/30/2001 at 15:16:20. Contact: ###-####. 1st floor: areas 2 & 3. 2nd floor: area 3 and court room, ceiling r/i only. 8/1/2001 2:16:23 PM
Electrical Rough-In7/30/20017/30/20017/30/2001PFAIL
DetailsJim Schmer
Josh ###-#### couldn't find work, josh didn't answere phone, called 3 times 7/30/2001 1:22:44 PM
Electrical Rough-In6/4/20016/5/20016/5/2001PPART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 06/04/2001 at 13:27:53. Contact: .
4th floor: area '4' r/i. ok.
6/5/2001 1:57:59 PM
Electrical Rough-In5/7/20015/8/20015/8/2001PPART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 05/07/2001 at 13:32:07. Contact: .
4th floor; area '3'. walls ele r/i.
5/8/2001 2:09:51 PM
Electrical Rough-In4/30/20015/2/20015/2/2001PPART
DetailsMarv Burrus
Josh ###-####. 5th floor; areas'1 & 2, walls ele r/i. 5/2/2001 3:09:12 PM
Electrical Rough-In4/25/20014/27/20014/27/2001PPART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 04/25/2001 at 14:18:20. Contact: .
basement: hard-lid ceiling ele r/i. 4/27/2001 1:40:13 PM
Electrical Rough-In4/9/20014/10/20014/10/2001APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 04/09/2001 at 11:53:33. Contact: .
3rd floor, area 'e'; bathrooms, ele r/i. 4/10/2001 11:15:14 AM
Electrical Rough-In4/5/20014/9/20014/9/2001APART
DetailsMarv Burrus
###-####. 3rd floor: areas3 & 4. ele r/i, walls.
shall strap cable within 12 inches of boxes, (area 3 only). 4/9/2001 9:46:01 AM
Electrical Rough-In3/27/20013/28/20013/28/2001APART
DetailsJack Frank
josh Miller ###-#### ok 3/28/2001 11:50:12 AM
Electrical Rough-In3/26/20013/27/20013/27/2001APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 03/26/2001 at 12:58:08. Contact: . area 3, 2nd floor only corrections area 4, 2nd floor and area 4 ,1st floor 300-4 and strap within 12 inches of boxes 3/27/2001 10:25:15 AM
Electrical Rough-In2/28/20013/1/20013/1/2001APART
DetailsMarv Burrus
###-####. 1st floor: area'e'. walls ele r/i. ok 3/1/2001 11:29:31 AM
Electrical Rough-In1/18/20011/23/20011/23/2001APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 01/18/2001 at 13:31:04. Contact: .
areas #1 & 2; 3rd and 4th floors, walls ele r/i. 1/23/2001 10:51:42 AM
Electrical Rough-In12/12/200012/13/200012/13/2000APART
DetailsMarv Burrus
on the second floor DAve ###-####. 2nd floor, areas 1and2; walls ele r/i. 12/13/2000 11:12:47 AM
Electrical Rough-In11/13/200011/15/200011/15/2000APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 11/13/2000 at 11:48:06. Contact: ###-####. areas 1 & 2, first floor ele r/i. 11/15/2000 9:29:38 PM
Electrical Rough-In9/27/20009/27/20009/27/2000PPART
DetailsMarv Burrus
R/I DAVE -###-#### . sub-panel disconnect for crane/elevator. 9/27/2000 10:30:10 PM
Electrical Rough-In9/20/20009/21/20009/21/2000APART
DetailsMarv Burrus
###-#### conf only \\8:00 or 8:30 he says he talked to you about the time. proper grounding of mc/ac cable. 9/22/2000 5:03:52 PM
Permanent Service9/18/20009/18/20009/18/2000PPASS
DetailsMarv Burrus
###-####. main service gear. 9/18/2000 5:48:50 PM
Electrical Rough-In9/7/20009/8/20009/8/2000APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 09/07/2000 at 14:11:34. Contact: . conference; branch-circuit raceway use. 9/10/2000 6:02:54 PM
Electrical Rough-In8/31/20009/5/20009/5/2000APART
DetailsMarv Burrus
conference after 10:00 Mike ###-####. discussed clearences for bus-ducting. 9/5/2000 12:57:00 PM
Electrical Rough-In7/7/20007/10/20007/10/2000APART
DetailsMike Kinnear
Josh ###-#### Ok cover floor NW corner 7/10/00 2:51:45 PM
Electrical Rough-In6/8/20006/9/20006/9/2000APART
DetailsMarv Burrus
Josh ###-#### conference, grounding/ufer
Electrical Rough-In5/22/20005/22/20005/22/2000PPASS
DetailsMike Kinnear
underground ###-#### Ok cover underground main feeders conduit 5/23/00 2:28:35 PM
Receive PAYMENT IN FULL  5/8/2000 DONE
Electrical Rough-In5/3/20005/3/20005/3/2000PPART
DetailsMarv Burrus
for conf-- ###-#### Conference; main service grounding. 5/4/00 4:52:45 PM
Application received  5/2/2000  
Issue & PRINT FEE-DUE permit  5/2/2000 DONE