Final | 12/9/2011 | 12/12/2011 | 12/12/2011 | A | PASS |
Bob Reichert
|
|
|
nina please call before going out Phone #: ###-#### corrections made per owner stating 445 checked all rest, ok final
|
Final | 12/7/2011 | 12/7/2011 | 12/7/2011 | P | NR |
Daryl DeGrange
|
|
|
###-#### Nina leary-Please call at least 30 mins prior to inspection
|
Change Status to I | | | 12/7/2011 | | DONE |
Barbara Stitt
|
|
|
Re-open per Bob Archibald fees paid on BLD00-02990
|
ELE-Request for Extension | 10/4/2005 | 10/5/2005 | 10/5/2005 | A | PASS |
Jim Schmer
|
|
|
###-#### nina - Nina said that they plan on getting house done by end of this month. There is to be no more extensions for this permit, if it expires they will have to get a new permit. - JMS
|
Electrical Rough-In | 10/4/2005 | 10/4/2005 | 10/4/2005 | P | PASS |
Pat Lass
|
|
|
nena; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles R/I OK
|
Electrical Rough-In | 9/28/2005 | 9/29/2005 | 9/29/2005 | P | NR |
Bob Reichert
|
|
|
nina; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles made wrong corrections on isolate gnd and neut (did in main panel, not sub) need 1 1/4", stapling, light boxes wired, subpanel fixed, accessibility to ground wire and fur out below panels, adding jacuzzi tub, but it is not yet framed in, need to count rooms for permit, met with owner and they wrote items to fix before inspection for ri.
|
Final | 1/4/2005 | 1/4/2005 | 1/4/2005 | P | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 1/4/2005 at 7:24:35 AM. Contact: ###-####.
isolate neutral in sub panel
protect energized parts 1/4/2005 2:17:59 PM
|
Conference | 12/19/2004 | 12/20/2004 | 12/20/2004 | A | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 12/19/2004 at 1:10:52 PM. Contact: ###-####.
|
Permanent Service | 12/20/2004 | 12/20/2004 | 12/20/2004 | A | PASS |
Jim Schmer
|
|
|
p/s u/g new - changing from o/h to u/g - jms 12/20/2004 9:13:06 AM
|
Electrical Rough-In | 12/17/2004 | 12/17/2004 | 12/17/2004 | P | CANC |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 12/17/2004 at 8:35:12 AM. Contact: ###-####.
|
Electrical Rough-In | 12/6/2004 | 12/6/2004 | 12/6/2004 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/6/2004 at 7:36:44 AM. Contact: ###-####.
had conf about service 12/6/2004 8:59:52 PM
|
ELE-Request for Extension | 10/26/2004 | 10/27/2004 | 10/27/2004 | A | PASS |
Jim Schmer
|
|
|
still working on this project///nina ###-####
|
Electrical Rough-In | 5/5/2004 | 5/6/2004 | 5/6/2004 | A | PART |
Jack Frank
|
|
|
please ring door bell and talk to nina///###-#### nina electrode ok for dirt cover and conference ok 5/6/2004 9:17:50 AM
|
Change Status to I | | | 5/5/2004 | | DONE |
|
|
|
per pat's inspection approval to extend on 4/29/04
|
ELE-Request for Extension | 4/29/2004 | 4/29/2004 | 4/29/2004 | P | PART |
Pat Lass
|
|
|
NINA ###-####
ok to extend 4/29/2004 10:41:01 AM
|
Electrical Rough-In | 11/12/2003 | 11/12/2003 | 11/12/2003 | P | PART |
Pat Lass
|
|
|
NINA INSPECT COPPER GROUND WIRE BEFORE CEMENT POUR ###-####; Phone #: ###-#### Internet Inspection Request from: Annette Moore
ok for concrete 11/12/2003 12:11:36 PM
|
Electrical Rough-In | 11/6/2003 | 11/7/2003 | 11/7/2003 | A | NR |
Pat Lass
|
|
|
Nina; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
nobody home no work done 11/7/2003 10:28:11 AM
|
Rough-In Permanent Service | 10/28/2003 | 10/29/2003 | 10/29/2003 | A | NH |
Joe Ray
|
|
|
###-#### Nina not home /no work started/called left message on machine 10/29/2003 8:54:54 AM
|
Electrical Rough-In | 10/29/2003 | 10/29/2003 | 10/29/2003 | P | NR |
Pat Lass
|
|
|
nina; Phone #: ###-#### Internet Inspection Request from: Annette Moore
concrete encased electrode not ready 10/29/2003 3:32:48 PM
|
Extend Permit 180 days | | 10/28/2003 | 10/28/2003 | | DONE |
|
|
|
per Jim's notes on 9/3/03
|
ELE-Request for Extension | 9/2/2003 | 9/3/2003 | 9/3/2003 | A | PASS |
Pat Lass
|
|
|
###-#### nina
extend permit 9/3/2003 8:54:14 AM
|
Permanent Service | 3/24/2003 | 3/25/2003 | 3/25/2003 | P | NR |
Pat Lass
|
|
|
###-####
Had conf COW 3/25/2003 2:54:31 PM
|
ELE-Request for Extension | 3/24/2003 | 3/24/2003 | 3/24/2003 | P | NR |
Pat Lass
|
|
|
###-#### nina
extend permit 3/24/2003 11:46:13 AM
|
Electrical Rough-In | 9/16/2002 | 9/16/2002 | 9/16/2002 | A | NR |
Pat Lass
|
|
|
CONFERENCE FOR EXTENSION ###-#### NINA
|
PostCard Mailed | | | 9/13/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 9/13/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
Temporary Service | 8/15/2002 | 8/16/2002 | 8/16/2002 | A | CANC |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/15/2002 at 15:42:42. Contact: ###-#### SHOULD HAVE BEEN SERVICE R/I...DLD
|
Rough-In Permanent Service | 8/16/2002 | 8/16/2002 | 8/16/2002 | A | CANC |
Joe Ray
|
|
|
###-#### 8/16/2002 9:34:44 AM
|
Electrical Rough-In | 2/14/2002 | 2/15/2002 | 2/15/2002 | A | PART |
Marv Burrus
|
|
|
THIS IS TO EXTEND THE PERMIT\\###-####
|
Miscellaneous action | | | 4/26/2001 | | DONE |
|
|
|
homeowner called in extend permit for 180 days
|
Application received | | | 10/4/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/4/2000 | | DONE |
|
|
|
|