Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberELE00-03899
StatusFinaled
Name LEARY JOHN M AND
Site Address 3918 N WHITEHEAD ST
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final12/9/201112/12/201112/12/2011APASS
DetailsBob Reichert
nina please call before going out Phone #: ###-#### corrections made per owner stating 445 checked all rest, ok final
Final12/7/201112/7/201112/7/2011PNR
DetailsDaryl DeGrange
###-#### Nina leary-Please call at least 30 mins prior to inspection
Change Status to I  12/7/2011 DONE
DetailsBarbara Stitt
Re-open per Bob Archibald fees paid on BLD00-02990
ELE-Request for Extension10/4/200510/5/200510/5/2005APASS
DetailsJim Schmer
###-#### nina - Nina said that they plan on getting house done by end of this month. There is to be no more extensions for this permit, if it expires they will have to get a new permit. - JMS
Electrical Rough-In10/4/200510/4/200510/4/2005PPASS
DetailsPat Lass
nena; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
R/I OK
Electrical Rough-In9/28/20059/29/20059/29/2005PNR
DetailsBob Reichert
nina; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles made wrong corrections on isolate gnd and neut (did in main panel, not sub) need 1 1/4", stapling, light boxes wired, subpanel fixed, accessibility to ground wire and fur out below panels, adding jacuzzi tub, but it is not yet framed in, need to count rooms for permit, met with owner and they wrote items to fix before inspection for ri.
Final1/4/20051/4/20051/4/2005PNR
DetailsPat Lass
Scheduled by a contractor via Hello! on 1/4/2005 at 7:24:35 AM. Contact: ###-####.
isolate neutral in sub panel
protect energized parts 1/4/2005 2:17:59 PM
Conference12/19/200412/20/200412/20/2004APASS
DetailsJim Schmer
Scheduled by a contractor via Hello! on 12/19/2004 at 1:10:52 PM. Contact: ###-####.
Permanent Service12/20/200412/20/200412/20/2004APASS
DetailsJim Schmer
p/s u/g new - changing from o/h to u/g - jms 12/20/2004 9:13:06 AM
Electrical Rough-In12/17/200412/17/200412/17/2004PCANC
DetailsJim Schmer
Scheduled by a contractor via Hello! on 12/17/2004 at 8:35:12 AM. Contact: ###-####.
Electrical Rough-In12/6/200412/6/200412/6/2004PPART
DetailsPat Lass
Scheduled by a contractor via Hello! on 12/6/2004 at 7:36:44 AM. Contact: ###-####.
had conf about service 12/6/2004 8:59:52 PM
ELE-Request for Extension10/26/200410/27/200410/27/2004APASS
DetailsJim Schmer
still working on this project///nina ###-####
Electrical Rough-In5/5/20045/6/20045/6/2004APART
DetailsJack Frank
please ring door bell and talk to nina///###-#### nina electrode ok for dirt cover and conference ok 5/6/2004 9:17:50 AM
Change Status to I  5/5/2004 DONE
per pat's inspection approval to extend on 4/29/04
ELE-Request for Extension4/29/20044/29/20044/29/2004PPART
DetailsPat Lass
NINA ###-####
ok to extend 4/29/2004 10:41:01 AM
Electrical Rough-In11/12/200311/12/200311/12/2003PPART
DetailsPat Lass
NINA INSPECT COPPER GROUND WIRE BEFORE CEMENT POUR ###-####; Phone #: ###-#### Internet Inspection Request from: Annette Moore
ok for concrete 11/12/2003 12:11:36 PM
Electrical Rough-In11/6/200311/7/200311/7/2003ANR
DetailsPat Lass
Nina; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
nobody home no work done 11/7/2003 10:28:11 AM
Rough-In Permanent Service10/28/200310/29/200310/29/2003ANH
DetailsJoe Ray
###-#### Nina not home /no work started/called left message on machine 10/29/2003 8:54:54 AM
Electrical Rough-In10/29/200310/29/200310/29/2003PNR
DetailsPat Lass
nina; Phone #: ###-#### Internet Inspection Request from: Annette Moore
concrete encased electrode not ready 10/29/2003 3:32:48 PM
Extend Permit 180 days 10/28/200310/28/2003 DONE
per Jim's notes on 9/3/03
ELE-Request for Extension9/2/20039/3/20039/3/2003APASS
DetailsPat Lass
###-#### nina
extend permit 9/3/2003 8:54:14 AM
Permanent Service3/24/20033/25/20033/25/2003PNR
DetailsPat Lass
###-####
Had conf COW 3/25/2003 2:54:31 PM
ELE-Request for Extension3/24/20033/24/20033/24/2003PNR
DetailsPat Lass
###-#### nina
extend permit 3/24/2003 11:46:13 AM
Electrical Rough-In9/16/20029/16/20029/16/2002ANR
DetailsPat Lass
CONFERENCE FOR EXTENSION ###-#### NINA
PostCard Mailed  9/13/2002 SENT
PostCard has been mailed requesting inspection.
PostCard Mailed  9/13/2002 SENT
PostCard has been mailed requesting inspection.
Temporary Service8/15/20028/16/20028/16/2002ACANC
DetailsJoe Ray
Scheduled by a contractor via Hello! on 08/15/2002 at 15:42:42. Contact: ###-#### SHOULD HAVE BEEN SERVICE R/I...DLD
Rough-In Permanent Service8/16/20028/16/20028/16/2002ACANC
DetailsJoe Ray
###-#### 8/16/2002 9:34:44 AM
Electrical Rough-In2/14/20022/15/20022/15/2002APART
DetailsMarv Burrus
THIS IS TO EXTEND THE PERMIT\\###-####
Miscellaneous action  4/26/2001 DONE
homeowner called in extend permit for 180 days
Application received  10/4/2000  
Issue PAID IN FULL permit  10/4/2000 DONE