Final | 3/11/2002 | 3/12/2002 | 3/12/2002 | A | FAIL |
Pat Lass
|
|
|
john ###-#### re-insp ground clamp 3/12/2002 11:56:40 AM
|
Final | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PASS |
Pat Lass
|
|
|
re-insp fn --###-#### john
|
DOC - Permit Finaled | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PASS |
Pat Lass
|
|
|
Finaled by inspector at 3/12/2002 2:57:21 PM
|
Final | 3/7/2002 | 3/8/2002 | 3/8/2002 | A | FAIL |
Pat Lass
|
|
|
###-#### too numerous had conf with contractor 3/8/2002 11:04:04 AM
|
Electrical Rough-In | 5/16/2001 | 5/17/2001 | 5/17/2001 | A | PASS |
Pat Lass
|
|
|
lock box 193 \\###-####
|
Rough-In Permanent Service | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PART |
Pat Lass
|
|
|
###-#### jon looked at job and scheduled conf. 2/27/2001 9:51:14 AM
|
Rough-In Permanent Service | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | PASS |
Pat Lass
|
|
|
Scheduled by Inspector: 336 On 2/27/2001 9:48:03 AM P/S U/G N Ok 2/27/2001 2:17:47 PM
|
Receive PAYMENT IN FULL | | | 11/20/2000 | | DONE |
|
|
|
|
Application received | | | 10/20/2000 | | |
|
|
|
|
Issue & PRINT permit | | | 10/20/2000 | | DONE |
|
|
|
|