Final | 3/11/2002 | 3/12/2002 | 3/12/2002 | A | PASS |
Pat Lass
|
|
|
JOHN ###-####
|
DOC - Permit Finaled | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PASS |
Pat Lass
|
|
|
Finaled by inspector at 3/12/2002 11:56:19 AM
|
Final | 3/7/2002 | 3/8/2002 | 3/8/2002 | P | FAIL |
Pat Lass
|
|
|
###-#### water heater or clearance 3/8/2002 11:05:11 AM
|
Final | 2/27/2002 | 2/28/2002 | 2/28/2002 | A | NR |
Pat Lass
|
|
|
JOHN ###-#### shell and core not finaled 00-04069 2/28/2002 10:30:51 AM
|
ELE-Aging Inspection | 1/21/2002 | 1/21/2002 | 1/21/2002 | | NR |
Pat Lass
|
|
|
SUC 1/22/2002 8:50:14 AM
|
ELE-Aging Inspection | 11/19/2001 | 11/19/2001 | 11/19/2001 | | NR |
Pat Lass
|
|
|
suc 11/20/2001 8:42:44 AM
|
Electrical Rough-In | 9/17/2001 | 9/18/2001 | 9/18/2001 | A | PASS |
Pat Lass
|
|
|
###-#### JOHN 193-LOCK BOX
|
ELE-Aging Inspection | 9/17/2001 | 9/17/2001 | 9/17/2001 | | NR |
Pat Lass
|
|
|
SUC 9/17/2001 12:21:37 PM
|
ELE-Aging Inspection | 7/16/2001 | 7/16/2001 | 7/16/2001 | | NR |
Pat Lass
|
|
|
SUC 7/17/2001 8:38:15 AM
|
ELE-Aging Inspection | 5/16/2001 | 5/16/2001 | 5/16/2001 | | NR |
Pat Lass
|
|
|
CHC 5/16/2001 12:46:50 PM
|
ELE-Aging Inspection | 5/15/2001 | 5/15/2001 | 5/15/2001 | | NR |
Pat Lass
|
|
|
CHC 5/16/2001 12:45:29 PM
|
Electrical Rough-In | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PART |
Pat Lass
|
|
|
###-#### lock box at the front door there are three inspections set up and the combo is193
Looked at job and scheduled conf. 2/27/2001 9:51:53 AM
|
Electrical Rough-In | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | FAIL |
Pat Lass
|
|
|
Scheduled by Inspector: 336 On 2/27/2001 9:47:23 AM scuttles nail plates bends in smerf 2/27/2001 2:19:36 PM
|
Application received | | | 2/21/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 2/21/2001 | | DONE |
|
|
|
|