Telephone call | | | 9/24/2001 | | DONE |
Kim Harrison
|
|
|
called 8/28/01
|
Final | 6/27/2001 | 6/27/2001 | 6/27/2001 | P | PASS |
Pat Lass
|
|
|
Heath ###-####
|
DOC - Permit Finaled | 6/27/2001 | 6/27/2001 | 6/27/2001 | P | PASS |
Pat Lass
|
|
|
Finaled by inspector at 6/27/2001 3:44:48 PM
|
Final | 6/26/2001 | 6/26/2001 | 6/26/2001 | P | FAIL |
Pat Lass
|
|
|
partial Heath ###-#### 400-8 6/26/2001 2:41:31 PM
|
Electrical Rough-In | 5/24/2001 | 5/24/2001 | 5/24/2001 | P | PASS |
Pat Lass
|
|
|
Heath ###-####
|
Electrical Rough-In | 5/22/2001 | 5/22/2001 | 5/22/2001 | P | PART |
Pat Lass
|
|
|
heath ###-####
|
Electrical Rough-In | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | PART |
Jack Frank
|
|
|
Heath ###-#### walls ok no ceilings 5/22/2001 12:53:12 PM
|
Electrical Rough-In | 5/18/2001 | 5/18/2001 | 5/18/2001 | P | PART |
Pat Lass
|
|
|
Heath ###-#### walls downstairs only ok 5/18/2001 1:54:27 PM
|
Electrical Rough-In | 5/17/2001 | 5/17/2001 | 5/17/2001 | P | FAIL |
Pat Lass
|
|
|
Heath ###-#### 360 deg bend 300-4 clearance from combustable on fixtures walls covered 5/17/2001 2:55:32 PM
|
Electrical Rough-In | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | PART |
Jack Frank
|
|
|
###-#### u/g partial 4/2/2001 2:09:45 PM
|
Application received | | | 3/27/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 3/27/2001 | | DONE |
|
|
|
|