DOC - Permit Finaled | 8/31/2001 | 8/31/2001 | 8/31/2001 | A | PASS |
Joe Ray
|
|
|
Finaled by inspector at 8/31/2001 7:40:05 AM
|
Final | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 09:38:36. Contact: ###-####.--key in the spr control box by front door
|
Final | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 09:38:36. Contact: ###-####.--key in the spr control box by front door
|
DOC - Permit Finaled | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | PASS |
Joe Ray
|
|
|
Finaled by inspector at 8/30/2001 2:12:51 PM
|
Electrical Rough-In | 6/5/2001 | 6/6/2001 | 6/6/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/05/2001 at 13:27:33. Contact: ###-####. KEY IN SPRINKLER CONTROL BOX BY FRONT PORCH survey for nail plates/ called contr 6/6/2001 9:51:19 AM
|
Electrical Rough-In | 6/5/2001 | 6/5/2001 | 6/5/2001 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/05/2001 at 08:18:30. Contact: ###-####. no access 6/5/2001 3:46:38 PM
|
Application received | | | 5/30/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 5/30/2001 | | DONE |
|
|
|
|