Telephone call | | | 3/27/2002 | | DONE |
|
|
|
|
Final | 10/10/2001 | 10/11/2001 | 10/11/2001 | P | PASS |
Jack Frank
|
|
|
###-#### final ok card signed 10/11/2001 4:28:30 PM
|
DOC - Permit Finaled | 10/11/2001 | 10/11/2001 | 10/11/2001 | P | PASS |
Jack Frank
|
|
|
Finaled by inspector at 10/11/2001 4:28:32 PM
|
Final | 10/9/2001 | 10/10/2001 | 10/10/2001 | A | NR |
Jack Frank
|
|
|
###-#### they will call when ready 10/10/2001 11:33:35 AM
|
Electrical Rough-In | 10/5/2001 | 10/5/2001 | 10/5/2001 | A | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 10/5/2001 10:50:19 AM conference ok low voltage
|
Electrical Rough-In | 10/2/2001 | 10/3/2001 | 10/3/2001 | A | PART |
Jack Frank
|
|
|
###-#### DON electrical ok low voltage wiring still needs work 10/3/2001 11:40:47 AM
|
Electrical Rough-In | 9/20/2001 | 9/20/2001 | 9/20/2001 | P | PART |
Jack Frank
|
|
|
cliff-- ###-#### for conference ok met with J S and contractor ceilings no violations to be retained 9/20/2001 3:15:43 PM
|
Electrical Rough-In | 9/18/2001 | 9/19/2001 | 9/19/2001 | P | FAIL |
Pat Lass
|
|
|
###-#### Support in ceiling had conf 9/19/2001 4:08:49 PM
|
Electrical Rough-In | 9/12/2001 | 9/13/2001 | 9/13/2001 | A | FAIL |
Pat Lass
|
|
|
ceiling \\###-#### overcurrent support grounding 9/13/2001 10:35:36 AM
|
Electrical Rough-In | 7/19/2001 | 7/20/2001 | 7/20/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/19/2001 at 11:50:39. Contact: . walls 2 locations ok 7/19/2001 1:47:51 PM
|
Electrical Rough-In | 7/12/2001 | 7/12/2001 | 7/12/2001 | P | FAIL |
Jack Frank
|
|
|
###-#### called contractor , and left message to find out what they want inspected no one at job site 7/12/2001 5:16:14 PM do not cover posted 7/12/2001 5:16:37 PM
|
Electrical Rough-In | 7/5/2001 | 7/5/2001 | 7/5/2001 | P | PART |
Jack Frank
|
|
|
Carrie ###-#### done by 7/5/2001 4:55:39 PM PLass 7/5/2001 4:55:50 PM
|
Electrical Rough-In | 7/5/2001 | 7/5/2001 | 7/5/2001 | P | PART |
Pat Lass
|
|
|
Added by Inspector: 336 On 7/5/2001 1:58:49 PM partial on walls two rooms had unused openings or connector
|
Application received | | | 7/3/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 7/3/2001 | | DONE |
|
|
|
|