Telephone call | | | 4/26/2002 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/18/2002 | | |
|
|
|
|
Final | 2/11/2002 | 2/11/2002 | 2/11/2002 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/11/2002 at 08:45:22. Contact: ###-####.entire building and outside pedestal
|
DOC - Permit Finaled | 2/11/2002 | 2/11/2002 | 2/11/2002 | P | PASS |
Pat Lass
|
|
|
Finaled by inspector at 2/11/2002 3:51:15 PM
|
Rough-In Permanent Service | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/14/2002 at 15:41:33. Contact: ###-####. signed t/O 1/15/2002 11:05:14 AM
|
Permanent Service | 1/15/2002 | 1/15/2002 | 1/15/2002 | P | DONE |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/15/2002 at 08:48:49. Contact: ###-####.
|
Permanent Service | 1/11/2002 | 1/14/2002 | 1/14/2002 | P | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/11/2002 at 10:31:49. Contact: ###-####.
|
Electrical Rough-In | 12/10/2001 | 12/11/2001 | 12/11/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/10/2001 at 11:19:21. Contact: ###-####. ceiling ok 12/11/2001 11:13:37 AM
|
Electrical Rough-In | 12/3/2001 | 12/4/2001 | 12/4/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 10:38:17. Contact: ###-####. P/S U/G N Ok 12/4/2001 9:29:44 AM
|
Electrical Rough-In | 11/29/2001 | 11/30/2001 | 11/30/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/29/2001 at 09:06:43. Contact: ###-####. Main ceiling ok left correction for space above panel 11/30/2001 11:29:40 AM
|
Electrical Rough-In | 11/20/2001 | 11/21/2001 | 11/21/2001 | A | PART |
Pat Lass
|
|
|
Scheduled /by a contractor via Hello! on 11/20/2001 at 12:12:21. Contact: ###-####. U/G lites ok 11/21/2001 12:31:46 PM
|
Electrical Rough-In | 10/29/2001 | 10/30/2001 | 10/30/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/29/2001 at 08:36:40. Contact: ###-####. Bathroom area nad back door lights 10/30/2001 11:54:41 AM
|
Electrical Rough-In | 10/17/2001 | 10/18/2001 | 10/18/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/17/2001 at 08:43:27. Contact: ###-####.
|
Electrical Rough-In | 10/12/2001 | 10/15/2001 | 10/15/2001 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/12/2001 at 09:27:35. Contact: ###-####. talked with contractor box fill and 300-10 10/15/2001 12:51:16 PM
|
Electrical Rough-In | 10/10/2001 | 10/11/2001 | 10/11/2001 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/10/2001 at 11:44:52. Contact: ###-####. supports of conduit 3ft of boxes 10/11/2001 9:40:45 AM
|
Electrical Rough-In | 10/3/2001 | 10/4/2001 | 10/4/2001 | A | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 10/03/2001 at 10:06:07. Contact: ###-####. underground outside lites 10/4/2001 10:40:38 AM
|
Electrical Rough-In | 9/28/2001 | 10/1/2001 | 10/1/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/28/2001 at 14:57:35. Contact: ###-####. U/G Ok with JB at corner 10/1/2001 9:44:17 AM
|
Electrical Rough-In | 9/24/2001 | 9/24/2001 | 9/24/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 08:59:55. Contact: ###-####. u/g lights both sides ok 9/24/2001 5:43:27 PM
|
Electrical Rough-In | 8/29/2001 | 8/30/2001 | 8/30/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/29/2001 at 13:29:07. Contact: ###-####. part U/G 8/30/2001 9:14:25 AM
|
Electrical Rough-In | 8/28/2001 | 8/29/2001 | 8/29/2001 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/28/2001 at 14:30:30. Contact: ###-####. some u/g for parking lot lights 8/29/2001 9:50:55 AM
|
Electrical Rough-In | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/27/2001 at 14:25:38. Contact: ###-####.--for underground conduit for insp do not cover posted called left message not ready and needs clean fill for cover 8/28/2001 1:15:41 PM
|
Electrical Rough-In | 8/14/2001 | 8/15/2001 | 8/15/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 11:07:44. Contact: ###-####. underslab inspection
|
Electrical Rough-In | 7/20/2001 | 7/23/2001 | 7/23/2001 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/20/2001 at 13:49:15. Contact: ###-####. ufer is in stem wall south of job trailer ok 7/23/2001 9:28:42 AM
|
Electrical Rough-In | 7/20/2001 | 7/20/2001 | 7/20/2001 | P | FAIL |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 07/20/2001 at 11:06:35. Contact: ###-####. for the ufer ground... did not find ufer ground 7/20/2001 12:25:52 PM
|
Application received | | | 7/20/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 7/20/2001 | | DONE |
|
|
|
|