Final | 9/14/2001 | 9/14/2001 | 9/14/2001 | P | PASS |
Pat Lass
|
|
|
###-#### jimmy
|
DOC - Permit Finaled | 9/14/2001 | 9/14/2001 | 9/14/2001 | P | PASS |
Pat Lass
|
|
|
Finaled by inspector at 9/14/2001 4:28:47 PM
|
Electrical Rough-In | 8/1/2001 | 8/2/2001 | 8/2/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 15:33:45. Contact: ###-####. ok
8/2/2001 11:27:19 AM
|
Electrical Rough-In | 8/1/2001 | 8/1/2001 | 8/1/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 08:11:57. Contact: . conference ok no r/i 8/1/2001 2:29:10 PM
|
Electrical Rough-In | 7/30/2001 | 7/31/2001 | 7/31/2001 | A | NR |
Jack Frank
|
|
|
john ###-#### called need to meet contractor at job site, he will arange a meeting with me do not cover posted 7/31/2001 2:40:30 PM
|
Issue permit | | | 7/30/2001 | | DONE |
|
|
|
|
Application received | | | 7/30/2001 | | |
|
|
|
|