Final | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | PASS |
Joe Ray
|
|
|
###-#### dick
|
DOC - Permit Finaled | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | PASS |
Joe Ray
|
|
|
Finaled by inspector at 5/9/2002 3:47:19 PM
|
ELE-Aging Inspection | 12/12/2001 | 12/12/2001 | 12/12/2001 | | NR |
Joe Ray
|
|
|
suc 12/19/2001 9:31:59 AM
|
Electrical Rough-In | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | PASS |
Joe Ray
|
|
|
spa bonding ###-####
|
Electrical Rough-In | 8/24/2001 | 8/27/2001 | 8/27/2001 | A | PASS |
Joe Ray
|
|
|
###-#### pool bond ok 8/27/2001 11:14:29 AM
|
Application received | | | 8/24/2001 | | |
|
|
|
|
Issue permit | | | 8/24/2001 | | DONE |
|
|
|
|